Optimum consulting is concerned about the maximum project time in one of their project management models.Using simulation,they found an estimate of the maximum project time to be about 364 days.To better understand the variability,Optimum consulting has used ________ that estimated the accuracy of the forecast statistics shown in the statistics view of the simulation results.
A) Scenario Analysis tool
B) Decision Table tool
C) 2D Simulation tool
D) Bootstrap tool
Correct Answer:
Verified
Q64: Explain in brief the functions of Crystal
Q65: Describe the procedure used to define assumptions
Q66: _ is an analytical method that determines
Q67: Briefly describe the procedure to run a
Q68: Risk analysis seeks to examine the impacts
Q70: In Crystal Ball,the Forecast Charts show the
Q71: If several cells in the model have
Q72: In Crystal Ball,uncertain inputs are called forecasts.
Q73: Define risk and risk analysis.
Q74: In Crystal Ball,the output variables in which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents