PERT is a network technique similar to CPM,but PERT allows for project crashing,whereas CPM does not.
Correct Answer:
Verified
Q4: Before drawing a PERT or CPM network,
Q5: The identification of the project activities and
Q6: The expected completion time and variance of
Q6: The optimistic time is the greatest amount
Q7: With CPM,we are able to calculate the
Q7: PERT is a deterministic analysis tool allowing
Q8: In PERT, the earliest start time for
Q9: In PERT,the most likely completion time of
Q15: PERT had its beginnings in a military
Q18: With PERT, we are able to calculate