The last step in the DBLC is ____.
A) maintenance and evolution
B) operation
C) testing and evaluation
D) implementation and loading
Correct Answer:
Verified
Q51: The system's _ defines the extent of
Q52: Producing the required information flow is part
Q53: The database is loaded during the _
Q54: The conceptual design step that identifies ER
Q55: The database initial study phase of the
Q56: The SDLC is most important to the
Q58: The implementation of _-produced applications tends to
Q58: After testing is concluded, the final _
Q59: Creating the conceptual design and selecting DBMS
Q60: "What are the requirements of the current
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents