Five jobs are waiting for processing through two work centers.Their processing time (in minutes) at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,what is the optimum sequence of jobs and the minimum time for completion of all jobs?
A) V-T-S-U-R;225
B) U-R-T-S-V;175
C) R-S-T-U-V;240
D) U-S-V-T-R;200
E) R-U-T-S-V;175
Correct Answer:
Verified
Q59: Lockport Marine Services,Inc.wishes to assign a set
Q60: Machines A,B,C,and D have been in use
Q61: Five jobs are waiting to be processed.Their
Q65: Five jobs are waiting to be processed.Their
Q72: When a set of jobs must pass
Q72: Which of the following is a limitation
Q73: Which critical ratio value implies that a
Q77: Which of the following is an advantage
Q80: Flow time represents the time:
A)an order spends
Q99: The priority rule that appears fair to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents