A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. They wish to produce 600 units per day, working two 8-hour shifts.
a. Draw a network diagram of precedence relationships.
b. Compute the required cycle time per unit in seconds.
c. Compute the minimum number of workstations required to produce 600 units per day.
d. Balance this line using longest processing time.
e. What is the efficiency of the line obtained in part d?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q92: A work cell is scheduled to build
Q143: An assembly line with 11 tasks is
Q143: A firm is planning to set up
Q146: Brandon's computer shop has hired a consultant
Q149: The flow and distance data in the
Q150: A work cell is required to make
Q151: A work cell is required to make
Q152: A manufacturing work cell has a takt
Q152: An insurance claims processing center has six
Q153: An airport is trying to balance where
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents