These are the costs associated with system defects before a system is fully deployed (for example, scrap, rework) .
A) External failure costs
B) Internal failure costs
C) Cost of nonconformance
D) Cost of quality
Correct Answer:
Verified
Q48: The computer industry, more so than some
Q49: _ means the product needs to be
Q50: These are the costs associated with system
Q51: Project managers must make sure that both
Q52: The _ diagram is a cause-and-effect tool
Q54: A cost and time disparity estimate exists
Q55: Benchmarking is a technique that allows for
Q56: Noise is anything that interferes with the
Q57: _ design methods, the modern name given
Q58: _ focuses on the three areas of