In which of the following project approaches is owner oversight most difficult to apply?
A) Design/Bid/Build lump sum
B) Design/Bid/Build GMP
C) Design/Build
D) Construction project management
E) Owner oversight is a function of staffing, not of the chosen delivery method or contract.
Correct Answer:
Verified
Q1: The term fast track--------
A) Is synonymous with
Q2: An advantage of the design/build approach is
Q3: In a pure construction management approach the
Q4: In a guaranteed maximum price (GMP) contract,
Q5: A unit-price contract provides an owner with
Q6: The choice of which delivery method is
Q7: Historically, a "master builder" was hired to
Q8: A project is rushed into design without
Q10: When assessing the risks applicable to a