Historically, a "master builder" was hired to build a project. Today, the same approach would be most like which delivery method?
A) Design/Bid/Build with a lump sum bid
B) Design/Bid/Build with a GMP
C) Construction project management
D) Design/Build
E) Unit-price contract
Correct Answer:
Verified
Q1: The term fast track--------
A) Is synonymous with
Q2: An advantage of the design/build approach is
Q3: In a pure construction management approach the
Q4: In a guaranteed maximum price (GMP) contract,
Q5: A unit-price contract provides an owner with