A project is rushed into design without a total understanding of the owner's needs. As the project moves through the design, additional requirements are added, increasing the project budget. This is an example of ????
A) Project acceleration
B) Fast tracking
C) Scope creep
D) Separated functions
E) None of the above
Correct Answer:
Verified
Q1: The term fast track--------
A) Is synonymous with
Q2: An advantage of the design/build approach is
Q3: In a pure construction management approach the
Q4: In a guaranteed maximum price (GMP) contract,
Q5: A unit-price contract provides an owner with
Q6: The choice of which delivery method is
Q7: Historically, a "master builder" was hired to
Q9: In which of the following project approaches
Q10: When assessing the risks applicable to a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents