An action plan for change should include:
A) clear plans about who is to do what, and when and how, in order to achieve the desired goal.
B) a brainstormed list of all the action steps required to move towards the goal.
C) a review and sequencing of all the action steps that have been identified.
D) the assignment of start and finish dates to each of the action steps.
E) All of these responses are correct.
Correct Answer:
Verified
Q1: Which of the following is not related
Q2: If organisations that fall within the pattern
Q3: The strategy that is likely to be
Q4: Which of the following statements is generally
Q6: Explaining why a change is necessary and
Q7: The two types of change are, first,
Q8: Which of the following is an example
Q9: If those involved in a change process
Q10: Once a change is introduced, the next
Q11: Gap analysis can be used in a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents