The last step in DBR production scheduling is to?
A) Identify the constrained resource(s) or bottleneck(s) in the system
B) Synchronize the release of work
C) Use inventory buffers at the critical bottlenecks
D) Forecast the demand
Correct Answer:
Verified
Q21: The bottleneck process represents which of the
Q22: Cross-training workers can help?
A) Increase flexibility
B) Decrease
Q23: A solid line in a material flow
Q24: If a bottleneck process has a processing
Q25: DBR stands for?
A) Drum, Buffer, Regular
B) Drum,
Q27: Identifying and improving constrained processes is the
Q28: Having _ manufacturing flexibility is desirable.
A) Increased
B)
Q29: The scheduling of work releases to a
Q30: Material flow analysis can help to answer
Q31: Procedure and behavioral constraints include all of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents