If a bottleneck process has a processing rate of 20 units per hour, what is the processing rate of the system?
A) Less than 20 units per hour
B) 20 units per hour
C) More than 20 units per hour
D) The processing rate cannot be determined from the information given
Correct Answer:
Verified
Q19: In a material flow map, a triangle
Q20: Material flow mapping involves all of the
Q21: The bottleneck process represents which of the
Q22: Cross-training workers can help?
A) Increase flexibility
B) Decrease
Q23: A solid line in a material flow
Q25: DBR stands for?
A) Drum, Buffer, Regular
B) Drum,
Q26: The last step in DBR production scheduling
Q27: Identifying and improving constrained processes is the
Q28: Having _ manufacturing flexibility is desirable.
A) Increased
B)
Q29: The scheduling of work releases to a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents