Procedure and behavioral constraints include all of the following except?
A) Manufacturing bottlenecks
B) Poor training programs
C) Poor cultural norms in the organization
D) Poor management decisions
Correct Answer:
Verified
Q26: The last step in DBR production scheduling
Q27: Identifying and improving constrained processes is the
Q28: Having _ manufacturing flexibility is desirable.
A) Increased
B)
Q29: The scheduling of work releases to a
Q30: Material flow analysis can help to answer
Q32: Evaluating a process for effectiveness, quality, and
Q33: Inventory held downstream of the bottleneck process
Q34: In an organization, something that keeps the
Q35: The Theory of Constraints was popularized by
Q36: Automation and standardized procedures are often used
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents