With a maturity risk of 0.3,a complexity risk of 0.2,and a dependency risk of 0.2,the probability of failure is:
A) about 0.23.
B) about 0.7.
C) about 0.012.
D) about 0.45.
Correct Answer:
Verified
Q70: With the failure probability and consequence scores
Q71: The professor wore both a belt and
Q73: Use the failure probability and consequence scores
Q74: The firm set aside a little extra
Q76: The project team toiled long into the
Q77: The expected cost of an item that
Q77: It was well known that the cost
Q78: Use the failure probability and consequence scores
Q79: The consequences of failure categories of cost,schedule,reliability,and
Q80: Twenty-thousand dollars was budgeted for the office
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents