With the failure probability and consequence scores shown in the table,compute the overall risk factor for the project.
A) less than or equal to 0.3
B) greater than 0.3 but less than or equal to 0.4
C) greater than 0.4 but less than or equal to 0.5
D) greater than 0.5
Correct Answer:
Verified
Q65: Fred Knievel took out a substantial life
Q66: Project penalty clauses that initiate at mutually
Q67: If the risk of a negative outcome
Q68: With a cost factor of 0.1,a schedule
Q69: The Farm Fresh Egg project was too
Q71: The professor wore both a belt and
Q73: Use the failure probability and consequence scores
Q74: The firm set aside a little extra
Q75: With a maturity risk of 0.3,a complexity
Q77: The expected cost of an item that