Use the failure probability and consequence scores shown in the table to determine the overall risk factor for the project.Based on your analysis,the overall project has a(n) :
A) low risk.
B) medium risk.
C) high risk.
D) unacceptable risk.
Correct Answer:
Verified
Q73: Use the failure probability and consequence scores
Q74: The firm set aside a little extra
Q75: With a maturity risk of 0.3,a complexity
Q76: The project team toiled long into the
Q77: It was well known that the cost
Q79: The consequences of failure categories of cost,schedule,reliability,and
Q80: Twenty-thousand dollars was budgeted for the office
Q81: The first phase of a comprehensive project
Q82: A typical risk management report form does
Q86: The tasks of reviewing and refining the