Use the Failure Probability and Consequence Scores Shown in the Table

Question 45

Multiple Choice

Use the failure probability and consequence scores shown in the table to determine the overall risk factor for the project. Based on your analysis, the overall project has a: Use the failure probability and consequence scores shown in the table to determine the overall risk factor for the project. Based on your analysis, the overall project has a:   A)  low risk. B)  medium risk. C)  high risk. D)  unacceptable risk.


A) low risk.
B) medium risk.
C) high risk.
D) unacceptable risk.