Solved

With the Failure Probability and Consequence Scores Shown in the Table

Question 50

Multiple Choice

With the failure probability and consequence scores shown in the table, compute the overall risk factor for the project. With the failure probability and consequence scores shown in the table, compute the overall risk factor for the project.   A)  less than or equal to 0.3 B)  greater than 0.3 but less than or equal to 0.4 C)  greater than 0.4 but less than or equal to 0.5 D)  greater than 0.5


A) less than or equal to 0.3
B) greater than 0.3 but less than or equal to 0.4
C) greater than 0.4 but less than or equal to 0.5
D) greater than 0.5

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents