Deck 1: Introduction to Project Management

Full screen (f)
exit full mode
Question
Managing the triple constraint primarily involves making trade-offs between resources and quality.
Use Space or
up arrow
down arrow
to flip the card.
Question
A difference between operations and projects is that operations end when their objectives have been reached, whereas projects do not.
Question
Questions about how a team will track schedule performance is related to a project's scope.
Question
The importance of stakeholders' needs and expectations is limited to the beginning of a project.
Question
One of the main reasons why project management is challenging is because of the factor of uncertainty.
Question
Opponents of a project do not belong to the category of stakeholders.
Question
Earned value management is a tool primarily used in human resource management.
Question
Every project should have a well-defined objective.
Question
Projects should be developed in increments.
Question
In order to be realistic, a project manager should always set discrete goals instead of a range of objectives.
Question
A project's stakeholders includes its customers, users, and suppliers.
Question
Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries.
Question
Responsibility assignment matrices and project organizational charts are examples of tools used in procurement management.
Question
Project procurement management primarily involves identifying stakeholder needs while managing their engagement throughout the life of the project.
Question
Project human resource management is concerned with making effective use of the people involved with a project.
Question
The primary role of project stakeholder management is to ensure that the project will satisfy the stated needs for which it was undertaken.
Question
A project manager's primary role is to provide the funding for a project.
Question
Stakeholder analyses, work requests, and project charters are tools used in integration management.
Question
Resources in a project should be used effectively because they are limited.
Question
The only responsibility of a project manager is to meet the specific scope, time, and cost goals of a project.
Question
Individual projects always address strategic goals whereas portfolio management addresses tactical goals.
Question
Which of the following is a difference between projects and operations?

A)Projects are undertaken to sustain an organization's business whereas operations are not. 
B)Operations are undertaken to create unique products, services, or results whereas projects are not. 
C)Projects are temporary endeavors whereas an organization's operations are ongoing in nature. 
D)Operations have well-defined objectives whereas projects do not need to have a unique purpose.
Question
Project procurement management mainly involves:

A)making effective use of the people involved with the project. 
B)buying goods and services for a project from outside the performing organization. 
C)generating, collecting, disseminating, and storing project information. 
D)identifying and analyzing stakeholder?needs while managing and controlling their engagement.
Question
The role of a _____ is to provide direction and funding for a project.

A)project sponsor
B)project manager  
C)support staff member
D)project team
Question
Steve, an engineer in a construction company, is at present working on a home construction project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is _____.

A)Steve
B)the support staff  
C)the project team
D)the Robinson family
Question
Maturity models, statistical methods, and test plans are examples of tools used in quality management.
Question
According to a 2013 CHAOS study, user involvement is the most important factor that contributes to the success of IT projects.​
Question
Program managers are change agents.
Question
It is mandatory for project managers working on large information technology projects to be experts in the field of information technology.
Question
Project _____ management involves defining and managing all the work required to complete the project successfully.

A)human resource
B)scope  
C)time
D)cost
Question
The introduction of new software makes basic tools, such as Gantt charts and network diagrams, inexpensive and easy to create.
Question
Which of the following is true of projects?

A)They have an indefinite beginning and end. 
B)They have a unique purpose. 
C)They are developed using regressive elaboration. 
D)They are permanent in nature.
Question
To be a successful manager, the only skills an IT project manager needs to possess is excellent technical skills.
Question
Effective program managers recognize that managing a project is much more complex than managing a program.
Question
The enterprise project management software, which aids project and portfolio management, is a low-end tool.
Question
Project _____ management ensures that the project will satisfy the stated or implied needs for which it was undertaken.

A)cost
B)time  
C)risk
D)quality
Question
Which of the following project management knowledge areas primarily involve generating, collecting, disseminating, and storing project information?

A)Project cost management
B)Project procurement management  
C)Project time management
D)Project communications management
Question
Good project managers assume that their definition of success is the same as the sponsors.
Question
Galaxy, a construction company, buys a particular brand of tiles manufactured by Tiles and Floors, an eco-friendly tile manufacturing company. However, Tiles and Floors has declared bankruptcy and closed down. At present, Galaxy is facing a crisis because there are no other manufacturers in the market that supplies eco-friendly tiles. Which of the following constraints is Galaxy currently facing?

A)Resources
B)Time  
C)Scope
D)Cost
Question
Project managers work with the project sponsors to define success for particular projects.
Question
A _____ is a tool used in risk management.

A)work breakdown structure
B)project organizational chart  
C)critical path analysis
D)probability matrice
Question
A _____ is an organizational group responsible for coordinating the project management function throughout an organization.

A)Project Management Office
B)Project Management Professional  
C)Project Management Center
D)Portfolio Group
Question
Which of the following statements is true of project management?

A)It is a simple discipline with a limited scope. 
B)It has specific tools which work universally across all kinds of projects. 
C)It does not guarantee successes for all projects. 
D)Its framework consists solely of project management knowledge areas.
Question
Which of the following is a difference between project management and portfolio?management?

A)Project management involves making wise investment decisions whereas portfolio management does not. 
B)Portfolio management is an easy task whereas project management is a more difficult task. 
C)Portfolio management asks questions like, "Are we carrying out projects efficiently?" whereas project management asks questions such as "Are we investing in the right areas?"  
D)Project management addresses specific, short-term goals whereas portfolio management focuses on long-term goals.
Question
A _____ is a tool used in quality management.

A)probability matrice
B)checklist  
C)request for proposal
D)critical path analysis
Question
A critical path:

A)is the shortest path through a network diagram. 
B)represents schedule information in calendar form. 
C)determines the earliest completion date of a project. 
D)is a quality management tool to ensure a project meets the minimum quality standards.
Question
Which of the following project management knowledge areas is an overarching function that affects and is affected by the different knowledge areas?

A)Project cost management
B)Project stakeholder management  
C)Project integration management
D)Project communications management
Question
Martha works as a project manager at a bank. Due to certain changes in external factors, Martha needs to make a few alterations in the tactical goals of her project. In such a scenario, which of the following will best help Martha cope with the change?

A)Negotiation
B)Project environment knowledge  
C)Motivation
D)Soft skills
Question
Joe is a project manager in an IT company and has over the years, gained substantial knowledge in his area of work. However, while managing his team, he often loses his temper. In addition, he fails to be an active listener when his team members approach him with work related challenges. In which of the following areas does Joe need to develop his skills in?

A)Application area knowledge
B)Project environment knowledge  
C)Standards and regulations
D)Human relations skills
Question
Which of the following best defines the role of leaders?

A)They focus on short-term objectives. 
B)They work on achieving primarily tactical goals. 
C)They work solely toward day-to-day details of meeting specific tasks. 
D)They inspire people to reach goals.
Question
Which of the following tools are most likely to be used in project time management?

A)Payback analysis
B)Impact matrices  
C)Gantt charts
D)Fishbone diagrams
Question
A Gantt chart is a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a ____ format.

A)calendar
B)line graph  
C)bar graph
D)pie chart
Question
In which of the following areas of management is payback analysis most likely to be used?

A)Human resource
B)Communication  
C)Cost
D)Quality
Question
Fast tracking is an example of a tool used in _____ management.

A)time
B)quality  
C)communication
D)risk
Question
An important tool for project scope management is _____.

A)fast tracking
B)crashing  
C)a Gantt chart
D)a work breakdown structure
Question
Team building exercises and motivation techniques are tools used in _____ management.

A)procurement
B)scope  
C)human resource
D)cost
Question
Which of the following questions reflect the strategic goals of project portfolio management?

A)Are we carrying out projects well?  
B)Are projects on time and on budget?  
C)Are we investing in the right areas?  
D)Do stakeholders know what they should be doing?
Question
Which of the following tools can best help in efficient communication management?

A)Kick-off meetings
B)Impact matrices  
C)Requests for quotes
D)Fast tracking
Question
A difference between strategic and tactical goals is that:

A)strategic goals are more specific than tactical goals. 
B)tactical goals encompass broader dimensions than strategic goals. 
C)tactical goals are more important for a project than strategic goals. 
D)strategic goals are long-term in nature whereas tactical goals are short-term.
Question
Which of the following is true of program managers?

A)They report to project managers who represent the next level in the hierarchy. 
B)They recognize that managing a program is simpler than managing a project. 
C)They provide leadership and direction for project managers heading the projects within a program. 
D)They are responsible solely for the delivery of project results.
Question
A(n) _____ is a temporary endeavor undertaken to create a unique product, service, or result.
Question
Which of the following is true of low-end tools of the project management software?

A)They are designed for especially large projects with multiple users. 
B)Their main advantage is that they have unlimited functionality. 
C)They provide basic project management features. 
D)They are referred to as an enterprise project management software.
Question
The question, "What unique product does the customer expect from the project?" is an example of a(n) _____ constraint.
Question
In project management, the three limitations of scope, time, and cost are referred to as the _____.
Question
Enterprise project management softwares are also known as _____ tools of project management software.

A)baseline
B)midrange  
C)low-end
D)high-end
Question
Which of the following types of tools is usually recommended for small projects and single users?

A)Low-end
B)Midrange  
C)High-end
D)Upper range
Question
_____ is "the application of knowledge, skills, tools, and techniques to project activities to meet project requirements."
Question
_____ include people, hardware, software, or other assets.
Question
Project _____ management includes estimating how long it will take to complete work, develop an acceptable project schedule, and ensure timely completion of a project.
Question
The question, "What is the project's schedule?" is an example of a(n) _____ constraint.
Question
Which of the following is a difference between low-end and midrange tools of the project management software?

A)Low-end tools are designed to handle primarily multiple users whereas midrange tools are created to handle single users. 
B)Low-end tools provide robust capabilities to handle dispersed workgroups whereas midrange tools do not. 
C)Midrange tools provide basic project management features whereas low-end tools offer enterprise and portfolio management functions. 
D)Midrange tools are designed to handle larger projects than low-end tools.
Question
Which of the following provides certification as a Project Management Professional?

A)PMS
B)PMC  
C)PMI
D)PMP
Question
Project management _____ describe the key competencies that project managers must develop.
Question
"What is the project's budget?" This is an example of a project's _____ constraint.
Question
_____ refers to work done in organizations to sustain the business.
Question
Until the 1980s, project management primarily focused on providing _____ and resource data to top management in the military, computer, and construction industries.
Question
Which of the following refers to a set of principles that guides decision making based on personal values of what is considered right and wrong?

A)Ethics
B)Civics  
C)Laws
D)Politics
Question
The _____ of project management includes quality, scope, time, and cost constraints.
Question
Project _____ management consists of preparing and managing the budget for a project.
Question
A project's sponsor is also known as a(n) _____.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/96
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: Introduction to Project Management
1
Managing the triple constraint primarily involves making trade-offs between resources and quality.
False
Explanation: Managing the triple constraint involves making trade-offs between scope, time, and cost goals for a project. Experienced project managers know that one must decide which aspect of the triple constraint is most important.
2
A difference between operations and projects is that operations end when their objectives have been reached, whereas projects do not.
False
Explanation: Projects are different from operations in that they end when their objectives have been reached or the project has been terminated.
3
Questions about how a team will track schedule performance is related to a project's scope.
False
Explanation: Project scope deals with questions such as, "What work will be done as part of the project?", "What unique product, service, or result does the customer or sponsor expect from the project?", or "How will the scope be verified?"
4
The importance of stakeholders' needs and expectations is limited to the beginning of a project.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
5
One of the main reasons why project management is challenging is because of the factor of uncertainty.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
6
Opponents of a project do not belong to the category of stakeholders.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
7
Earned value management is a tool primarily used in human resource management.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
8
Every project should have a well-defined objective.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
9
Projects should be developed in increments.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
10
In order to be realistic, a project manager should always set discrete goals instead of a range of objectives.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
11
A project's stakeholders includes its customers, users, and suppliers.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
12
Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
13
Responsibility assignment matrices and project organizational charts are examples of tools used in procurement management.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
14
Project procurement management primarily involves identifying stakeholder needs while managing their engagement throughout the life of the project.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
15
Project human resource management is concerned with making effective use of the people involved with a project.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
16
The primary role of project stakeholder management is to ensure that the project will satisfy the stated needs for which it was undertaken.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
17
A project manager's primary role is to provide the funding for a project.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
18
Stakeholder analyses, work requests, and project charters are tools used in integration management.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
19
Resources in a project should be used effectively because they are limited.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
20
The only responsibility of a project manager is to meet the specific scope, time, and cost goals of a project.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
21
Individual projects always address strategic goals whereas portfolio management addresses tactical goals.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following is a difference between projects and operations?

A)Projects are undertaken to sustain an organization's business whereas operations are not. 
B)Operations are undertaken to create unique products, services, or results whereas projects are not. 
C)Projects are temporary endeavors whereas an organization's operations are ongoing in nature. 
D)Operations have well-defined objectives whereas projects do not need to have a unique purpose.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
23
Project procurement management mainly involves:

A)making effective use of the people involved with the project. 
B)buying goods and services for a project from outside the performing organization. 
C)generating, collecting, disseminating, and storing project information. 
D)identifying and analyzing stakeholder?needs while managing and controlling their engagement.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
24
The role of a _____ is to provide direction and funding for a project.

A)project sponsor
B)project manager  
C)support staff member
D)project team
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
25
Steve, an engineer in a construction company, is at present working on a home construction project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is _____.

A)Steve
B)the support staff  
C)the project team
D)the Robinson family
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
26
Maturity models, statistical methods, and test plans are examples of tools used in quality management.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
27
According to a 2013 CHAOS study, user involvement is the most important factor that contributes to the success of IT projects.​
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
28
Program managers are change agents.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
29
It is mandatory for project managers working on large information technology projects to be experts in the field of information technology.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
30
Project _____ management involves defining and managing all the work required to complete the project successfully.

A)human resource
B)scope  
C)time
D)cost
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
31
The introduction of new software makes basic tools, such as Gantt charts and network diagrams, inexpensive and easy to create.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following is true of projects?

A)They have an indefinite beginning and end. 
B)They have a unique purpose. 
C)They are developed using regressive elaboration. 
D)They are permanent in nature.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
33
To be a successful manager, the only skills an IT project manager needs to possess is excellent technical skills.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
34
Effective program managers recognize that managing a project is much more complex than managing a program.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
35
The enterprise project management software, which aids project and portfolio management, is a low-end tool.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
36
Project _____ management ensures that the project will satisfy the stated or implied needs for which it was undertaken.

A)cost
B)time  
C)risk
D)quality
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following project management knowledge areas primarily involve generating, collecting, disseminating, and storing project information?

A)Project cost management
B)Project procurement management  
C)Project time management
D)Project communications management
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
38
Good project managers assume that their definition of success is the same as the sponsors.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
39
Galaxy, a construction company, buys a particular brand of tiles manufactured by Tiles and Floors, an eco-friendly tile manufacturing company. However, Tiles and Floors has declared bankruptcy and closed down. At present, Galaxy is facing a crisis because there are no other manufacturers in the market that supplies eco-friendly tiles. Which of the following constraints is Galaxy currently facing?

A)Resources
B)Time  
C)Scope
D)Cost
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
40
Project managers work with the project sponsors to define success for particular projects.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
41
A _____ is a tool used in risk management.

A)work breakdown structure
B)project organizational chart  
C)critical path analysis
D)probability matrice
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
42
A _____ is an organizational group responsible for coordinating the project management function throughout an organization.

A)Project Management Office
B)Project Management Professional  
C)Project Management Center
D)Portfolio Group
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following statements is true of project management?

A)It is a simple discipline with a limited scope. 
B)It has specific tools which work universally across all kinds of projects. 
C)It does not guarantee successes for all projects. 
D)Its framework consists solely of project management knowledge areas.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following is a difference between project management and portfolio?management?

A)Project management involves making wise investment decisions whereas portfolio management does not. 
B)Portfolio management is an easy task whereas project management is a more difficult task. 
C)Portfolio management asks questions like, "Are we carrying out projects efficiently?" whereas project management asks questions such as "Are we investing in the right areas?"  
D)Project management addresses specific, short-term goals whereas portfolio management focuses on long-term goals.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
45
A _____ is a tool used in quality management.

A)probability matrice
B)checklist  
C)request for proposal
D)critical path analysis
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
46
A critical path:

A)is the shortest path through a network diagram. 
B)represents schedule information in calendar form. 
C)determines the earliest completion date of a project. 
D)is a quality management tool to ensure a project meets the minimum quality standards.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following project management knowledge areas is an overarching function that affects and is affected by the different knowledge areas?

A)Project cost management
B)Project stakeholder management  
C)Project integration management
D)Project communications management
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
48
Martha works as a project manager at a bank. Due to certain changes in external factors, Martha needs to make a few alterations in the tactical goals of her project. In such a scenario, which of the following will best help Martha cope with the change?

A)Negotiation
B)Project environment knowledge  
C)Motivation
D)Soft skills
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
49
Joe is a project manager in an IT company and has over the years, gained substantial knowledge in his area of work. However, while managing his team, he often loses his temper. In addition, he fails to be an active listener when his team members approach him with work related challenges. In which of the following areas does Joe need to develop his skills in?

A)Application area knowledge
B)Project environment knowledge  
C)Standards and regulations
D)Human relations skills
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following best defines the role of leaders?

A)They focus on short-term objectives. 
B)They work on achieving primarily tactical goals. 
C)They work solely toward day-to-day details of meeting specific tasks. 
D)They inspire people to reach goals.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following tools are most likely to be used in project time management?

A)Payback analysis
B)Impact matrices  
C)Gantt charts
D)Fishbone diagrams
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
52
A Gantt chart is a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a ____ format.

A)calendar
B)line graph  
C)bar graph
D)pie chart
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
53
In which of the following areas of management is payback analysis most likely to be used?

A)Human resource
B)Communication  
C)Cost
D)Quality
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
54
Fast tracking is an example of a tool used in _____ management.

A)time
B)quality  
C)communication
D)risk
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
55
An important tool for project scope management is _____.

A)fast tracking
B)crashing  
C)a Gantt chart
D)a work breakdown structure
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
56
Team building exercises and motivation techniques are tools used in _____ management.

A)procurement
B)scope  
C)human resource
D)cost
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
57
Which of the following questions reflect the strategic goals of project portfolio management?

A)Are we carrying out projects well?  
B)Are projects on time and on budget?  
C)Are we investing in the right areas?  
D)Do stakeholders know what they should be doing?
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following tools can best help in efficient communication management?

A)Kick-off meetings
B)Impact matrices  
C)Requests for quotes
D)Fast tracking
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
59
A difference between strategic and tactical goals is that:

A)strategic goals are more specific than tactical goals. 
B)tactical goals encompass broader dimensions than strategic goals. 
C)tactical goals are more important for a project than strategic goals. 
D)strategic goals are long-term in nature whereas tactical goals are short-term.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following is true of program managers?

A)They report to project managers who represent the next level in the hierarchy. 
B)They recognize that managing a program is simpler than managing a project. 
C)They provide leadership and direction for project managers heading the projects within a program. 
D)They are responsible solely for the delivery of project results.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
61
A(n) _____ is a temporary endeavor undertaken to create a unique product, service, or result.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
62
Which of the following is true of low-end tools of the project management software?

A)They are designed for especially large projects with multiple users. 
B)Their main advantage is that they have unlimited functionality. 
C)They provide basic project management features. 
D)They are referred to as an enterprise project management software.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
63
The question, "What unique product does the customer expect from the project?" is an example of a(n) _____ constraint.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
64
In project management, the three limitations of scope, time, and cost are referred to as the _____.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
65
Enterprise project management softwares are also known as _____ tools of project management software.

A)baseline
B)midrange  
C)low-end
D)high-end
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
66
Which of the following types of tools is usually recommended for small projects and single users?

A)Low-end
B)Midrange  
C)High-end
D)Upper range
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
67
_____ is "the application of knowledge, skills, tools, and techniques to project activities to meet project requirements."
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
68
_____ include people, hardware, software, or other assets.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
69
Project _____ management includes estimating how long it will take to complete work, develop an acceptable project schedule, and ensure timely completion of a project.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
70
The question, "What is the project's schedule?" is an example of a(n) _____ constraint.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
71
Which of the following is a difference between low-end and midrange tools of the project management software?

A)Low-end tools are designed to handle primarily multiple users whereas midrange tools are created to handle single users. 
B)Low-end tools provide robust capabilities to handle dispersed workgroups whereas midrange tools do not. 
C)Midrange tools provide basic project management features whereas low-end tools offer enterprise and portfolio management functions. 
D)Midrange tools are designed to handle larger projects than low-end tools.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
72
Which of the following provides certification as a Project Management Professional?

A)PMS
B)PMC  
C)PMI
D)PMP
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
73
Project management _____ describe the key competencies that project managers must develop.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
74
"What is the project's budget?" This is an example of a project's _____ constraint.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
75
_____ refers to work done in organizations to sustain the business.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
76
Until the 1980s, project management primarily focused on providing _____ and resource data to top management in the military, computer, and construction industries.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
77
Which of the following refers to a set of principles that guides decision making based on personal values of what is considered right and wrong?

A)Ethics
B)Civics  
C)Laws
D)Politics
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
78
The _____ of project management includes quality, scope, time, and cost constraints.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
79
Project _____ management consists of preparing and managing the budget for a project.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
80
A project's sponsor is also known as a(n) _____.
Unlock Deck
Unlock for access to all 96 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 96 flashcards in this deck.