_____ is a parametric model using dependent variables based upon one or more independent variables that are measures of performance or physical attributes of the system.
A) COCOMO
B) LOC
C) HEURISTICS.
D) CHECKPOINT
E) SLIM
Correct Answer:
Verified
Q21: The first step in accurately estimating an
Q56: An entity or data set that includes
Q57: With COCOMO,_ projects are challenging in that
Q58: Something that includes a combination of inputs
Q59: LOC in a software application program
A)can be
Q60: _ refers to a broad range of
Q65: Explain why people who do the work
Q75: What is a WBS? What purpose does
Q76: What is the proper level of detail
Q80: What is guesstimating? Why should a project