Something that includes a combination of inputs and outputs for retrieving data from either the internal files or from files external to the application would be called an:
A) Internal Logical File ILF)
B) External Interface File EIF)
C) External Input EI)
D) External Output EO)
E) External Inquiry EQ)
Correct Answer:
Verified
Q55: _ is a parametric model using dependent
Q56: An entity or data set that includes
Q57: With COCOMO,_ projects are challenging in that
Q59: LOC in a software application program
A)can be
Q60: _ refers to a broad range of
Q63: Under the COCOMO model,describe the organic,semi-detached,and embedded
Q70: What is time boxing? What are some
Q72: Describe top-down estimating.What are some advantages and
Q76: What is the proper level of detail
Q80: What is guesstimating? Why should a project
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents