Five jobs are waiting for processing through two work centers. Their processing time (in minutes) at each work center is contained in the table below. Each job requires work center Alpha before work center Beta. According to Johnson's rule, what is the optimum sequence of jobs and the minimum time for completion of all jobs?
A) V-T-S-U-R; 225
B) U-R-T-S-V; 175
C) R-S-T-U-V; 240
D) U-S-V-T-R; 200
E) none of the above
Correct Answer:
Verified
Q60: A work center is interested in limiting
Q61: Use of the shortest processing time sequencing
Q63: Which of the following dispatching rules is
Q66: Which of the following are limitations of
Q67: Five jobs are waiting to be
Q68: Eight jobs have been sequenced at a
Q69: Which of the following is an advantage
Q70: Five jobs are waiting for processing
Q80: Flow time represents the time:
A)an order spends
Q101: A recent advance in short-term scheduling that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents