Calculation by the "________" method requires a survey of the site showing the elevation of the existing grade at each intersection point on the grid.
A) grid
B) grade
C) elevation
D) intersection
Correct Answer:
Verified
Q10: Contractors are usually advised in the "_"
Q11: Measuring sitework and excavation work is the
Q12: The difference between the volume of the
Q13: _ are electronic devices that enable the
Q14: The volume of excavation for pits or
Q15: Generally, the volume of backfill for a
Q16: Sheet piling is measured in _.
A)square feet
B)cubic
Q17: OSHA's Construction Safety and Health Regulation s
Q18: When a soils report is included with
Q19: The soils report provides information about the