Question 1
Essay
What is the importance of selective coordination? What guidelines cover it?
Question 2
Multiple Choice
The transformer multiplier M
2
is calculated using the formula ____.
Question 3
Multiple Choice
____ can prevent the occurrence of single phasing.
Question 4
Multiple Choice
To meet the requirements of NEC
110.9 and 110.10, it is absolutely necessary to determine the available fault currents at various points on the electrical system. If a ____ study is not done, the selection of overcurrent devices may be in error, resulting in a hazard to life and property.
Question 5
Multiple Choice
The actual impedance value on a UL-listed 25-kilovolt-ampere or larger transformer can vary plus or minus ____ percent from the transformer's marked impedance.
Question 6
Essay
How can you create a selective system using circuit breakers?
Question 7
Essay
How can you create a selective system using fuses?
Question 8
Essay
Under what conditions are series-rated systems most often installed?
Question 9
Multiple Choice
The amount of available short-circuit current decreases as the ____ from the transformer increases.
Question 10
Multiple Choice
If non-series-rated overcurrent devices (standard molded-case circuit breakers) are to be installed in the main switchboard, breakers with adequate ____ must be installed in the panelboards.
Question 11
Multiple Choice
The NEC includes a requirement that the ____ short-circuit current available at the service be field marked at or on the service equipment.
Question 12
Multiple Choice
The amount of short-circuit current from a motor is equal approximately to the starting (____) current for each motor.
Question 13
Multiple Choice
____ power systems are power systems that are generally installed in vital infrastructure facilities that, if destroyed or incapacitated, would disrupt national security, the economy, public health or safety, and where enhanced electrical infrastructure for continuity of operation has been deemed necessary by governmental authority.
Question 14
Multiple Choice
A situation known as ____ occurs when a fault on a branch circuit opens not only the branch-circuit overcurrent device but also the feeder overcurrent device.
Question 15
Multiple Choice
A simple method of determining the available short-circuit currents (also referred to as fault current) at various distances from a given location is the ____ method.
Question 16
Multiple Choice
The value of the square root of three (____) is used frequently in 3-phase calculations.
Question 17
Multiple Choice
To obtain the approximate short-circuit current values when two hot conductors of a 3-phase system are shorted together, use ____ percent of the 3-phase current value.
Question 18
Multiple Choice
What is the approximate line-to-ground arcing fault value on a 480/277-volt system where the line-line-line fault current has been calculated to be 30,000 amperes?