While the PM coordinator is surveying the machine, it is a good idea for him or her to ____.
A) rope off the machine
B) talk to the operator(s)
C) inspect only the crucial parts of the machine
D) inform the plant engineer
Correct Answer:
Verified
Q5: When the PM crew arrives at the
Q6: Which is a part of the OSHA
Q7: It is important that another person remains
Q8: It is the responsibility of the leadperson
Q9: Where can the history of a machine
Q10: A(n) _ should be designated in the
Q11: Once the PM has been totally completed,
Q12: The _ of a machine is very
Q13: On completion of the machine survey, a
Q14: The first thing that a PM coordinator