The highest element in the hierarchical breakdown of the WBS is
A) a work package.
B) sub-deliverables.
C) a cost account.
D) major deliverables.
E) the project.
Correct Answer:
Verified
Q40: "To construct a high-quality, custom home within
Q41: All of the following are usually included
Q42: Which of the following is least likely
Q43: All of the following are ways the
Q44: The integration of the lowest level of
Q46: The lowest element in the hierarchical breakdown
Q47: A Process Breakdown Structure can provide a
Q48: One way for a project manager to
Q49: The WBS is best suited for projects
Q50: A "Dissemination Mode" is
A) how project schedules
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents