The estimating approach that is best to use on projects where there is an unusual amount of uncertainty surrounding the project and when it is impractical to estimate times and costs for the entire project is known as ___________.
A) range estimating
B) parametric procedure
C) template method
D) phase estimating method
E) WBS method
Correct Answer:
Verified
Q72: The preferred method for situations where the
Q73: The approach to estimating project time and
Q74: Consider a five-mile-long railroad tunnel. Tunnel experts
Q75: A project estimator is working on estimates
Q76: The top-down method of estimating project time
Q78: The bottom-up method of estimating where work
Q79: Project costs such as labor and materials
Q80: The top-down method of estimating when the
Q81: Identify and briefly describe three out of
Q82: Identify the three major categories of project
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents