An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced.is called which of the following?
A) Frozen window
B) Backflush
C) Level schedule
D) Group Technology
E) Kanban
Correct Answer:
Verified
Q59: You have been called in as a
Q60: Which of the following is related to
Q61: Which of the following is not listed
Q62: Imagine comparing a manufacturing operation using regular
Q62: In implementing a lean production system, you
Q65: To develop a lean manufacturing system a
Q66: Which of the following is a lean
Q67: Which of the following is a lean
Q68: In implementing a lean production system you
Q71: In a lean production system, we expect
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents