In implementing a lean production system, you should work with suppliers to do which of the following?
A) Open facilities near your factory.
B) Focus workstation capacities.
C) Backflush.
D) Provide quality at the source.
E) Reduce lead times.
Correct Answer:
Verified
Q57: A philosophy in which similar parts are
Q58: In the textbook, Toyota's Tai-ichi Ohno identified
Q59: The philosophy of making workers personally responsible
Q60: There is less uncertainty in service task
Q61: In implementing a lean production system you
Q63: In setting up a kanban control system
Q64: Imagine comparing a manufacturing operation using regular
Q65: To develop a lean manufacturing system a
Q66: To implement a flow process in developing
Q67: Which of the following statements holds true
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents