Question 1
True/False
Although programmers perform the actual coding,IT managers usually assign systems analysts to work with them as part of a team.
Question 2
True/False
Agile projects use various iterative and incremental models.
Question 3
True/False
The skill set required to develop documentation usually is the same as that required to develop a system.
Question 4
True/False
After a systems analyst documents the system's requirements,he or she breaks the system down into subsystems and modules in a process called scaling.
Question 5
True/False
Commercial software packages must undergo unit and integration testing similar to that of in-house developed systems,although system testing usually is not performed.
Question 6
True/False
If modules are loosely coupled,one module is linked to internal logic contained in another module.
Question 7
True/False
Compiling a program using a CASE tool or a language compiler detects syntax errors,which are language grammar errors.
Question 8
True/False
Modules that are independent are tightly coupled.
Question 9
True/False
Using flowcharts,programmers can break large systems into subsystems that are easier to understand and code.
Question 10
True/False
Most webinars are web-based broadcasts that allow a user to download multimedia files to a PC or portable device.
Question 11
True/False
Phased operation is more expensive than full parallel operation because the analyst has to work with the entire system at any given time.
Question 12
True/False
Data conversion is easier when a new system replaces a manual system because all data can be entered manually,unless it must be scanned.
Question 13
True/False
To minimize the need to require information from two different systems,cyclical information systems usually are converted using the direct cutover method at the beginning of a quarter,calendar year,or fiscal year.