Five jobs are waiting for processing through two work centers. Their processing time (in minutes) at each work center is contained in the table below. Each job requires work center Sigma before work center Delta. According to Johnson's rule, what sequence of jobs will minimize the completion time for all jobs?
A) R-S-T-U-V
B) S-V-T-R-U
C) S-U-T-V-R
D) V-R-U-S-T
E) none of the above
Correct Answer:
Verified
Q61: Use of the shortest processing time sequencing
Q63: Which of the following dispatching rules is
Q64: Average completion time for a schedule sequence
Q67: Sequencing (or dispatching):
A) assigns dates to specific
Q69: Which of the following is an advantage
Q73: Five jobs are waiting to be processed.
Q74: Which critical ratio value implies that a
Q75: The most appropriate sequencing rule to use
Q79: Conventional MRP uses time buckets that do
Q101: A recent advance in short-term scheduling that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents