A schedule/control Gantt chart is a visual representation of progress on the shop-floor which shows _______ on a vertical axis,and _______ on the horizontal axis.
A) jobs in progress; time
B) jobs in progress; total costs
C) hours worked; jobs in progress
D) total costs; jobs in progress
E) actual output; actual input
Correct Answer:
Verified
Q55: Assigning jobs to work centres without regard
Q56: Finite loading,as compared to infinite loading,assumes that:
A)there
Q57: The purpose of a Gantt chart is
Q58: As a performance measure in scheduling,job flow
Q59: Monitoring and managing the work flow at
Q61: A scheduling rule used for sequencing jobs
Q62: For the jobs listed below,which processing sequence
Q63: What is the optimum job sequence for
Q64: Shift scheduling for services does not involve:
A)forecasting
Q65: The owner/operator of the local franchise of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents