A Mixed Cost

Question 73
Multiple Choice

A mixed cost: A) Requires the future outlay of cash and is relevant for future decision making. B) Does not change with changes in the volume of activity within the relevant range. C) Is directly traceable to a cost object. D) Contains a combination of fixed costs and variable costs. E) Has already been incurred and cannot be avoided so it is irrelevant for decision making.