Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. What happens to the cards in the Incoming Parts C box and at the work station?
A) The move card at their station goes in the Incoming Parts C box and the production card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to produce material.
B) The production card at the station is passed back to Work Center 2 as a signal to produce more material and the move card is left at Work Center 3 to signal that they are ready to accept materials when they are complete at Work Center 2.
C) The move card at their station goes in the box they will send downstream to Work Center 4 and the production card is placed at the Work Center 3 station while they are working on this batch of material.
D) The production card at their station goes in the Incoming Parts C box and the move card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to move material.
Correct Answer:
Verified
Q54: Two announcers are used to read names
Q55: Consider the adjacent work stations in this
Q56: Consider the adjacent work stations in this
Q57: Consider the adjacent work stations in this
Q58: The forecast for next month is 200
Q60: Consider the adjacent work stations in this
Q61: Describe the movements of parts and kanbans
Q62: Two modules are used to feed the
Q63: A manufacturer waits to produce until they
Q64: A(n)_ is a production control approach that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents