The _____ Is the Minimum Acceptable Rate of Return on an Investment. A)capitalization

Question 39
Multiple Choice

The _____ is the minimum acceptable rate of return on an investment. A)capitalization rate B)internal rate of return   C)discount rate D)required rate of return

Related questions
Q 40
Payback occurs when: A)the net cumulative benefits minus costs equal one.  B)the net cumulative benefits equal the net cumulative costs.  C)the net costs are lower than the cumulative benefits.  D)the cumulative benefits are double the cumulative costs.
Q 41
A project's internal rate of return can be determined by finding what discount rate results in an NPV of _____ for the project. A)zero B)one   C)a hundred percent D)fifty percent
Q 42
In a weighted scoring model, the sum of the weights of all the criteria must total _____ percent. A)10 B)50   C)100 D)150
logo
QuizPlus
  • About
  • How it work
  • Pricing
Links
  • Privacy Policy
  • Terms And Conditions
  • Refund Policy
Contact Us
  • info@quizplus.com
© 2020 QuizPlus. All Right Reserved