(Table: Trade-Off of Study Time and Leisure Time) Use Table

Question 73
Multiple Choice

(Table: Trade-off of Study Time and Leisure Time) Use Table: Trade-off of Study Time and Leisure Time. A student sleeps 8 hours per day and divides the remaining time between study and leisure time. The table shows the combinations of study and leisure time that can be produced in the 16 waking hours of each day. Suppose this student is studying 4 hours and spending 10 hours doing leisure activities. This point is: A) outside the production possibility frontier. B) inside the production possibility frontier. C) on the production possibility frontier. D) both efficient and feasible.