Question
Which of the following would be classified as an external failure cost on a quality cost report?

A)Quality training.
B)Systems development.
C)Repairs and replacements beyond the warranty period.
D)Quality engineering.
Use Space or
up arrow
down arrow
to flip the card.
Question
Internal failure costs result when a defective product is used within the company.
Question
Quality costs:

A)relate only to the manufacturing process.
B)should be focused on appraisal activities.
C)are minimized by having a team of well-trained quality control inspectors.
D)cut across departmental lines and often are not accumulated and reported to management.
Question
Which of the following would be classified as a prevention cost on a quality cost report?

A)Systems development.
B)Disposal of defective products.
C)Returns and allowances arising from quality problems.
D)Supervision of testing and inspection activities.
Question
Eade Company's quality cost report is to be based on the following data: <strong>Eade Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$54,000 B)$75,000 C)$80,000 D)$121,000 <div style=padding-top: 35px>

-What would be the total internal failure cost appearing on the quality cost report?

A)$54,000
B)$75,000
C)$80,000
D)$121,000
Question
Eade Company's quality cost report is to be based on the following data: <strong>Eade Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$70,000 B)$119,000 C)$110,000 D)$97,000 <div style=padding-top: 35px>

-What would be the total appraisal cost appearing on the quality cost report?

A)$70,000
B)$119,000
C)$110,000
D)$97,000
Question
Prevention costs and appraisal costs are incurred in an effort to keep poor quality of conformance from occurring.
Question
Greater internal failure costs as a result of appraisal activities generally result in less:

A)prevention costs.
B)appraisal costs.
C)external failure costs.
D)all of the above.
Question
Appraisal costs are incurred to identify defective products before they are shipped to customers.
Question
Ordinarily,managers are not aware of the magnitude of their quality costs because these costs cut across departmental lines and are not normally tracked and accumulated by the cost system.
Question
Which of the following would be classified as an appraisal cost on a quality cost report?

A)Liability arising from defective products.
B)Supervision of testing and inspection activities.
C)Technical support provided to suppliers.
D)Debugging software errors.
Question
Which of the following would be classified as an external failure cost on a quality cost report?

A)Net cost of scrap.
B)Product recalls.
C)Rework labor and overhead.
D)Downtime caused by quality problems.
Question
External failure costs result when a defective product is shipped to a customer.
Question
Which of the following would be classified as a prevention cost on a quality cost report?

A)Lost sales arising from a reputation for poor quality.
B)Final product testing and inspection.
C)Net cost of spoilage.
D)Quality data gathering,analysis,and reporting.
Question
Eade Company's quality cost report is to be based on the following data: <strong>Eade Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$45,000 B)$47,000 C)$51,000 D)$43,000 <div style=padding-top: 35px>

-What would be the total prevention cost appearing on the quality cost report?

A)$45,000
B)$47,000
C)$51,000
D)$43,000
Question
An example of an internal failure cost is:

A)maintenance.
B)inspection.
C)rework.
D)product recalls.
Question
An increase in appraisal costs will usually result in an increase in internal failure costs.
Question
Which of the following would be classified as an internal failure cost on a quality cost report?

A)Cost of field servicing and handling complaints.
B)Rework labor and overhead.
C)Supervision of testing and inspection activities.
D)Final product testing and inspection.
Question
Which of the following would be classified as an internal failure cost on a quality cost report?

A)Supplies used in testing and inspection.
B)Final product testing and inspection.
C)Net cost of scrap.
D)Depreciation of test equipment.
Question
Which of the following would be classified as an appraisal cost on a quality cost report?

A)Rework labor and overhead.
B)Lost sales arising from a reputation for poor quality.
C)Net cost of scrap.
D)Depreciation of test equipment.
Question
Eade Company's quality cost report is to be based on the following data: <strong>Eade Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$328,000 B)$54,000 C)$95,000 D)$175,000 <div style=padding-top: 35px>

-What would be the total external failure cost appearing on the quality cost report?

A)$328,000
B)$54,000
C)$95,000
D)$175,000
Question
Thais Company's quality cost report is to be based on the following data: <strong>Thais Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$247,000 B)$104,000 C)$147,000 D)$166,000 <div style=padding-top: 35px>

-What would be the total internal failure cost appearing on the quality cost report?

A)$247,000
B)$104,000
C)$147,000
D)$166,000
Question
Gadola Company's quality cost report is to be based on the following data: Gadola Company's quality cost report is to be based on the following data:   Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.<div style=padding-top: 35px> Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Question
Thais Company's quality cost report is to be based on the following data: <strong>Thais Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$155,000 B)$170,000 C)$99,000 D)$197,000 <div style=padding-top: 35px>

-What would be the total appraisal cost appearing on the quality cost report?

A)$155,000
B)$170,000
C)$99,000
D)$197,000
Question
Eacker Company's quality cost report is to be based on the following data: <strong>Eacker Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$156,000 B)$134,000 C)$143,000 D)$158,000 <div style=padding-top: 35px>

-What would be the total internal failure cost appearing on the quality cost report?

A)$156,000
B)$134,000
C)$143,000
D)$158,000
Question
Faas Company's quality cost report is to be based on the following data: <strong>Faas Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$118,000 B)$106,000 C)$108,000 D)$87,000 <div style=padding-top: 35px>

-What would be the total prevention cost appearing on the quality cost report?

A)$118,000
B)$106,000
C)$108,000
D)$87,000
Question
Faast Company's quality cost report is to be based on the following data: <strong>Faast Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$139,000 B)$69,000 C)$178,000 D)$148,000 <div style=padding-top: 35px>

-What would be the total prevention cost appearing on the quality cost report?

A)$139,000
B)$69,000
C)$178,000
D)$148,000
Question
Eacker Company's quality cost report is to be based on the following data: <strong>Eacker Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$185,000 B)$165,000 C)$196,000 D)$128,000 <div style=padding-top: 35px>

-What would be the total appraisal cost appearing on the quality cost report?

A)$185,000
B)$165,000
C)$196,000
D)$128,000
Question
Faast Company's quality cost report is to be based on the following data: <strong>Faast Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$286,000 B)$533,000 C)$75,000 D)$109,000 <div style=padding-top: 35px>

-What would be the total external failure cost appearing on the quality cost report?

A)$286,000
B)$533,000
C)$75,000
D)$109,000
Question
Faas Company's quality cost report is to be based on the following data: <strong>Faas Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$142,000 B)$550,000 C)$314,000 D)$114,000 <div style=padding-top: 35px>

-What would be the total external failure cost appearing on the quality cost report?

A)$142,000
B)$550,000
C)$314,000
D)$114,000
Question
Faast Company's quality cost report is to be based on the following data: <strong>Faast Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$247,000 B)$108,000 C)$121,000 D)$102,000 <div style=padding-top: 35px>

-What would be the total appraisal cost appearing on the quality cost report?

A)$247,000
B)$108,000
C)$121,000
D)$102,000
Question
Eacker Company's quality cost report is to be based on the following data: <strong>Eacker Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$277,000 B)$143,000 C)$119,000 D)$628,000 <div style=padding-top: 35px>

-What would be the total external failure cost appearing on the quality cost report?

A)$277,000
B)$143,000
C)$119,000
D)$628,000
Question
Faas Company's quality cost report is to be based on the following data: <strong>Faas Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$172,000 B)$160,000 C)$102,000 D)$117,000 <div style=padding-top: 35px>

-What would be the total internal failure cost appearing on the quality cost report?

A)$172,000
B)$160,000
C)$102,000
D)$117,000
Question
Eacker Company's quality cost report is to be based on the following data: <strong>Eacker Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$151,000 B)$155,000 C)$145,000 D)$103,000 <div style=padding-top: 35px>

-What would be the total prevention cost appearing on the quality cost report?

A)$151,000
B)$155,000
C)$145,000
D)$103,000
Question
Hartoon Company's quality cost report is to be based on the following data: Hartoon Company's quality cost report is to be based on the following data:    Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.<div style=padding-top: 35px> Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Question
Hartwell Company's quality cost report is to be based on the following data: Hartwell Company's quality cost report is to be based on the following data:    Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.<div style=padding-top: 35px> Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Question
Faast Company's quality cost report is to be based on the following data: <strong>Faast Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$211,000 B)$99,000 C)$102,000 D)$158,000 <div style=padding-top: 35px>

-What would be the total internal failure cost appearing on the quality cost report?

A)$211,000
B)$99,000
C)$102,000
D)$158,000
Question
Thais Company's quality cost report is to be based on the following data: <strong>Thais Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$98,000 B)$84,000 C)$113,000 D)$92,000 <div style=padding-top: 35px>

-What would be the total prevention cost appearing on the quality cost report?

A)$98,000
B)$84,000
C)$113,000
D)$92,000
Question
Faas Company's quality cost report is to be based on the following data: <strong>Faas Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$130,000 B)$148,000 C)$236,000 D)$117,000 <div style=padding-top: 35px>

-What would be the total appraisal cost appearing on the quality cost report?

A)$130,000
B)$148,000
C)$236,000
D)$117,000
Question
Thais Company's quality cost report is to be based on the following data: <strong>Thais Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$373,000 B)$100,000 C)$570,000 D)$126,000 <div style=padding-top: 35px>

-What would be the total external failure cost appearing on the quality cost report?

A)$373,000
B)$100,000
C)$570,000
D)$126,000
Question
Godunov Company's quality cost report is to be based on the following data: Godunov Company's quality cost report is to be based on the following data:     Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.<div style=padding-top: 35px> Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Question
Gadsen Company's quality cost report is to be based on the following data: Gadsen Company's quality cost report is to be based on the following data:   Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.<div style=padding-top: 35px> Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/42
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 16: Appendix B: Cost of Quality
1
Which of the following would be classified as an external failure cost on a quality cost report?

A)Quality training.
B)Systems development.
C)Repairs and replacements beyond the warranty period.
D)Quality engineering.
C
2
Internal failure costs result when a defective product is used within the company.
False
3
Quality costs:

A)relate only to the manufacturing process.
B)should be focused on appraisal activities.
C)are minimized by having a team of well-trained quality control inspectors.
D)cut across departmental lines and often are not accumulated and reported to management.
D
4
Which of the following would be classified as a prevention cost on a quality cost report?

A)Systems development.
B)Disposal of defective products.
C)Returns and allowances arising from quality problems.
D)Supervision of testing and inspection activities.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
5
Eade Company's quality cost report is to be based on the following data: <strong>Eade Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$54,000 B)$75,000 C)$80,000 D)$121,000

-What would be the total internal failure cost appearing on the quality cost report?

A)$54,000
B)$75,000
C)$80,000
D)$121,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
6
Eade Company's quality cost report is to be based on the following data: <strong>Eade Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$70,000 B)$119,000 C)$110,000 D)$97,000

-What would be the total appraisal cost appearing on the quality cost report?

A)$70,000
B)$119,000
C)$110,000
D)$97,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
7
Prevention costs and appraisal costs are incurred in an effort to keep poor quality of conformance from occurring.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
8
Greater internal failure costs as a result of appraisal activities generally result in less:

A)prevention costs.
B)appraisal costs.
C)external failure costs.
D)all of the above.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
9
Appraisal costs are incurred to identify defective products before they are shipped to customers.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
10
Ordinarily,managers are not aware of the magnitude of their quality costs because these costs cut across departmental lines and are not normally tracked and accumulated by the cost system.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following would be classified as an appraisal cost on a quality cost report?

A)Liability arising from defective products.
B)Supervision of testing and inspection activities.
C)Technical support provided to suppliers.
D)Debugging software errors.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following would be classified as an external failure cost on a quality cost report?

A)Net cost of scrap.
B)Product recalls.
C)Rework labor and overhead.
D)Downtime caused by quality problems.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
13
External failure costs result when a defective product is shipped to a customer.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following would be classified as a prevention cost on a quality cost report?

A)Lost sales arising from a reputation for poor quality.
B)Final product testing and inspection.
C)Net cost of spoilage.
D)Quality data gathering,analysis,and reporting.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
15
Eade Company's quality cost report is to be based on the following data: <strong>Eade Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$45,000 B)$47,000 C)$51,000 D)$43,000

-What would be the total prevention cost appearing on the quality cost report?

A)$45,000
B)$47,000
C)$51,000
D)$43,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
16
An example of an internal failure cost is:

A)maintenance.
B)inspection.
C)rework.
D)product recalls.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
17
An increase in appraisal costs will usually result in an increase in internal failure costs.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following would be classified as an internal failure cost on a quality cost report?

A)Cost of field servicing and handling complaints.
B)Rework labor and overhead.
C)Supervision of testing and inspection activities.
D)Final product testing and inspection.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following would be classified as an internal failure cost on a quality cost report?

A)Supplies used in testing and inspection.
B)Final product testing and inspection.
C)Net cost of scrap.
D)Depreciation of test equipment.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
20
Which of the following would be classified as an appraisal cost on a quality cost report?

A)Rework labor and overhead.
B)Lost sales arising from a reputation for poor quality.
C)Net cost of scrap.
D)Depreciation of test equipment.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
21
Eade Company's quality cost report is to be based on the following data: <strong>Eade Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$328,000 B)$54,000 C)$95,000 D)$175,000

-What would be the total external failure cost appearing on the quality cost report?

A)$328,000
B)$54,000
C)$95,000
D)$175,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
22
Thais Company's quality cost report is to be based on the following data: <strong>Thais Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$247,000 B)$104,000 C)$147,000 D)$166,000

-What would be the total internal failure cost appearing on the quality cost report?

A)$247,000
B)$104,000
C)$147,000
D)$166,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
23
Gadola Company's quality cost report is to be based on the following data: Gadola Company's quality cost report is to be based on the following data:   Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs. Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
24
Thais Company's quality cost report is to be based on the following data: <strong>Thais Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$155,000 B)$170,000 C)$99,000 D)$197,000

-What would be the total appraisal cost appearing on the quality cost report?

A)$155,000
B)$170,000
C)$99,000
D)$197,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
25
Eacker Company's quality cost report is to be based on the following data: <strong>Eacker Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$156,000 B)$134,000 C)$143,000 D)$158,000

-What would be the total internal failure cost appearing on the quality cost report?

A)$156,000
B)$134,000
C)$143,000
D)$158,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
26
Faas Company's quality cost report is to be based on the following data: <strong>Faas Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$118,000 B)$106,000 C)$108,000 D)$87,000

-What would be the total prevention cost appearing on the quality cost report?

A)$118,000
B)$106,000
C)$108,000
D)$87,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
27
Faast Company's quality cost report is to be based on the following data: <strong>Faast Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$139,000 B)$69,000 C)$178,000 D)$148,000

-What would be the total prevention cost appearing on the quality cost report?

A)$139,000
B)$69,000
C)$178,000
D)$148,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
28
Eacker Company's quality cost report is to be based on the following data: <strong>Eacker Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$185,000 B)$165,000 C)$196,000 D)$128,000

-What would be the total appraisal cost appearing on the quality cost report?

A)$185,000
B)$165,000
C)$196,000
D)$128,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
29
Faast Company's quality cost report is to be based on the following data: <strong>Faast Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$286,000 B)$533,000 C)$75,000 D)$109,000

-What would be the total external failure cost appearing on the quality cost report?

A)$286,000
B)$533,000
C)$75,000
D)$109,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
30
Faas Company's quality cost report is to be based on the following data: <strong>Faas Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$142,000 B)$550,000 C)$314,000 D)$114,000

-What would be the total external failure cost appearing on the quality cost report?

A)$142,000
B)$550,000
C)$314,000
D)$114,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
31
Faast Company's quality cost report is to be based on the following data: <strong>Faast Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$247,000 B)$108,000 C)$121,000 D)$102,000

-What would be the total appraisal cost appearing on the quality cost report?

A)$247,000
B)$108,000
C)$121,000
D)$102,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
32
Eacker Company's quality cost report is to be based on the following data: <strong>Eacker Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$277,000 B)$143,000 C)$119,000 D)$628,000

-What would be the total external failure cost appearing on the quality cost report?

A)$277,000
B)$143,000
C)$119,000
D)$628,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
33
Faas Company's quality cost report is to be based on the following data: <strong>Faas Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$172,000 B)$160,000 C)$102,000 D)$117,000

-What would be the total internal failure cost appearing on the quality cost report?

A)$172,000
B)$160,000
C)$102,000
D)$117,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
34
Eacker Company's quality cost report is to be based on the following data: <strong>Eacker Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$151,000 B)$155,000 C)$145,000 D)$103,000

-What would be the total prevention cost appearing on the quality cost report?

A)$151,000
B)$155,000
C)$145,000
D)$103,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
35
Hartoon Company's quality cost report is to be based on the following data: Hartoon Company's quality cost report is to be based on the following data:    Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs. Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
36
Hartwell Company's quality cost report is to be based on the following data: Hartwell Company's quality cost report is to be based on the following data:    Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs. Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
37
Faast Company's quality cost report is to be based on the following data: <strong>Faast Company's quality cost report is to be based on the following data:    -What would be the total internal failure cost appearing on the quality cost report?</strong> A)$211,000 B)$99,000 C)$102,000 D)$158,000

-What would be the total internal failure cost appearing on the quality cost report?

A)$211,000
B)$99,000
C)$102,000
D)$158,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
38
Thais Company's quality cost report is to be based on the following data: <strong>Thais Company's quality cost report is to be based on the following data:    -What would be the total prevention cost appearing on the quality cost report?</strong> A)$98,000 B)$84,000 C)$113,000 D)$92,000

-What would be the total prevention cost appearing on the quality cost report?

A)$98,000
B)$84,000
C)$113,000
D)$92,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
39
Faas Company's quality cost report is to be based on the following data: <strong>Faas Company's quality cost report is to be based on the following data:    -What would be the total appraisal cost appearing on the quality cost report?</strong> A)$130,000 B)$148,000 C)$236,000 D)$117,000

-What would be the total appraisal cost appearing on the quality cost report?

A)$130,000
B)$148,000
C)$236,000
D)$117,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
40
Thais Company's quality cost report is to be based on the following data: <strong>Thais Company's quality cost report is to be based on the following data:    -What would be the total external failure cost appearing on the quality cost report?</strong> A)$373,000 B)$100,000 C)$570,000 D)$126,000

-What would be the total external failure cost appearing on the quality cost report?

A)$373,000
B)$100,000
C)$570,000
D)$126,000
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
41
Godunov Company's quality cost report is to be based on the following data: Godunov Company's quality cost report is to be based on the following data:     Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs. Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
42
Gadsen Company's quality cost report is to be based on the following data: Gadsen Company's quality cost report is to be based on the following data:   Required: Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs. Required:
Prepare a Quality Cost Report in good form with separate sections for prevention costs,appraisal costs,internal failure costs,and external failure costs.
Unlock Deck
Unlock for access to all 42 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 42 flashcards in this deck.