The degree of success for a new system development project is affected by the adequacy of training given to employees.
Use Space or
up arrow
down arrow
to flip the card.
Question
The project leader uses a project accounting system to fulfill his or her project control responsibilities.
Question
The test data approach should not be designed to "break" the computer program.
Question
A project is a specific application that has been approved for development.
Question
Delays are routine during implementation because it is impossible to anticipate all potential problems during the systems design process.
Question
Selecting and training personnel is one of the implementation activities that are carried out based on the design plan.
Question
Typically 30 to 40 percent of total project time is spent in the analysis phase of the systems development life cycle.
Question
One training method that makes use of current technological advances is computer-assisted training.
Question
The task completion schedule,based on task time estimates,should be maintained without revision if at all possible.
Question
Purposely or inadvertently submitting unreasonably low time or cost estimates is known as lowballing.
Question
An important criterion used in selecting projects for development is the project's expected return on investment.
Question
The basic resource in any systems project is time.
Question
It is a good assumption that employees will learn to use a new system by themselves.
Question
Timely project cost data is useful,but not essential,to track the costs incurred to date on a project.
Question
Almost all project accounting systems are automated.
Question
A weekly cost report that is available three weeks after the report date is still an effective tool for overall project control purposes.
Question
New computer equipment generally does not require special provisions for complex wiring schemes.
Question
The cutoff point is the point at which individual segments of the new system are phased in according to a specific time schedule.
Question
Time estimate standards developed in-house generally are less effective than standards or estimates available in current project management literature.
Question
One powerful means of testing computer programs involves processing test data.
Question
If data are input into the project accounting system that is both accurate and timely,it can produce revised cost estimates that are both accurate and timely.
Question
Within the project development environment the software application framework provides a structured environment in which to develop software.
Question
The amount of testing of a system by an auditor is directly proportional to the degree to which adequate internal controls exist and are operating effectively.
Question
The BPEL service engine needs a roadmap which is a set of visual diagrams based on the Unified Modeling Language and/or Business Process Modeling Notation.
Question
All modifications to a system's software and data schema should be formally reviewed and approved.
Question
Programmers making changes to system software should use the operational copy of the software to test the changes in a "real world environment."
Question
The SPICE approach categorizes processes into five broad areas and scores "capability level" on a 10-point scale.
Question
A software versioning system keeps only the current version of software source code available so version control issues are minimized.
Question
Within the project development environment the project collaboration platform serves to optimize management of the implementation of a systems development life cycle.
Question
From a control point of view,virtually all factors that relate to information systems are measured in terms of dollars.
Question
In service-oriented architecture (SOA),an important part of the application development framework is the business process execution language (BPEL)service engine.
Question
The appropriate level of detail to be obtained from a project accounting system is generally decided by the chief information officer.
Question
The ratio of actual CPU time used to CPU time available is one measure of system utilization.
Question
A Web application framework that has received considerable attention is Ruby on Rails.
Question
Audits of information systems often focus on internal control.
Question
The level of detail produced in a project accounting system is proportionate to the overhead cost of running the system.
Question
Two major software versioning systems are Subversion (SVN)and Current Version System (CVS).
Question
ISO 15504 (SPICE)is a process-based development approach that focuses on the "maturity" of the process being developed.
Question
A project development environment refers to the tools and technologies used to implement a given project.
Question
The integrated development environment is a software platform for diagrams and models.
Question
In the design and implementation of a system,it is almost always necessary to do additional work during the ________ phase.
Question
The development of computer software without ________ is an almost worthless exercise.
Question
To determine the activities that are critical to keeping a project on schedule,________ ________ must be obtained for each individual activity of the project.
Question
Regarding project costs,project resources tend to be spent at a(n)________ rate as a project proceeds toward completion.
Question
A major problem with a system that is down too much is ________ ________ for the company.
Question
Any successful systems implementation requires that considerable attention be given to employee ________.
Question
A project accounting system operates much like a conventional ________ accounting system.
Question
A major drawback of the ________ ________ process is that it can involve a greatly extended check-out period.
Question
________ is a successive refinement to the project plan.
Question
Many experts believe that eventually,in the future,all end-user software will run in ________ browsers.
Question
________ is necessary to ensure that the new system operates as planned.
Question
The BPEL service engine needs a roadmap which is a set of ________ diagrams based on Unified Modeling Language and/or Business Process Modeling Notation.
Question
________ ________ Environment refers to the tools and technologies used to implement a given project.
Question
An expensive,time-consuming problem in systems implementation is ________ ________.
Question
A(n)________ chart is an ideal way to factor a project into phases and tasks and to document such a plan.
Question
Good testing should do everything possible to ________ computer programs before they are implemented.
Question
The Project ________ Platform serves to optimize management of the communication chain.
Question
An announcement by management regarding project execution will have the benefit of minimizing ________.
Question
________ ________ should be submitted to the steering committee in writing.
Question
The ________ ________ Framework provides a structured environment in which to develop software.
Question
The execution of the systems implementation should begin with

A) conversion.
B) a formal announcement to employees.
C) employee training.
D) programming.
Question
The document that shows the order in which activities may be performed and may be expanded to include estimated times for each individual activity is the

A) Gantt chart.
B) network diagram.
C) PERT diagram.
D) CPM diagram.
Question
Perhaps the most important step regarding the success of a systems development project is

A) employee training.
B) conversion.
C) detailed system design.
D) operational training.
Question
The first major step in systems implementation is

A) review the systems design.
B) establish plans and controls.
C) evaluate the new system.
D) execute activities.
Question
When implementing a new system,management often has to decide whether to train existing employees or hire new employees.Many times it is best to retain and retrain current employees because

A) current employees are already familiar with the firm's operations.
B) overall employee morale is enhanced.
C) current employees are already familiar with the firm's operations and overall employee morale is enhanced.
D) None of these answers is correct.
Question
Which of the following groups of individuals should be on the special project team that executes the implementation of the design plan?

A) Systems technical personnel
B) Accountants and auditors
C) Individuals who also participated in the design
D) Design team members and affected managers
Question
Which of the following can serve as both a training tool for new employees and a help for future computer programming?

A) Testing
B) Evaluation
C) Systems analysis
D) Documentation
Question
________ ________ Environment is a software platform for actually writing program code which provides specialized tools for testing and debugging programs and deploying them to servers for testing or release.
Question
Which of the following activities occurs during the detailed systems design phase?

A) Computer programming
B) File conversion
C) Documentation
D) Evaluation
Question
The process of changing input data into a format readable by the new system hardware is called

A) testing.
B) file conversion.
C) evaluation.
D) documentation.
Question
The design specifications for a computer program are determined by

A) top management.
B) users.
C) the design team.
D) the computer programmer.
Question
A list of activities that is strategic to the project to keep it on schedule is called

A) the critical path.
B) a PERT diagram.
C) a Gantt chart.
D) the manager's priority matrix.
Question
The testing approach in which the old system is abandoned and the processing is switched to the new system is called

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
Question
The second major step in systems implementation is

A) review the systems design.
B) establish plans and controls.
C) execute activities.
D) evaluate the new system.
Question
What standard should be used to evaluate the quality of documentation produced by a programmer?

A) The number of pages produced
B) The number of logical flow diagrams and analytic flowcharts produced
C) The amount of time spent to produce the documentation
D) Whether a different programmer can use the documentation at a later date to modify the program
Question
One of the most important parts of systems implementation that is often overlooked or minimized is

A) testing.
B) documentation.
C) data conversion.
D) evaluation.
Question
The testing approach in which the new system is phased in a segment at a time is

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
Question
The most expensive approach to final systems testing is

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
Question
To provide the proper environment for computer equipment operations,the company must control

A) security.
B) wiring.
C) access.
D) temperature and humidity.
Question
Good project management uses plans for implementing a system.The plans should provide

A) specific budget information.
B) a breakdown of the project into various phases.
C) specific timetables for completion.
D) All of these answers are correct.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/133
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: Systems Project Management, implementation, operation, control
1
The degree of success for a new system development project is affected by the adequacy of training given to employees.
True
2
The project leader uses a project accounting system to fulfill his or her project control responsibilities.
True
3
The test data approach should not be designed to "break" the computer program.
False
4
A project is a specific application that has been approved for development.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
5
Delays are routine during implementation because it is impossible to anticipate all potential problems during the systems design process.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
6
Selecting and training personnel is one of the implementation activities that are carried out based on the design plan.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
7
Typically 30 to 40 percent of total project time is spent in the analysis phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
8
One training method that makes use of current technological advances is computer-assisted training.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
9
The task completion schedule,based on task time estimates,should be maintained without revision if at all possible.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
10
Purposely or inadvertently submitting unreasonably low time or cost estimates is known as lowballing.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
11
An important criterion used in selecting projects for development is the project's expected return on investment.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
12
The basic resource in any systems project is time.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
13
It is a good assumption that employees will learn to use a new system by themselves.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
14
Timely project cost data is useful,but not essential,to track the costs incurred to date on a project.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
15
Almost all project accounting systems are automated.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
16
A weekly cost report that is available three weeks after the report date is still an effective tool for overall project control purposes.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
17
New computer equipment generally does not require special provisions for complex wiring schemes.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
18
The cutoff point is the point at which individual segments of the new system are phased in according to a specific time schedule.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
19
Time estimate standards developed in-house generally are less effective than standards or estimates available in current project management literature.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
20
One powerful means of testing computer programs involves processing test data.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
21
If data are input into the project accounting system that is both accurate and timely,it can produce revised cost estimates that are both accurate and timely.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
22
Within the project development environment the software application framework provides a structured environment in which to develop software.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
23
The amount of testing of a system by an auditor is directly proportional to the degree to which adequate internal controls exist and are operating effectively.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
24
The BPEL service engine needs a roadmap which is a set of visual diagrams based on the Unified Modeling Language and/or Business Process Modeling Notation.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
25
All modifications to a system's software and data schema should be formally reviewed and approved.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
26
Programmers making changes to system software should use the operational copy of the software to test the changes in a "real world environment."
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
27
The SPICE approach categorizes processes into five broad areas and scores "capability level" on a 10-point scale.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
28
A software versioning system keeps only the current version of software source code available so version control issues are minimized.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
29
Within the project development environment the project collaboration platform serves to optimize management of the implementation of a systems development life cycle.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
30
From a control point of view,virtually all factors that relate to information systems are measured in terms of dollars.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
31
In service-oriented architecture (SOA),an important part of the application development framework is the business process execution language (BPEL)service engine.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
32
The appropriate level of detail to be obtained from a project accounting system is generally decided by the chief information officer.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
33
The ratio of actual CPU time used to CPU time available is one measure of system utilization.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
34
A Web application framework that has received considerable attention is Ruby on Rails.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
35
Audits of information systems often focus on internal control.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
36
The level of detail produced in a project accounting system is proportionate to the overhead cost of running the system.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
37
Two major software versioning systems are Subversion (SVN)and Current Version System (CVS).
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
38
ISO 15504 (SPICE)is a process-based development approach that focuses on the "maturity" of the process being developed.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
39
A project development environment refers to the tools and technologies used to implement a given project.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
40
The integrated development environment is a software platform for diagrams and models.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
41
In the design and implementation of a system,it is almost always necessary to do additional work during the ________ phase.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
42
The development of computer software without ________ is an almost worthless exercise.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
43
To determine the activities that are critical to keeping a project on schedule,________ ________ must be obtained for each individual activity of the project.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
44
Regarding project costs,project resources tend to be spent at a(n)________ rate as a project proceeds toward completion.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
45
A major problem with a system that is down too much is ________ ________ for the company.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
46
Any successful systems implementation requires that considerable attention be given to employee ________.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
47
A project accounting system operates much like a conventional ________ accounting system.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
48
A major drawback of the ________ ________ process is that it can involve a greatly extended check-out period.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
49
________ is a successive refinement to the project plan.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
50
Many experts believe that eventually,in the future,all end-user software will run in ________ browsers.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
51
________ is necessary to ensure that the new system operates as planned.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
52
The BPEL service engine needs a roadmap which is a set of ________ diagrams based on Unified Modeling Language and/or Business Process Modeling Notation.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
53
________ ________ Environment refers to the tools and technologies used to implement a given project.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
54
An expensive,time-consuming problem in systems implementation is ________ ________.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
55
A(n)________ chart is an ideal way to factor a project into phases and tasks and to document such a plan.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
56
Good testing should do everything possible to ________ computer programs before they are implemented.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
57
The Project ________ Platform serves to optimize management of the communication chain.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
58
An announcement by management regarding project execution will have the benefit of minimizing ________.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
59
________ ________ should be submitted to the steering committee in writing.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
60
The ________ ________ Framework provides a structured environment in which to develop software.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
61
The execution of the systems implementation should begin with

A) conversion.
B) a formal announcement to employees.
C) employee training.
D) programming.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
62
The document that shows the order in which activities may be performed and may be expanded to include estimated times for each individual activity is the

A) Gantt chart.
B) network diagram.
C) PERT diagram.
D) CPM diagram.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
63
Perhaps the most important step regarding the success of a systems development project is

A) employee training.
B) conversion.
C) detailed system design.
D) operational training.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
64
The first major step in systems implementation is

A) review the systems design.
B) establish plans and controls.
C) evaluate the new system.
D) execute activities.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
65
When implementing a new system,management often has to decide whether to train existing employees or hire new employees.Many times it is best to retain and retrain current employees because

A) current employees are already familiar with the firm's operations.
B) overall employee morale is enhanced.
C) current employees are already familiar with the firm's operations and overall employee morale is enhanced.
D) None of these answers is correct.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
66
Which of the following groups of individuals should be on the special project team that executes the implementation of the design plan?

A) Systems technical personnel
B) Accountants and auditors
C) Individuals who also participated in the design
D) Design team members and affected managers
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
67
Which of the following can serve as both a training tool for new employees and a help for future computer programming?

A) Testing
B) Evaluation
C) Systems analysis
D) Documentation
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
68
________ ________ Environment is a software platform for actually writing program code which provides specialized tools for testing and debugging programs and deploying them to servers for testing or release.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following activities occurs during the detailed systems design phase?

A) Computer programming
B) File conversion
C) Documentation
D) Evaluation
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
70
The process of changing input data into a format readable by the new system hardware is called

A) testing.
B) file conversion.
C) evaluation.
D) documentation.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
71
The design specifications for a computer program are determined by

A) top management.
B) users.
C) the design team.
D) the computer programmer.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
72
A list of activities that is strategic to the project to keep it on schedule is called

A) the critical path.
B) a PERT diagram.
C) a Gantt chart.
D) the manager's priority matrix.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
73
The testing approach in which the old system is abandoned and the processing is switched to the new system is called

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
74
The second major step in systems implementation is

A) review the systems design.
B) establish plans and controls.
C) execute activities.
D) evaluate the new system.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
75
What standard should be used to evaluate the quality of documentation produced by a programmer?

A) The number of pages produced
B) The number of logical flow diagrams and analytic flowcharts produced
C) The amount of time spent to produce the documentation
D) Whether a different programmer can use the documentation at a later date to modify the program
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
76
One of the most important parts of systems implementation that is often overlooked or minimized is

A) testing.
B) documentation.
C) data conversion.
D) evaluation.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
77
The testing approach in which the new system is phased in a segment at a time is

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
78
The most expensive approach to final systems testing is

A) parallel operation.
B) modular conversion.
C) the direct approach.
D) the file conversion approach.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
79
To provide the proper environment for computer equipment operations,the company must control

A) security.
B) wiring.
C) access.
D) temperature and humidity.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
80
Good project management uses plans for implementing a system.The plans should provide

A) specific budget information.
B) a breakdown of the project into various phases.
C) specific timetables for completion.
D) All of these answers are correct.
Unlock Deck
Unlock for access to all 133 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 133 flashcards in this deck.