Question
Identify the report below that does not have a pre-specified content and format design.

A) demand reports
B) scheduled reports
C) special-purpose analysis reports
D) triggered exception reports
Use Space or
up arrow
down arrow
to flip the card.
Question
The ________ is responsible for evaluating the design alternatives and selecting the one that best meets the organization's needs.

A) design team
B) implementation committee
C) steering committee
D) systems analysts
Question
Which consideration below is not considered important to output design?

A) format
B) location
C) medium
D) source
Question
What are the purposes of a conceptual systems design report?
Question
Which of the following is not a reason for preparing the conceptual systems design report?

A) It can be used to guide physical systems design activities.
B) It communicates how management and user information needs will be met.
C) It discusses the design alternatives that were not selected for the project.
D) It helps the steering committee assess system feasibility.
Question
The project committee for ALDI corporation just finished evaluating the design alternatives for a new,organization-wide accounting information system.and has selected a design.Now,the project committee needs to create conceptual design specifications for which of the following elements below?

A) output
B) data storage
C) processing and operations
D) all of the above
Question
Which element of design specification will help the project team find an efficient way to collect data for preparing sales reports?

A) data collection
B) input
C) output
D) processing procedures
Question
Which of the following lists represent the sequence of elements in developing the conceptual design specifications?

A) input, data storage, processing procedures and operations, and output
B) input, output, data storage, and processing procedures and operations
C) output, data storage, input, and processing procedures and operations
D) processing procedures and operations, input, data storage, and output
Question
What factors does a steering committee consider when evaluating different system designs?
Question
The project committee for ALDI corporation is attempting to evaluate design alternatives proposed for a new,organization-wide accounting information system.However,there is a great deal of debate regarding whether accessing data access should be random,sequential,or indexed.Which design consideration is most appropriately associated with these alternatives?

A) communication channels
B) data storage structure
C) file organization and access
D) input medium
Question
Describe the conceptual systems design phase and identify the elements of conceptual design specifications.
Question
In which phase of the SDLC does developing a general framework for implementing user requirements occur?

A) conceptual systems design
B) implementation and conversion
C) operations and maintenance
D) physical design
Question
How can accountants help in the systems development life cycle (SDLC)process?
Question
The project committee for ALDI corporation is attempting to evaluate design alternatives proposed for a new,organization-wide accounting information system.However,there is a great deal of debate regarding whether source documents,turnaround documents,or source data automation should be utilized in the new system.Which design consideration is most appropriately associated with these alternatives?

A) communication channels
B) data storage structure
C) file organization and access
D) input medium
Question
Deciding how often a certain report should be provided to users is part of which conceptual design specification element?

A) data storage
B) input
C) output
D) processing procedures and operations
Question
The project committee for ALDI corporation is attempting to evaluate design alternatives proposed for a new,organization-wide accounting information system.However,there is a great deal of debate regarding whether the system should be standardized on using tapes,disks,hard drives,or paper.Which design consideration is most appropriately associated with these alternatives?

A) communication channels
B) data storage structure
C) file organization and access
D) input medium
Question
The project committee for ALDI corporation is attempting to evaluate design alternatives proposed for a new,organization-wide accounting information system.However,there is a great deal of debate regarding whether the system should interface via telephone,internet,cable,or satellite.Which design consideration is most appropriately associated with these alternatives?

A) communication channels
B) data storage structure
C) file organization and access
D) input medium
Question
It is important that ________ for data storage purposes.

A) all data is in compatible format
B) there is easy access to the system
C) a printout of the data dictionary is available
D) copies of necessary reports are available
Question
Which of the below standards should not be used to evaluate design alternatives in the conceptual systems design stage of the SDLC?

A) how well a system meets organizational objectives
B) how well a system meets user needs
C) the economic feasibility of each alternative
D) the amount of time it required to formulate each alternative
Question
One of the purposes of the ________ is to guide physical systems design activities.

A) conceptual systems design report
B) physical systems design report
C) program design
D) systems analysis report
Question
Ghassan in Marketing received an e-mail from Asif at regional headquarters."Ghassan,I just reviewed the annual sales report for your district.You blew your sales goal away again,you top gun!" What type of report did Asif use?

A) scheduled report
B) special-purpose analysis report
C) triggered exception report
D) demand report
Question
Yasin,a professional in information technology services,received an e-mail from Adil in the Sales Department.The e-mail read: "Yasin,I need you to run that inventory report you prepared for me last month again.Please send it to me by e-mail.Thank you,Adil." What type of report is Adil asking Yasin to provide?

A) scheduled report
B) special-purpose analysis report
C) triggered exception report
D) demand report
Question
Physical input design considerations include

A) which transactions to enter.
B) layout of source documents.
C) types of data input and optimal input methods.
D) cost of collecting and storing data.
Question
What is used as the basis for management to make a "go/no go" decision regarding whether to proceed from the physical design phase to the implementation and conversion phase of the systems development life cycle?

A) conceptual system design report
B) physical systems design report
C) systems design report
D) implementation planning design report
Question
Which of the following statements is true?

A) Structured programming divides programs into well-defined segments to reduce complexity.
B) Structured programming is used to debug logic errors in programs.
C) Structured programming is accomplished by using a flowchart to guide design.
D) Structured programming pieces together standard code strings into a completed program.
Question
Flowcharts,record layouts,and decision tables are all often part of

A) determining user needs.
B) documenting the program.
C) testing the program.
D) training program users.
Question
Which of the following statements below is correct about modules of computer code created during program design?

A) Modules interact with each other directly and also through the control module.
B) Modules interact with each other directly.
C) Modules interact with only the control module.
D) Modules primarily, but not always, interact with the control module.
Question
Subdividing program code into small,well-defined modules is

A) called debugging.
B) known as structured programming.
C) part of program maintenance.
D) done during testing.
Question
The first step in program design is to

A) determine user needs.
B) develop a plan.
C) hire program users.
D) write program instructions.
Question
Which of the following controls design considerations will help ensure that all customer inquiries are answered in real-time?

A) security
B) authorization
C) accuracy
D) audit trail
Question
Which of the following is a consideration during file and database design?

A) form size
B) format
C) medium
D) organization
Question
Describe at least four considerations during controls design.
Question
Identify the question that is not an important consideration in procedures and controls design.

A) Are customer data stored in alphabetical order in a master file?
B) Are payments made only to legitimate vendors?
C) Are data processed and stored accurately?
D) Can the system be modified without affecting system availability?
Question
Which of the following control considerations will help ensure that all cash disbursements are made only to legitimate vendors?

A) security
B) accuracy
C) authorization
D) validity
Question
What of the below is the most time-consuming activity in the physical design stage of the systems development life cycle (SDLC)?

A) controls design
B) input design
C) output design
D) program design
Question
Yasin,a professional in information technology services,sent an e-mail to Mauqwa in the Purchasing department.The e-mail read "Mauqwa,the system just generated a stock-out report.I just wanted to give you a heads up.I'm sending it right over.Best regards,Yasin" What type of report is Yasin providing to Mauqwa?

A) scheduled report
B) special-purpose analysis report
C) triggered exception report
D) demand report
Question
At what point in the systems development life cycle does the company determine how the conceptual AIS design is to be implemented?

A) the conceptual design phase
B) the implementation and conversion phase
C) the physical design phase
D) the systems analysis phase
Question
________ is a process used to uncover and eliminate program errors.

A) Black box testing
B) Debugging
C) Desk checking
D) White box testing
Question
Yasin,a professional in information technology services,received an e-mail from Sabri in the Sales department.The e-mail read: "Yasin,I need you to do something for me.Query sales data for the second quarter and pull out all of the invoices that include iPhones selling with a discount.I need a count and the total amount of the discount.Thanks,Sabri." What type of report is Sabri asking Yasin to prepare?

A) scheduled report
B) special-purpose analysis report
C) triggered exception report
D) demand report
Question
Program design

A) spans all five stages of the system development life cycle.
B) includes writing computer code.
C) includes debugging logic errors.
D) is described by all the above.
Question
Describe structured programming.
Question
The project development committee for Photomat Incorporated is discussing output design alternatives for a new,organization-wide accounting information system.There is a heated debate among the team regarding which departments should be given the quarterly sales report.Mark prefers that only management and accounting receive the report,while Jan prefers that management,accounting,and the sales departments receive the report.What output design consideration is the team debating?

A) Use
B) Medium
C) Format
D) Location
Question
The project development committee for Photomat Incorporated is discussing output design alternatives for a new,organization-wide accounting information system.The project development committee has decided that all reports will be printed on paper.However,there is disagreement regarding where the reports should be made available.John wants the sales reports to be printed and stored in the accounting department for greatest security.Monica wants the sales reports to be printed in every department for full disclosure.What output design consideration are John and Monica discussing?

A) Use
B) Medium
C) Format
D) Location
Question
The project development committee for Photomat Incorporated is discussing output design alternatives for a new,organization-wide accounting information system.There is a heated debate among the team regarding whether the quarterly sales report be printed on paper,be viewable only on-screen,or be distributed as an e-mail.Mark prefers the report be printed on paper,while Jan prefers the report be distributed via e-mail to save trees.What output design consideration is the team debating?

A) Use
B) Medium
C) Format
D) Location
Question
What is the objective of output design? What are the output design considerations? What are the various categories of outputs?
Question
Within the implementation planning and conversion phase of the systems development life cycle,analysts must ________ before they can ________.

A) complete documentation; test software programs
B) install and test software; test software programs
C) test software programs; test the system
D) test the system; select and train personnel
Question
Effective AIS training involves

A) instruction on new hardware and software.
B) orientation to new policies and operations.
C) planning and scheduling so it occurs before system testing and conversion.
D) All of the above are correct.
Question
Step-by-step reviews of procedures or program logic early in the system design that focus on inputs,files,outputs,and data flows are called

A) acceptance tests.
B) operating tests.
C) processing of test transactions.
D) walk-throughs.
Question
Describe the eight basic steps in program design.
Question
________ is the process of installing hardware and software and getting the AIS up and running.

A) Conceptual design
B) Physical design
C) Systems analysis
D) Systems implementation
Question
What output design considerations should be analyzed as part of the physical system design phase?
Question
It is more efficient to enter data on paper,then enter the data into the system compared to requiring users to enter data directly into the system without using a paper source document.
Question
The project development committee for Photomat Incorporated is discussing output design alternatives for a new,organization-wide accounting information system.There is disagreement among the team regarding whether the quarterly sales numbers be disclosed in a narrative,displayed as a table,or appear in a bar chart.What output design consideration is the team discussing?

A) Use
B) Medium
C) Format
D) Location
Question
If developers took the time to find and correct every program flaw,they would risk not getting the system completed on time.
Question
Identify a control commonly used by organizations during the output design phase of the physical systems design stage of developing a new system to avoid expensive time delays later in the SDLC process.

A) requiring management to test the system before proceeding
B) requiring programmers to alert the project team when they are exceeding their allocated time budgets
C) requiring the development team to take time-off so that they do not become fatigued
D) requiring users to sign a document stating the output form and content are acceptable
Question
The ________ is responsible for identifying such risk factors in an implementation plan.

A) implementation team
B) steering committee
C) systems analysis team
D) systems development team
Question
Identify the element below that is not an objective of the output design phase of the physical systems design stage of the SDLC.

A) determining the nature of reports
B) determining the timing of reports
C) determining the content of reports
D) determining the cost of reports
Question
Write one question that should be asked about each of the controls design considerations.
Question
Approximately what portion of software development costs should be allocated to testing,debugging,and rewriting software?

A) None. It is important to put controls in place so that development occurs without errors that require correcting.
B) between 5% and 15%
C) between 20% and 30%
D) at least 35%, but no more than 50%
Question
Although most systems are moving away from using paper documents,form design is still an important consideration in system development.
Question
Describe the different methods of testing a system.
Question
Several types of documentation must be prepared for a new system.The type of documentation that includes the files and databases accessed and file retention requirements is called

A) development documentation.
B) operations documentation.
C) reference documentation.
D) user documentation.
Question
Processing test data involves

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
Question
What is systems implementation? How do you plan for it?
Question
What type of conversion terminates the old system as soon as the new system is ready?

A) direct conversion
B) parallel conversion
C) phase-in conversion
D) pilot conversion
Question
________ is a system test that determines whether a program is operating as designed.

A) An acceptance test
B) A debugging test
C) A test data processing
D) A walk-through
Question
Walk-throughs are system tests that involve

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
Question
Acceptance tests involve

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
Question
Which of the following is the least costly and most risky method of converting from one system to another?

A) direct
B) parallel
C) pilot
D) phase-in
Question
Which of the following activities is not part of data conversion?

A) changing data content
B) moving file servers
C) changing file formats
D) moving files to a new storage medium
Question
Which of the following is the most costly and least risky method of converting from one system to another?

A) direct
B) parallel
C) pilot
D) phase-in
Question
Which of the following is not one of the types of documentation that should be prepared for a new system?

A) management
B) operations
C) user
D) development
Question
Implementing a new system at a branch location before company-wide adoption is called

A) direct conversion.
B) parallel conversion.
C) phase-in conversion.
D) pilot conversion.
Question
Describe the approaches to system conversion.
Question
Which of the following describes a phase-in conversion?

A) Both the old and new AIS are operated simultaneously.
B) Elements of the old AIS are replaced gradually with elements of the new AIS.
C) The new AIS is introduced into a segment, rather than the whole organization.
D) The old AIS is terminated as the new AIS is introduced.
Question
A(n)________ system test uses copies of real transaction and file records.

A) acceptance test
B) debugging test
C) test data processing
D) walk-through
Question
In a ________,the old and the new systems are operated simultaneously for a period of time.

A) direct conversion
B) parallel conversion
C) phase-in conversion
D) pilot conversion
Question
Which of the following is the final step in the data conversion process?

A) data conversion
B) testing the system
C) documentation of conversion activities
D) monitoring of the system after data conversion
Question
Describe the different types of documentation that should be prepared for a new system.
Question
Which of the following is not one of the ways data may need to be modified during data conversion?

A) resolve data inconsistencies
B) validate new files
C) identify files to be converted
D) remove unnecessary fields from data files
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/92
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 22: Systems Design, implementation, and Operation
1
Identify the report below that does not have a pre-specified content and format design.

A) demand reports
B) scheduled reports
C) special-purpose analysis reports
D) triggered exception reports
C
2
The ________ is responsible for evaluating the design alternatives and selecting the one that best meets the organization's needs.

A) design team
B) implementation committee
C) steering committee
D) systems analysts
C
3
Which consideration below is not considered important to output design?

A) format
B) location
C) medium
D) source
D
4
What are the purposes of a conceptual systems design report?
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following is not a reason for preparing the conceptual systems design report?

A) It can be used to guide physical systems design activities.
B) It communicates how management and user information needs will be met.
C) It discusses the design alternatives that were not selected for the project.
D) It helps the steering committee assess system feasibility.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
6
The project committee for ALDI corporation just finished evaluating the design alternatives for a new,organization-wide accounting information system.and has selected a design.Now,the project committee needs to create conceptual design specifications for which of the following elements below?

A) output
B) data storage
C) processing and operations
D) all of the above
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
7
Which element of design specification will help the project team find an efficient way to collect data for preparing sales reports?

A) data collection
B) input
C) output
D) processing procedures
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following lists represent the sequence of elements in developing the conceptual design specifications?

A) input, data storage, processing procedures and operations, and output
B) input, output, data storage, and processing procedures and operations
C) output, data storage, input, and processing procedures and operations
D) processing procedures and operations, input, data storage, and output
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
9
What factors does a steering committee consider when evaluating different system designs?
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
10
The project committee for ALDI corporation is attempting to evaluate design alternatives proposed for a new,organization-wide accounting information system.However,there is a great deal of debate regarding whether accessing data access should be random,sequential,or indexed.Which design consideration is most appropriately associated with these alternatives?

A) communication channels
B) data storage structure
C) file organization and access
D) input medium
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
11
Describe the conceptual systems design phase and identify the elements of conceptual design specifications.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
12
In which phase of the SDLC does developing a general framework for implementing user requirements occur?

A) conceptual systems design
B) implementation and conversion
C) operations and maintenance
D) physical design
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
13
How can accountants help in the systems development life cycle (SDLC)process?
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
14
The project committee for ALDI corporation is attempting to evaluate design alternatives proposed for a new,organization-wide accounting information system.However,there is a great deal of debate regarding whether source documents,turnaround documents,or source data automation should be utilized in the new system.Which design consideration is most appropriately associated with these alternatives?

A) communication channels
B) data storage structure
C) file organization and access
D) input medium
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
15
Deciding how often a certain report should be provided to users is part of which conceptual design specification element?

A) data storage
B) input
C) output
D) processing procedures and operations
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
16
The project committee for ALDI corporation is attempting to evaluate design alternatives proposed for a new,organization-wide accounting information system.However,there is a great deal of debate regarding whether the system should be standardized on using tapes,disks,hard drives,or paper.Which design consideration is most appropriately associated with these alternatives?

A) communication channels
B) data storage structure
C) file organization and access
D) input medium
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
17
The project committee for ALDI corporation is attempting to evaluate design alternatives proposed for a new,organization-wide accounting information system.However,there is a great deal of debate regarding whether the system should interface via telephone,internet,cable,or satellite.Which design consideration is most appropriately associated with these alternatives?

A) communication channels
B) data storage structure
C) file organization and access
D) input medium
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
18
It is important that ________ for data storage purposes.

A) all data is in compatible format
B) there is easy access to the system
C) a printout of the data dictionary is available
D) copies of necessary reports are available
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the below standards should not be used to evaluate design alternatives in the conceptual systems design stage of the SDLC?

A) how well a system meets organizational objectives
B) how well a system meets user needs
C) the economic feasibility of each alternative
D) the amount of time it required to formulate each alternative
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
20
One of the purposes of the ________ is to guide physical systems design activities.

A) conceptual systems design report
B) physical systems design report
C) program design
D) systems analysis report
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
21
Ghassan in Marketing received an e-mail from Asif at regional headquarters."Ghassan,I just reviewed the annual sales report for your district.You blew your sales goal away again,you top gun!" What type of report did Asif use?

A) scheduled report
B) special-purpose analysis report
C) triggered exception report
D) demand report
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
22
Yasin,a professional in information technology services,received an e-mail from Adil in the Sales Department.The e-mail read: "Yasin,I need you to run that inventory report you prepared for me last month again.Please send it to me by e-mail.Thank you,Adil." What type of report is Adil asking Yasin to provide?

A) scheduled report
B) special-purpose analysis report
C) triggered exception report
D) demand report
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
23
Physical input design considerations include

A) which transactions to enter.
B) layout of source documents.
C) types of data input and optimal input methods.
D) cost of collecting and storing data.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
24
What is used as the basis for management to make a "go/no go" decision regarding whether to proceed from the physical design phase to the implementation and conversion phase of the systems development life cycle?

A) conceptual system design report
B) physical systems design report
C) systems design report
D) implementation planning design report
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following statements is true?

A) Structured programming divides programs into well-defined segments to reduce complexity.
B) Structured programming is used to debug logic errors in programs.
C) Structured programming is accomplished by using a flowchart to guide design.
D) Structured programming pieces together standard code strings into a completed program.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
26
Flowcharts,record layouts,and decision tables are all often part of

A) determining user needs.
B) documenting the program.
C) testing the program.
D) training program users.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following statements below is correct about modules of computer code created during program design?

A) Modules interact with each other directly and also through the control module.
B) Modules interact with each other directly.
C) Modules interact with only the control module.
D) Modules primarily, but not always, interact with the control module.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
28
Subdividing program code into small,well-defined modules is

A) called debugging.
B) known as structured programming.
C) part of program maintenance.
D) done during testing.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
29
The first step in program design is to

A) determine user needs.
B) develop a plan.
C) hire program users.
D) write program instructions.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following controls design considerations will help ensure that all customer inquiries are answered in real-time?

A) security
B) authorization
C) accuracy
D) audit trail
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is a consideration during file and database design?

A) form size
B) format
C) medium
D) organization
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
32
Describe at least four considerations during controls design.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
33
Identify the question that is not an important consideration in procedures and controls design.

A) Are customer data stored in alphabetical order in a master file?
B) Are payments made only to legitimate vendors?
C) Are data processed and stored accurately?
D) Can the system be modified without affecting system availability?
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
34
Which of the following control considerations will help ensure that all cash disbursements are made only to legitimate vendors?

A) security
B) accuracy
C) authorization
D) validity
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
35
What of the below is the most time-consuming activity in the physical design stage of the systems development life cycle (SDLC)?

A) controls design
B) input design
C) output design
D) program design
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
36
Yasin,a professional in information technology services,sent an e-mail to Mauqwa in the Purchasing department.The e-mail read "Mauqwa,the system just generated a stock-out report.I just wanted to give you a heads up.I'm sending it right over.Best regards,Yasin" What type of report is Yasin providing to Mauqwa?

A) scheduled report
B) special-purpose analysis report
C) triggered exception report
D) demand report
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
37
At what point in the systems development life cycle does the company determine how the conceptual AIS design is to be implemented?

A) the conceptual design phase
B) the implementation and conversion phase
C) the physical design phase
D) the systems analysis phase
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
38
________ is a process used to uncover and eliminate program errors.

A) Black box testing
B) Debugging
C) Desk checking
D) White box testing
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
39
Yasin,a professional in information technology services,received an e-mail from Sabri in the Sales department.The e-mail read: "Yasin,I need you to do something for me.Query sales data for the second quarter and pull out all of the invoices that include iPhones selling with a discount.I need a count and the total amount of the discount.Thanks,Sabri." What type of report is Sabri asking Yasin to prepare?

A) scheduled report
B) special-purpose analysis report
C) triggered exception report
D) demand report
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
40
Program design

A) spans all five stages of the system development life cycle.
B) includes writing computer code.
C) includes debugging logic errors.
D) is described by all the above.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
41
Describe structured programming.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
42
The project development committee for Photomat Incorporated is discussing output design alternatives for a new,organization-wide accounting information system.There is a heated debate among the team regarding which departments should be given the quarterly sales report.Mark prefers that only management and accounting receive the report,while Jan prefers that management,accounting,and the sales departments receive the report.What output design consideration is the team debating?

A) Use
B) Medium
C) Format
D) Location
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
43
The project development committee for Photomat Incorporated is discussing output design alternatives for a new,organization-wide accounting information system.The project development committee has decided that all reports will be printed on paper.However,there is disagreement regarding where the reports should be made available.John wants the sales reports to be printed and stored in the accounting department for greatest security.Monica wants the sales reports to be printed in every department for full disclosure.What output design consideration are John and Monica discussing?

A) Use
B) Medium
C) Format
D) Location
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
44
The project development committee for Photomat Incorporated is discussing output design alternatives for a new,organization-wide accounting information system.There is a heated debate among the team regarding whether the quarterly sales report be printed on paper,be viewable only on-screen,or be distributed as an e-mail.Mark prefers the report be printed on paper,while Jan prefers the report be distributed via e-mail to save trees.What output design consideration is the team debating?

A) Use
B) Medium
C) Format
D) Location
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
45
What is the objective of output design? What are the output design considerations? What are the various categories of outputs?
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
46
Within the implementation planning and conversion phase of the systems development life cycle,analysts must ________ before they can ________.

A) complete documentation; test software programs
B) install and test software; test software programs
C) test software programs; test the system
D) test the system; select and train personnel
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
47
Effective AIS training involves

A) instruction on new hardware and software.
B) orientation to new policies and operations.
C) planning and scheduling so it occurs before system testing and conversion.
D) All of the above are correct.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
48
Step-by-step reviews of procedures or program logic early in the system design that focus on inputs,files,outputs,and data flows are called

A) acceptance tests.
B) operating tests.
C) processing of test transactions.
D) walk-throughs.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
49
Describe the eight basic steps in program design.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
50
________ is the process of installing hardware and software and getting the AIS up and running.

A) Conceptual design
B) Physical design
C) Systems analysis
D) Systems implementation
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
51
What output design considerations should be analyzed as part of the physical system design phase?
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
52
It is more efficient to enter data on paper,then enter the data into the system compared to requiring users to enter data directly into the system without using a paper source document.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
53
The project development committee for Photomat Incorporated is discussing output design alternatives for a new,organization-wide accounting information system.There is disagreement among the team regarding whether the quarterly sales numbers be disclosed in a narrative,displayed as a table,or appear in a bar chart.What output design consideration is the team discussing?

A) Use
B) Medium
C) Format
D) Location
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
54
If developers took the time to find and correct every program flaw,they would risk not getting the system completed on time.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
55
Identify a control commonly used by organizations during the output design phase of the physical systems design stage of developing a new system to avoid expensive time delays later in the SDLC process.

A) requiring management to test the system before proceeding
B) requiring programmers to alert the project team when they are exceeding their allocated time budgets
C) requiring the development team to take time-off so that they do not become fatigued
D) requiring users to sign a document stating the output form and content are acceptable
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
56
The ________ is responsible for identifying such risk factors in an implementation plan.

A) implementation team
B) steering committee
C) systems analysis team
D) systems development team
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
57
Identify the element below that is not an objective of the output design phase of the physical systems design stage of the SDLC.

A) determining the nature of reports
B) determining the timing of reports
C) determining the content of reports
D) determining the cost of reports
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
58
Write one question that should be asked about each of the controls design considerations.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
59
Approximately what portion of software development costs should be allocated to testing,debugging,and rewriting software?

A) None. It is important to put controls in place so that development occurs without errors that require correcting.
B) between 5% and 15%
C) between 20% and 30%
D) at least 35%, but no more than 50%
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
60
Although most systems are moving away from using paper documents,form design is still an important consideration in system development.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
61
Describe the different methods of testing a system.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
62
Several types of documentation must be prepared for a new system.The type of documentation that includes the files and databases accessed and file retention requirements is called

A) development documentation.
B) operations documentation.
C) reference documentation.
D) user documentation.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
63
Processing test data involves

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
64
What is systems implementation? How do you plan for it?
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
65
What type of conversion terminates the old system as soon as the new system is ready?

A) direct conversion
B) parallel conversion
C) phase-in conversion
D) pilot conversion
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
66
________ is a system test that determines whether a program is operating as designed.

A) An acceptance test
B) A debugging test
C) A test data processing
D) A walk-through
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
67
Walk-throughs are system tests that involve

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
68
Acceptance tests involve

A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following is the least costly and most risky method of converting from one system to another?

A) direct
B) parallel
C) pilot
D) phase-in
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
70
Which of the following activities is not part of data conversion?

A) changing data content
B) moving file servers
C) changing file formats
D) moving files to a new storage medium
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
71
Which of the following is the most costly and least risky method of converting from one system to another?

A) direct
B) parallel
C) pilot
D) phase-in
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
72
Which of the following is not one of the types of documentation that should be prepared for a new system?

A) management
B) operations
C) user
D) development
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
73
Implementing a new system at a branch location before company-wide adoption is called

A) direct conversion.
B) parallel conversion.
C) phase-in conversion.
D) pilot conversion.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
74
Describe the approaches to system conversion.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
75
Which of the following describes a phase-in conversion?

A) Both the old and new AIS are operated simultaneously.
B) Elements of the old AIS are replaced gradually with elements of the new AIS.
C) The new AIS is introduced into a segment, rather than the whole organization.
D) The old AIS is terminated as the new AIS is introduced.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
76
A(n)________ system test uses copies of real transaction and file records.

A) acceptance test
B) debugging test
C) test data processing
D) walk-through
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
77
In a ________,the old and the new systems are operated simultaneously for a period of time.

A) direct conversion
B) parallel conversion
C) phase-in conversion
D) pilot conversion
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
78
Which of the following is the final step in the data conversion process?

A) data conversion
B) testing the system
C) documentation of conversion activities
D) monitoring of the system after data conversion
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
79
Describe the different types of documentation that should be prepared for a new system.
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
80
Which of the following is not one of the ways data may need to be modified during data conversion?

A) resolve data inconsistencies
B) validate new files
C) identify files to be converted
D) remove unnecessary fields from data files
Unlock Deck
Unlock for access to all 92 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 92 flashcards in this deck.