Scope management includes the processes to manage timely completion of the project.
Use Space or
up arrow
down arrow
to flip the card.
Question
Different project life cycle models are used for different types of projects.
Question
Some projects are considered successful if they reap business benefits like increased profitability,even if completed late or over budget.
Question
Project plans and goals usually become more specific as early work is completed.
Question
A project is a lasting endeavor undertaken to maintain a reliable product or service.
Question
Project customers can be either internal or external to the organization.
Question
Most projects are conducted with constraints on the amount of time and funding available to the project manager.
Question
Integration management represents the processes and activities to identify,define,combine,unify and coordinate the various processes and project management activities.
Question
A project is a temporary endeavor undertaken to create a unique product,service or result.
Question
Cost management processes are involved in planning,estimating,budgeting,m financing,funding,managing and controlling costs so that the project can be completed within the approved budget.
Question
The most critical measures of project success are completing the project on schedule and on budget.
Question
Communications management generally entails the processes that organize,manage,and lead the project team.
Question
Operations consist of the ongoing work needed to ensure the organization continues to function effectively.
Question
Generally,project life cycle stages are designed so that the amount of money spent in each of the stages is nearly equivalent.
Question
Stakeholder management is comprised of the processes to identify the people,groups,or organizations that could impact or be impacted by the project,analyze their expectations and impact,and developing strategies for engaging them and managing conflicting interests.
Question
An important factor used to determine the phases in a project life cycle are the control needs of the organization(s)involved in the project.
Question
In reality,many projects are fully successful in some ways,but less successful in others.
Question
Customers may need to sacrifice expectations related to cost or schedule in order to realize their expectations for scope or quality.
Question
The name and number of phases in a project life cycle are determined by the organization(s)involved in the project.
Question
All projects go through a common project life cycle that includes four stages: concept,development,production and close-out.
Question
When applied to project management,the human resource management knowledge area typically involves which of the following activities?

A) determining the work necessary for project completion
B) estimating,budgeting and controlling project costs
C) identifying,analyzing and controlling project risks
D) organizing,managing and leading the project team
Question
The project manager is normally directly accountable for the project results,schedule and budget.
Question
In an adaptive or change - driven project life cycle:

A) the product or deliverable is well understood.
B) planning precedes all executing.
C) early results lead into planning later work.
D) the waterfall approach is commonly used.
Question
Which of the following statements regarding project life cycles is most accurate?

A) All research and development organizations rely upon a four-stage project life cycle that includes initiating,planning,executing and closing.
B) The project life cycle is the same regardless of the type of projects managed by an organization.
C) Many different project life cycle models are used,for different types of projects.
D) All project life cycles are the same across every industry
Question
In the PMBOK,the five logical groupings of the project management inputs,tools and techniques,and outputs are called the:

A) project management knowledge areas
B) project management process groups
C) life cycle stages
D) phases and gates
Question
Which of the ten knowledge areas defined in the Project Management Body of Knowledge includes the processes required to ensure that the project includes all the work required,and only the work required,to complete the project successfully?

A) Project scope management
B) Project quality management
C) Project communications management
D) Project stakeholder management
Question
A project manager in agile projects who serves and leads in a collaborative,facilitation manner is called a:

A) program manager
B) scrum master
C) sponsor
D) functional manager
Question
In agile projects,the customer representative role is passive,and their involvement is typically limited to the early stages of the project.
Question
Which of the ten knowledge areas defined in the Project Management Body of Knowledge includes the activities of purchasing or acquiring products,services or results from outside the project team?

A) Scope management
B) Quality management
C) Communications management
D) Procurement management
Question
The project management office (PMO)is typically the person or group that provides the financial resources and support for the project,and is accountable for enabling success.
Question
Achieving project success is determined by all of the following EXCEPT:

A) creating deliverables that include all required features
B) involving only important key stakeholders
C) completing the project on schedule and on budget
D) providing outputs that please the project's customers
Question
Projects are considered successful for all of the reasons below EXCEPT:..

A) members of the team learn new skills working on the project.
B) the organization captures lessons learned for future projects.
C) the team has demonstrated heroics to meet project objectives
D) the organization reaps business level benefits.
Question
Projects often require tradeoffs among all of the following EXCEPT:

A) scope
B) cost
C) schedule
D) programs
Question
Once projects are completed,they will typically yield all of the following results EXCEPT:

A) a unique product,service or result
B) make or buy decisions
C) stakeholders whose interests are affected by the outcome
D) a primary deliverable along with supporting deliverables
Question
Project failure can result from all of the following causes EXCEPT:

A) support of senior management
B) changes in scope are not agreed upon by all parties involved.
C) too little time is allowed for project completion.
D) planning is not adequate.
Question
Which of the following examples is NOT a typical or appropriate situation to employ project management?

A) improving a soldering process in an assembly line
B) processing deposits and withdrawals in a bank
C) installing a new accounting application on to a server
D) developing a new medical device for use by clinics
Question
Which of the following examples is NOT a typical or appropriate situation to employ project management?

A) improving an existing work process
B) installing a new computer system
C) conducting a routine,standard customer service operation
D) developing a new product
Question
Which of the following actions will likely cause a project to fail?

A) dedicating valuable team member time to identify risk events
B) spending project funding to procure needed tools and spare parts
C) unclear or conflicting stakeholder expectations
D) conducting a project audit to evaluate performance
Question
All of the following factors have influenced the increased reliance upon project management in recent years EXCEPT:

A) rapid growth and changes in the information technology and telecommunications industries
B) realization that methods for large projects can be modified and used for small projects
C) increased international competition and its influence on consumer demands
D) the decreased demands of ongoing operational work
Question
Which of the following statements correctly describes project management?

A) Project management applies knowledge,skills,tools and techniques to project activities.
B) Project management should not involve tradeoffs between scope,schedule and cost.
C) Project management only relies upon checklists to plan and execute the work.
D) Project management's goal is to maintain efficiency of ongoing operations.
Question
The Project Management Body of Knowledge (PMBOK® Guide)published by the Project Management Institute identifies five process groups.Briefly identify and describe each of these five process groups.
Question
Contrast project management with operations management.How do these differences impact the approach required to manage a project successfully?
Question
From an agile project management perspective,which of these constraints are considered to be fixed?

A) Quality and value
B) Resources and schedule
C) Scope and time
D) Customer satisfaction
Question
Which of the following roles is typically associated with the project manager?

A) the person assigned by the performing organization to lead the team that is responsible for achieving the project objectives
B) the person with management authority over a unit within a functional organization
C) the person responsible for project methods,standards and training
D) the person responsible for providing the financial resources and support for the project and is accountable for enabling success.
Question
The leadership of top management is often cited as a factor that is critical to project success.Describe the key project related activities of the steering team,chief projects officer and sponsor.
Question
Typically,the senior customer representative is responsible for which of the following project roles?

A) develops the project schedule and budget
B) determines how the project work will be accomplished
C) ensures the needs of the customer's organization are identified and prioritized
D) helps the project manager with running meetings and providing status reports
Question
Typically,a steering team or leadership team is responsible for all of the following project related roles EXCEPT:

A) selecting,prioritizing and resourcing projects
B) providing rigid policies,procedures,standards and guidelines
C) ensuring accurate progress is reported and adjustments made
D) aligning projects with the organization's strategic plans
Question
Project managers frequently face competing constraints.Identify these common constraints and describe approaches that project managers can use to make the trade-offs required to succeed.
Question
Compare and contrast predictive,or plan-driven project life cycles with agile,or change-driven life cycles.When might each type of life cycle be appropriate?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/49
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: Introduction to Project Management
1
Scope management includes the processes to manage timely completion of the project.
False
2
Different project life cycle models are used for different types of projects.
True
3
Some projects are considered successful if they reap business benefits like increased profitability,even if completed late or over budget.
True
4
Project plans and goals usually become more specific as early work is completed.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
5
A project is a lasting endeavor undertaken to maintain a reliable product or service.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
6
Project customers can be either internal or external to the organization.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
7
Most projects are conducted with constraints on the amount of time and funding available to the project manager.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
8
Integration management represents the processes and activities to identify,define,combine,unify and coordinate the various processes and project management activities.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
9
A project is a temporary endeavor undertaken to create a unique product,service or result.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
10
Cost management processes are involved in planning,estimating,budgeting,m financing,funding,managing and controlling costs so that the project can be completed within the approved budget.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
11
The most critical measures of project success are completing the project on schedule and on budget.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
12
Communications management generally entails the processes that organize,manage,and lead the project team.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
13
Operations consist of the ongoing work needed to ensure the organization continues to function effectively.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
14
Generally,project life cycle stages are designed so that the amount of money spent in each of the stages is nearly equivalent.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
15
Stakeholder management is comprised of the processes to identify the people,groups,or organizations that could impact or be impacted by the project,analyze their expectations and impact,and developing strategies for engaging them and managing conflicting interests.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
16
An important factor used to determine the phases in a project life cycle are the control needs of the organization(s)involved in the project.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
17
In reality,many projects are fully successful in some ways,but less successful in others.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
18
Customers may need to sacrifice expectations related to cost or schedule in order to realize their expectations for scope or quality.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
19
The name and number of phases in a project life cycle are determined by the organization(s)involved in the project.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
20
All projects go through a common project life cycle that includes four stages: concept,development,production and close-out.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
21
When applied to project management,the human resource management knowledge area typically involves which of the following activities?

A) determining the work necessary for project completion
B) estimating,budgeting and controlling project costs
C) identifying,analyzing and controlling project risks
D) organizing,managing and leading the project team
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
22
The project manager is normally directly accountable for the project results,schedule and budget.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
23
In an adaptive or change - driven project life cycle:

A) the product or deliverable is well understood.
B) planning precedes all executing.
C) early results lead into planning later work.
D) the waterfall approach is commonly used.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following statements regarding project life cycles is most accurate?

A) All research and development organizations rely upon a four-stage project life cycle that includes initiating,planning,executing and closing.
B) The project life cycle is the same regardless of the type of projects managed by an organization.
C) Many different project life cycle models are used,for different types of projects.
D) All project life cycles are the same across every industry
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
25
In the PMBOK,the five logical groupings of the project management inputs,tools and techniques,and outputs are called the:

A) project management knowledge areas
B) project management process groups
C) life cycle stages
D) phases and gates
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the ten knowledge areas defined in the Project Management Body of Knowledge includes the processes required to ensure that the project includes all the work required,and only the work required,to complete the project successfully?

A) Project scope management
B) Project quality management
C) Project communications management
D) Project stakeholder management
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
27
A project manager in agile projects who serves and leads in a collaborative,facilitation manner is called a:

A) program manager
B) scrum master
C) sponsor
D) functional manager
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
28
In agile projects,the customer representative role is passive,and their involvement is typically limited to the early stages of the project.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the ten knowledge areas defined in the Project Management Body of Knowledge includes the activities of purchasing or acquiring products,services or results from outside the project team?

A) Scope management
B) Quality management
C) Communications management
D) Procurement management
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
30
The project management office (PMO)is typically the person or group that provides the financial resources and support for the project,and is accountable for enabling success.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
31
Achieving project success is determined by all of the following EXCEPT:

A) creating deliverables that include all required features
B) involving only important key stakeholders
C) completing the project on schedule and on budget
D) providing outputs that please the project's customers
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
32
Projects are considered successful for all of the reasons below EXCEPT:..

A) members of the team learn new skills working on the project.
B) the organization captures lessons learned for future projects.
C) the team has demonstrated heroics to meet project objectives
D) the organization reaps business level benefits.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
33
Projects often require tradeoffs among all of the following EXCEPT:

A) scope
B) cost
C) schedule
D) programs
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
34
Once projects are completed,they will typically yield all of the following results EXCEPT:

A) a unique product,service or result
B) make or buy decisions
C) stakeholders whose interests are affected by the outcome
D) a primary deliverable along with supporting deliverables
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
35
Project failure can result from all of the following causes EXCEPT:

A) support of senior management
B) changes in scope are not agreed upon by all parties involved.
C) too little time is allowed for project completion.
D) planning is not adequate.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following examples is NOT a typical or appropriate situation to employ project management?

A) improving a soldering process in an assembly line
B) processing deposits and withdrawals in a bank
C) installing a new accounting application on to a server
D) developing a new medical device for use by clinics
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following examples is NOT a typical or appropriate situation to employ project management?

A) improving an existing work process
B) installing a new computer system
C) conducting a routine,standard customer service operation
D) developing a new product
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following actions will likely cause a project to fail?

A) dedicating valuable team member time to identify risk events
B) spending project funding to procure needed tools and spare parts
C) unclear or conflicting stakeholder expectations
D) conducting a project audit to evaluate performance
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
39
All of the following factors have influenced the increased reliance upon project management in recent years EXCEPT:

A) rapid growth and changes in the information technology and telecommunications industries
B) realization that methods for large projects can be modified and used for small projects
C) increased international competition and its influence on consumer demands
D) the decreased demands of ongoing operational work
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
40
Which of the following statements correctly describes project management?

A) Project management applies knowledge,skills,tools and techniques to project activities.
B) Project management should not involve tradeoffs between scope,schedule and cost.
C) Project management only relies upon checklists to plan and execute the work.
D) Project management's goal is to maintain efficiency of ongoing operations.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
41
The Project Management Body of Knowledge (PMBOK® Guide)published by the Project Management Institute identifies five process groups.Briefly identify and describe each of these five process groups.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
42
Contrast project management with operations management.How do these differences impact the approach required to manage a project successfully?
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
43
From an agile project management perspective,which of these constraints are considered to be fixed?

A) Quality and value
B) Resources and schedule
C) Scope and time
D) Customer satisfaction
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following roles is typically associated with the project manager?

A) the person assigned by the performing organization to lead the team that is responsible for achieving the project objectives
B) the person with management authority over a unit within a functional organization
C) the person responsible for project methods,standards and training
D) the person responsible for providing the financial resources and support for the project and is accountable for enabling success.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
45
The leadership of top management is often cited as a factor that is critical to project success.Describe the key project related activities of the steering team,chief projects officer and sponsor.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
46
Typically,the senior customer representative is responsible for which of the following project roles?

A) develops the project schedule and budget
B) determines how the project work will be accomplished
C) ensures the needs of the customer's organization are identified and prioritized
D) helps the project manager with running meetings and providing status reports
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
47
Typically,a steering team or leadership team is responsible for all of the following project related roles EXCEPT:

A) selecting,prioritizing and resourcing projects
B) providing rigid policies,procedures,standards and guidelines
C) ensuring accurate progress is reported and adjustments made
D) aligning projects with the organization's strategic plans
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
48
Project managers frequently face competing constraints.Identify these common constraints and describe approaches that project managers can use to make the trade-offs required to succeed.
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
49
Compare and contrast predictive,or plan-driven project life cycles with agile,or change-driven life cycles.When might each type of life cycle be appropriate?
Unlock Deck
Unlock for access to all 49 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 49 flashcards in this deck.