Deck 23: Theory of Constraints

Full screen (f)
exit full mode
Question
A synchronous manufacturing system does not have excess capacity throughout the system, except for the bottleneck.
Use Space or
up arrow
down arrow
to flip the card.
Question
Synchronous manufacturing refers to the entire production process working together in harmony to achieve the goals of the firm.
Question
The operational measure of throughput is "the rate at which money is generated by the system through production of goods and services that might be sold."
Question
From an operations standpoint, one of the goals of the firm under the theory of constraints is to increase throughput while simultaneously reducing inventory and reducing operating expense.
Question
According to the theory of constraints, capacity is the time available for production.
Question
One way to find a bottleneck is to run a capacity resource profile.
Question
According to the theory of constraints, it is wrong for manufacturers to try to match capacity with demand by attempting to balance capacity across a sequence of processes.Unbalanced capacity is better.
Question
Dr.Eli Goldratt feels that the goal of a firm is to make useful products efficiently.
Question
According to the theory of constraints, a bottleneck is any resource whose capacity is greater than the demand placed on it.
Question
Mr.Goldratt's "theory of constraints" is useful only in manufacturing settings.
Question
According to the theory of constraints, throughput is the rate at which product is passed through the manufacturing system.
Question
An MRP system can allow for product rejects by building a larger batch than is demanded, but a JIT system cannot tolerate poor quality.
Question
According to the theory of constraints, the term "productivity" is defined as all those actions that bring a company closer to its goals.
Question
A way to find a bottleneck is to use one's knowledge of a particular plant, look at the system in operation, and talk with supervisors and workers.
Question
On an assembly line, a process batch can be infinite.
Question
According to the theory of constraints, throughput is the rate at which money is generated by the system through sales.
Question
OPT stands for optimal purchasing technique.
Question
Buffer inventory in front of a bottleneck is called a time buffer.
Question
According to the theory of constraints, a capacity-constrained resource (CCR) is one whose utilization is close to capacity and could be a bottleneck if it is not scheduled carefully.
Question
According to the theory of constraints, a non-bottleneck is any resource where capacity is less than the demand placed on it.
Question
The "dollar days" inventory measurement may be used to focus management's attention on where inventory is located.
Question
Rather than try to adjust the master production schedule to change resource loads, it is more practical to control the flow at each bottleneck or CCR to bring capacities in line.
Question
Because of statistical fluctuation (processing times vary around an average processing time), dependent sequences can operate without any inventory between workstations.
Question
Looking at the loads that are placed on each resource by the products that are scheduled through them is called process flow profiling.
Question
The term "dependent events" refers to a process sequence.
Question
The "dollar days" inventory measurement can be used in purchasing to discourage large work-in-process and producing earlier than is needed.
Question
Transfer batch is another term for process batch.
Question
On an assembly line, a transfer batch can be one unit.
Question
In a process sequence where a product flows from process A to process B, process A is called the mother process.
Question
Larger transfer batches give shorter lead times and lower inventories, and there is more material handling than smaller transfer batches.
Question
JIT requires a stable production level.When compared to synchronous manufacturing, this is viewed as a negative aspect of JIT.
Question
In a process sequence where a product flows from process A to process B, process B is called the dependent process.
Question
A process batch should be no larger than the transfer batch.
Question
JIT requires vendors to be located nearby.When compared to synchronous manufacturing, this is viewed as an advantage of JIT.
Question
Departments within a firm often are at odds with each other because reward systems are often not synchronized with the basic goal of the firm: to make money.
Question
JIT requires work-in-process when used with kanban so there is inventory to pull.When compared to synchronous manufacturing, this is viewed as a negative aspect of JIT.
Question
In a process sequence where a product flows from process A to process B, process B is called the contingent process.
Question
The synchronous manufacturing approach uses backward scheduling.
Question
Smaller transfer batches give lower work-in-process inventory and faster product flow.
Question
The "dollar days" inventory measurement results from a complex algorithm used to compute individual units of inventory and their respective ordering and holding costs.
Question
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?

A)If you lose an hour at a bottleneck, it is better than making scrap.
B)Do not balance capacity, balance the flow.
C)Do not allow bottlenecks to govern the flow of the line.
D)An hour saved at a bottleneck operation is a mirage.
E)The amount in a process batch should be fixed when the batch is begun and not changed over time or along its route.
Question
Name the five kinds of time that make up production cycle time according to Goldratt's theory of constraints.(1) _________________________________.(2) _________________________________.(3) _________________________________.(4) _________________________________.(5) _________________________________.
Question
According to the theory of constraints, which of the following can be a CCR?

A)Factory layout
B)Product design
C)An employee
D)A customer
E)Sales literature
Question
According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?

A)Net profit
B)Throughput
C)Return on investment
D)Sales
E)Direct labor hours
Question
Statistical fluctuation refers to the normal variation about a mean or average.
Question
The effects of statistical variations in processing times in a dependent sequence will eventually cancel themselves out due to the law of averages.
Question
Which of the following is not an important concept in TOC?

A)CCR
B)Rope
C)Drum
D)Buffer
E)File
Question
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?

A)Utilization and activation of a resource are not the same.
B)Do not allow bottlenecks to govern the flow of the line.
C)An hour lost at a bottleneck saves an hour for the entire system.
D)Balance the capacities, not the flows.
E)The level of utilization of a bottleneck resource is not determined by its own potential but by some other constraint in the system.
Question
According to the theory of constraints, which of the following is a financial measurement that can be used to measure the firm's ability to make money?

A)Net profit
B)Throughput
C)Inventory
D)Sales
E)Retained earnings
Question
What is a word indicating a resource whose capacity is less than the demand placed on it? _________________________________.
Question
Which of the following is an approach to dealing with a bottleneck?

A)Keep a buffer inventory in front of it to ensure that it always has something to work on.
B)Use Johnson's sequencing rules on bottleneck operations.
C)Don't worry about the bottleneck; it will take care of itself.
D)Move things to a faster bottleneck.
E)Pay an incentive bonus to workers on the bottleneck operation.
Question
A useful measure of inventory performance is called "dollar days." In which of the following areas are dollar days measurements not useful?

A)Marketing
B)Research and development
C)Manufacturing
D)Project management
E)Purchasing
Question
Which of the following is a negative aspect of JIT compared to synchronous manufacturing?

A)JIT cannot deal with outside vendors.
B)JIT needs broadly fluctuating production levels.
C)JIT does not allow very much flexibility in the products produced.
D)JIT requires a great deal of workforce computational skills.
E)JIT does not deal well with bottlenecks.
Question
What is the rate at which money is generated by the system through sales called? _________________________________________.
Question
According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?

A)Quality time
B)Break time
C)Research time
D)Just-in-time
E)Idle time
Question
According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?

A)Inventory
B)Sales
C)Operating revenue
D)Unit cost
E)Overhead per unit
Question
According to Mr.Goldratt, what is the goal of the firm? ___________________________________.
Question
According to the theory of constraints, which of the following is a financial measurement that can be used to measure the firm's ability to make money?

A)Operating expenses
B)Cash flow
C)Inventory
D)Sales
E)Dividends
Question
According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?

A)Process time
B)Starting time
C)Quitting time
D)Information time
E)Finish time
Question
Which of the following is a "focusing step" of Dr.Eli Goldratt's theory of constraints?

A)Reduce system constraints.
B)Reinforce system constraints.
C)Support system constraints.
D)If you have no system constraints, make some.
E)Identify system constraints.
Question
Where in a dependent-events sequence should an in-process quality inspection be placed? Why there?
Question
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A, B, C, and
C.A rope (communication) should be directed back to the start of the process, resource A, to prevent inventory from building up.Depending on the situation, a second rope can extend from the finished goods inventory location (another buffer) to resource C as described in the text.An excellent response to this question will include a diagram similar to Exhibit 23.9 and/or Exhibit 23.11.
C.A small buffer inventory should be held between resource B and resource
D.The capacity resource profile tells you that resource A is scheduled at 95 percent of capacity, resource B at 80 percent of capacity, resource C at 130 percent of capacity, and resource D at 100 percent of capacity.Assuming that the data we used to calculate the capacity resource profile are accurate, how would you employ the "drum, buffer, rope" thinking?
This concept is discussed in the text.The drum or control of the process is at the bottleneck, resource
Question
You have run a capacity resource profile on your shop.A process routes products sequentially through resources A, B, C, and
D.The capacity resource profile tells you that resource A is scheduled at 95 percent of capacity, resource B at 80 percent of capacity, resource C at 130 percent of capacity, and resource D at 100 percent of capacity.Assuming that the data we used to calculate the capacity resource profile was accurate, what have we discovered about the process A, B, C, and D? _________________________________________.
Question
What are the three financial measures of the firm's ability to make money?
(1) ______________________________.(2) ______________________________.(3) ______________________________.
Question
In Goldratt's approach to project management, what is the longest set of sequential tasks called? _____________________________________.
Question
In discussing batch size on an assembly line, the text makes the point that "one" and "infinity" are equally correct answers.How can this be?
Question
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A, B, C, and
D.The capacity resource profile tells you that resource A is scheduled at 95 percent of capacity, resource B at 80 percent of capacity, resource C at 130 percent of capacity, and resource D at 100 percent of capacity.Assuming that the data we used to calculate the capacity resource profile are accurate, what would we expect to find when we go out to the shop? ________________________________________________________.
Question
How many rules make up Goldratt's "rules of production scheduling?" ___________________________________.
Question
What are the three measurements in TOC that give guidance to the firm's operations?
(1) ______________________________.(2) ______________________________.(3) ______________________________.
Question
In a process sequence where a product flows from process A to process B, what is process B called? _______________________________________.
Question
What is the term that refers to the normal variation about a mean or average?
Question
Describe how cost accounting is sometimes antithetical to TOC?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/72
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 23: Theory of Constraints
1
A synchronous manufacturing system does not have excess capacity throughout the system, except for the bottleneck.
False
Explanation: Synchronous manufacturing has excess capacity throughout the system, except for the bottleneck.
2
Synchronous manufacturing refers to the entire production process working together in harmony to achieve the goals of the firm.
True
Explanation: Underlying Goldratt's work is the notion of synchronous manufacturing, which refers to the entire production process working in harmony to achieve the profit goal of the firm.
3
The operational measure of throughput is "the rate at which money is generated by the system through production of goods and services that might be sold."
False
Explanation: Throughput is the rate at which money is generated by the system through sales.
4
From an operations standpoint, one of the goals of the firm under the theory of constraints is to increase throughput while simultaneously reducing inventory and reducing operating expense.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
5
According to the theory of constraints, capacity is the time available for production.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
6
One way to find a bottleneck is to run a capacity resource profile.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
7
According to the theory of constraints, it is wrong for manufacturers to try to match capacity with demand by attempting to balance capacity across a sequence of processes.Unbalanced capacity is better.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
8
Dr.Eli Goldratt feels that the goal of a firm is to make useful products efficiently.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
9
According to the theory of constraints, a bottleneck is any resource whose capacity is greater than the demand placed on it.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
10
Mr.Goldratt's "theory of constraints" is useful only in manufacturing settings.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
11
According to the theory of constraints, throughput is the rate at which product is passed through the manufacturing system.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
12
An MRP system can allow for product rejects by building a larger batch than is demanded, but a JIT system cannot tolerate poor quality.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
13
According to the theory of constraints, the term "productivity" is defined as all those actions that bring a company closer to its goals.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
14
A way to find a bottleneck is to use one's knowledge of a particular plant, look at the system in operation, and talk with supervisors and workers.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
15
On an assembly line, a process batch can be infinite.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
16
According to the theory of constraints, throughput is the rate at which money is generated by the system through sales.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
17
OPT stands for optimal purchasing technique.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
18
Buffer inventory in front of a bottleneck is called a time buffer.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
19
According to the theory of constraints, a capacity-constrained resource (CCR) is one whose utilization is close to capacity and could be a bottleneck if it is not scheduled carefully.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
20
According to the theory of constraints, a non-bottleneck is any resource where capacity is less than the demand placed on it.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
21
The "dollar days" inventory measurement may be used to focus management's attention on where inventory is located.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
22
Rather than try to adjust the master production schedule to change resource loads, it is more practical to control the flow at each bottleneck or CCR to bring capacities in line.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
23
Because of statistical fluctuation (processing times vary around an average processing time), dependent sequences can operate without any inventory between workstations.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
24
Looking at the loads that are placed on each resource by the products that are scheduled through them is called process flow profiling.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
25
The term "dependent events" refers to a process sequence.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
26
The "dollar days" inventory measurement can be used in purchasing to discourage large work-in-process and producing earlier than is needed.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
27
Transfer batch is another term for process batch.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
28
On an assembly line, a transfer batch can be one unit.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
29
In a process sequence where a product flows from process A to process B, process A is called the mother process.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
30
Larger transfer batches give shorter lead times and lower inventories, and there is more material handling than smaller transfer batches.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
31
JIT requires a stable production level.When compared to synchronous manufacturing, this is viewed as a negative aspect of JIT.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
32
In a process sequence where a product flows from process A to process B, process B is called the dependent process.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
33
A process batch should be no larger than the transfer batch.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
34
JIT requires vendors to be located nearby.When compared to synchronous manufacturing, this is viewed as an advantage of JIT.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
35
Departments within a firm often are at odds with each other because reward systems are often not synchronized with the basic goal of the firm: to make money.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
36
JIT requires work-in-process when used with kanban so there is inventory to pull.When compared to synchronous manufacturing, this is viewed as a negative aspect of JIT.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
37
In a process sequence where a product flows from process A to process B, process B is called the contingent process.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
38
The synchronous manufacturing approach uses backward scheduling.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
39
Smaller transfer batches give lower work-in-process inventory and faster product flow.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
40
The "dollar days" inventory measurement results from a complex algorithm used to compute individual units of inventory and their respective ordering and holding costs.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?

A)If you lose an hour at a bottleneck, it is better than making scrap.
B)Do not balance capacity, balance the flow.
C)Do not allow bottlenecks to govern the flow of the line.
D)An hour saved at a bottleneck operation is a mirage.
E)The amount in a process batch should be fixed when the batch is begun and not changed over time or along its route.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
42
Name the five kinds of time that make up production cycle time according to Goldratt's theory of constraints.(1) _________________________________.(2) _________________________________.(3) _________________________________.(4) _________________________________.(5) _________________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
43
According to the theory of constraints, which of the following can be a CCR?

A)Factory layout
B)Product design
C)An employee
D)A customer
E)Sales literature
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
44
According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?

A)Net profit
B)Throughput
C)Return on investment
D)Sales
E)Direct labor hours
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
45
Statistical fluctuation refers to the normal variation about a mean or average.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
46
The effects of statistical variations in processing times in a dependent sequence will eventually cancel themselves out due to the law of averages.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following is not an important concept in TOC?

A)CCR
B)Rope
C)Drum
D)Buffer
E)File
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
48
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?

A)Utilization and activation of a resource are not the same.
B)Do not allow bottlenecks to govern the flow of the line.
C)An hour lost at a bottleneck saves an hour for the entire system.
D)Balance the capacities, not the flows.
E)The level of utilization of a bottleneck resource is not determined by its own potential but by some other constraint in the system.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
49
According to the theory of constraints, which of the following is a financial measurement that can be used to measure the firm's ability to make money?

A)Net profit
B)Throughput
C)Inventory
D)Sales
E)Retained earnings
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
50
What is a word indicating a resource whose capacity is less than the demand placed on it? _________________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following is an approach to dealing with a bottleneck?

A)Keep a buffer inventory in front of it to ensure that it always has something to work on.
B)Use Johnson's sequencing rules on bottleneck operations.
C)Don't worry about the bottleneck; it will take care of itself.
D)Move things to a faster bottleneck.
E)Pay an incentive bonus to workers on the bottleneck operation.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
52
A useful measure of inventory performance is called "dollar days." In which of the following areas are dollar days measurements not useful?

A)Marketing
B)Research and development
C)Manufacturing
D)Project management
E)Purchasing
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
53
Which of the following is a negative aspect of JIT compared to synchronous manufacturing?

A)JIT cannot deal with outside vendors.
B)JIT needs broadly fluctuating production levels.
C)JIT does not allow very much flexibility in the products produced.
D)JIT requires a great deal of workforce computational skills.
E)JIT does not deal well with bottlenecks.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
54
What is the rate at which money is generated by the system through sales called? _________________________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
55
According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?

A)Quality time
B)Break time
C)Research time
D)Just-in-time
E)Idle time
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
56
According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?

A)Inventory
B)Sales
C)Operating revenue
D)Unit cost
E)Overhead per unit
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
57
According to Mr.Goldratt, what is the goal of the firm? ___________________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
58
According to the theory of constraints, which of the following is a financial measurement that can be used to measure the firm's ability to make money?

A)Operating expenses
B)Cash flow
C)Inventory
D)Sales
E)Dividends
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
59
According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?

A)Process time
B)Starting time
C)Quitting time
D)Information time
E)Finish time
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following is a "focusing step" of Dr.Eli Goldratt's theory of constraints?

A)Reduce system constraints.
B)Reinforce system constraints.
C)Support system constraints.
D)If you have no system constraints, make some.
E)Identify system constraints.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
61
Where in a dependent-events sequence should an in-process quality inspection be placed? Why there?
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
62
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A, B, C, and
C.A rope (communication) should be directed back to the start of the process, resource A, to prevent inventory from building up.Depending on the situation, a second rope can extend from the finished goods inventory location (another buffer) to resource C as described in the text.An excellent response to this question will include a diagram similar to Exhibit 23.9 and/or Exhibit 23.11.
C.A small buffer inventory should be held between resource B and resource
D.The capacity resource profile tells you that resource A is scheduled at 95 percent of capacity, resource B at 80 percent of capacity, resource C at 130 percent of capacity, and resource D at 100 percent of capacity.Assuming that the data we used to calculate the capacity resource profile are accurate, how would you employ the "drum, buffer, rope" thinking?
This concept is discussed in the text.The drum or control of the process is at the bottleneck, resource
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
63
You have run a capacity resource profile on your shop.A process routes products sequentially through resources A, B, C, and
D.The capacity resource profile tells you that resource A is scheduled at 95 percent of capacity, resource B at 80 percent of capacity, resource C at 130 percent of capacity, and resource D at 100 percent of capacity.Assuming that the data we used to calculate the capacity resource profile was accurate, what have we discovered about the process A, B, C, and D? _________________________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
64
What are the three financial measures of the firm's ability to make money?
(1) ______________________________.(2) ______________________________.(3) ______________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
65
In Goldratt's approach to project management, what is the longest set of sequential tasks called? _____________________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
66
In discussing batch size on an assembly line, the text makes the point that "one" and "infinity" are equally correct answers.How can this be?
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
67
You have run a capacity resource profile on your shop.Products have been routed sequentially through resources A, B, C, and
D.The capacity resource profile tells you that resource A is scheduled at 95 percent of capacity, resource B at 80 percent of capacity, resource C at 130 percent of capacity, and resource D at 100 percent of capacity.Assuming that the data we used to calculate the capacity resource profile are accurate, what would we expect to find when we go out to the shop? ________________________________________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
68
How many rules make up Goldratt's "rules of production scheduling?" ___________________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
69
What are the three measurements in TOC that give guidance to the firm's operations?
(1) ______________________________.(2) ______________________________.(3) ______________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
70
In a process sequence where a product flows from process A to process B, what is process B called? _______________________________________.
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
71
What is the term that refers to the normal variation about a mean or average?
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
72
Describe how cost accounting is sometimes antithetical to TOC?
Unlock Deck
Unlock for access to all 72 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 72 flashcards in this deck.