In the ____ section of the business continuity policy,the training requirements for the various employee groups are defined and highlighted.

A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
Use Space or
up arrow
down arrow
to flip the card.
Question
BC is specifically designed to get the organization's most critical services up and running as quickly as possible in order to enable the continued operation of the organization and thereby assure its existence and minimize the financial losses from the disruption.
Question
A ____ is a fully configured computer facility,with all services,communications links,and physical plant operations.

A)cold site
B)service bureau
C)warm site
D)hot site
Question
____ planning represents the final response of the organization when faced with any interruption of its critical operations.

A)Relocation
B)Event
C)Technology watch
D)Business continuity
Question
A ____ provides many of the same services and options of the hot site,but typically software applications are either not included,or not installed and configured.

A)warm site
B)cold site
C)service bureau
D)shared site
Question
The ____ is the point in the past to which the recovered applications and data at the alternate infrastructure will be restored.

A)recovery point objective
B)relocation point objective
C)simulation point objective
D)warm site objective
Question
A ____ allows the organization to provide a disaster recovery/business continuity option while reducing the overall cost.

A)service bureau
B)mutual agreement
C)time-share
D)service agreement
Question
The ____ is the amount of time that passes before an infrastructure is available once the need for BC is declared.

A)incidence response time
B)disaster recovery time
C)recovery time objective
D)reaction time objective
Question
The ____ section of the business continuity policy identifies the roles and responsibilities of the key players in the business continuity operation.

A)scope
B)education requirements
C)roles and responsibilities
D)training requirements
Question
Unlike DR planning,the identification of critical business functions and the resources to support them are the cornerstone of the process used to create the business continuity (BC)plan.
Question
____ involves the batch transfer of data to an off-site facility.

A)Database shadowing
B)Remote journaling
C)Six-tape rotation
D)Electronic vaulting
Question
____ involves the storage of duplicate online transaction data,along with the duplication of the databases at the remote site to a redundant server.

A)Remote journaling
B)Database shadowing
C)Data warehousing
D)Electronic vaulting
Question
It requires several hours,perhaps days,to make a warm site fully functional.
Question
____ is the rapid relocation of an organization's critical business functions to another location.

A)Business relocation
B)Business continuity
C)Incidence response
D)Reactive review
Question
____ involves the transfer of live transactions to an off-site facility.

A)Remote journaling
B)Database shadowing
C)Six-tape rotation
D)Electronic vaulting
Question
The primary disadvantage of a cold site is cost.
Question
A ____ is a contract between two organizations for each to assist the other in the event of a disaster.

A)time-share
B)six-tape rotation
C)business continuity plan
D)mutual agreement
Question
Unlike the IR plan and the DR plan,testing the BC plan is an ongoing activity,with each scenario tested at least semiannually and at least at a walk-through level.
Question
The ____ section of the business continuity policy identifies the organizational units and groups of employees to which the policy applies.

A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
Question
A ____ is a service agency that provides a service for a fee.

A)time-share
B)service bureau
C)mobile site
D)mirrored site
Question
Match each statement with an item below.

-Provides only rudimentary services and facilities.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Question
Which of the following groups should be represented on the BC team?

A)IT managers
B)Information security managers
C)Senior managers
D)All of the above
Question
The BC ____________________ is most likely a general manager from the operations or production division,appointed by the chief operations officer,chief finance officer,or chief executive officer.
Question
Match each statement with an item below.

-Concentrates on resuming critical functions at an alternate site.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Question
Match each statement with an item below.

-Serves as the go-to team to physically acquire and transport the needed resources to the appropriate location.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Question
In the ____ phase of the BC plan,is the official beginning of actual BC operations.

A)preparation for BC actions
B)training requirements
C)relocation to the alternate site
D)special considerations
Question
The term ____________________ is used in the military and government sectors to represent the process of moving out of temporary facilities and returning them to the owners or managers.
Question
Match each statement with an item below.

-Installs wireless networks in the short term to provide immediate connectivity,unless wired services can be brought online quickly.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Question
A ____ agreement usually guarantees space when needed,even if this means that the service bureau has to acquire additional space in the event of a widespread disaster.

A)mutual
B)noncompete
C)service
D)nondisclosure
Question
A(n)____________________ stipulates that each organization is obligated to provide the necessary facilities,resources,and services until the receiving organization is able to recover from the disaster.
Question
The ____ section of the business continuity policy provides an overview of the information storage and retrieval plans of the organization.

A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
Question
Match each statement with an item below.

-A duplicate facility that only needs the latest data backups and the personnel to function.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Question
Match each statement with an item below.

-Involves online activities on a systems level.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Question
In the ____ phase of the BC plan,the organization specifies what type of relocation services are desired and what type of data management strategies are deployed to support relocation.

A)preparation for BC actions
B)training requirements
C)roles and responsibilities
D)special considerations
Question
____________________ duplicate computing resources,peripherals,phone systems,applications,and workstations.
Question
The ____ is the group responsible for initiating the occupation of the alternate facility.

A)advance party
B)disaster recovery team
C)applications development team
D)forensic team
Question
A(n)____________________ site is an empty room with standard heating,air conditioning,and electrical service.
Question
Match each statement with an item below.

-Focuses on resuming operations at the primary site.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Question
Match each statement with an item below.

-Works closely with the hardware,apps,and data teams to establish system functions during relocation.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Question
Match each statement with an item below.

-Must be renegotiated periodically.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Question
What is the purpose of the business continuity program at the organization?
Question
What are the disadvantages of a time-share?
Question
What is the difference between the recovery time objective and the recovery point objective?
Question
Discuss five tips for effective BC planning.
Question
Why should the should BC and DR teams contain different individuals?
Question
What are the responsibilities of the business continuity management team,the operations team,and the computer setup (hardware)team?
Question
What are the responsibilities of the applications recovery team,the data management team,and the logistics team?
Question
What is the seven-step process used to develop and maintain a viable contingency planning program?
Question
Briefly describe the following two operations that must be specified in the BC plan to support return to the primary site: scheduling of employee move and vanguard clearing responsibilities.
Question
How does remote journaling differ from electronic vaulting?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/50
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 9: Business Continuity Preparation and Implementation
1
In the ____ section of the business continuity policy,the training requirements for the various employee groups are defined and highlighted.

A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
B
2
BC is specifically designed to get the organization's most critical services up and running as quickly as possible in order to enable the continued operation of the organization and thereby assure its existence and minimize the financial losses from the disruption.
True
3
A ____ is a fully configured computer facility,with all services,communications links,and physical plant operations.

A)cold site
B)service bureau
C)warm site
D)hot site
D
4
____ planning represents the final response of the organization when faced with any interruption of its critical operations.

A)Relocation
B)Event
C)Technology watch
D)Business continuity
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
5
A ____ provides many of the same services and options of the hot site,but typically software applications are either not included,or not installed and configured.

A)warm site
B)cold site
C)service bureau
D)shared site
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
6
The ____ is the point in the past to which the recovered applications and data at the alternate infrastructure will be restored.

A)recovery point objective
B)relocation point objective
C)simulation point objective
D)warm site objective
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
7
A ____ allows the organization to provide a disaster recovery/business continuity option while reducing the overall cost.

A)service bureau
B)mutual agreement
C)time-share
D)service agreement
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
8
The ____ is the amount of time that passes before an infrastructure is available once the need for BC is declared.

A)incidence response time
B)disaster recovery time
C)recovery time objective
D)reaction time objective
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
9
The ____ section of the business continuity policy identifies the roles and responsibilities of the key players in the business continuity operation.

A)scope
B)education requirements
C)roles and responsibilities
D)training requirements
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
10
Unlike DR planning,the identification of critical business functions and the resources to support them are the cornerstone of the process used to create the business continuity (BC)plan.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
11
____ involves the batch transfer of data to an off-site facility.

A)Database shadowing
B)Remote journaling
C)Six-tape rotation
D)Electronic vaulting
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
12
____ involves the storage of duplicate online transaction data,along with the duplication of the databases at the remote site to a redundant server.

A)Remote journaling
B)Database shadowing
C)Data warehousing
D)Electronic vaulting
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
13
It requires several hours,perhaps days,to make a warm site fully functional.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
14
____ is the rapid relocation of an organization's critical business functions to another location.

A)Business relocation
B)Business continuity
C)Incidence response
D)Reactive review
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
15
____ involves the transfer of live transactions to an off-site facility.

A)Remote journaling
B)Database shadowing
C)Six-tape rotation
D)Electronic vaulting
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
16
The primary disadvantage of a cold site is cost.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
17
A ____ is a contract between two organizations for each to assist the other in the event of a disaster.

A)time-share
B)six-tape rotation
C)business continuity plan
D)mutual agreement
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
18
Unlike the IR plan and the DR plan,testing the BC plan is an ongoing activity,with each scenario tested at least semiannually and at least at a walk-through level.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
19
The ____ section of the business continuity policy identifies the organizational units and groups of employees to which the policy applies.

A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
20
A ____ is a service agency that provides a service for a fee.

A)time-share
B)service bureau
C)mobile site
D)mirrored site
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
21
Match each statement with an item below.

-Provides only rudimentary services and facilities.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following groups should be represented on the BC team?

A)IT managers
B)Information security managers
C)Senior managers
D)All of the above
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
23
The BC ____________________ is most likely a general manager from the operations or production division,appointed by the chief operations officer,chief finance officer,or chief executive officer.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
24
Match each statement with an item below.

-Concentrates on resuming critical functions at an alternate site.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
25
Match each statement with an item below.

-Serves as the go-to team to physically acquire and transport the needed resources to the appropriate location.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
26
In the ____ phase of the BC plan,is the official beginning of actual BC operations.

A)preparation for BC actions
B)training requirements
C)relocation to the alternate site
D)special considerations
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
27
The term ____________________ is used in the military and government sectors to represent the process of moving out of temporary facilities and returning them to the owners or managers.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
28
Match each statement with an item below.

-Installs wireless networks in the short term to provide immediate connectivity,unless wired services can be brought online quickly.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
29
A ____ agreement usually guarantees space when needed,even if this means that the service bureau has to acquire additional space in the event of a widespread disaster.

A)mutual
B)noncompete
C)service
D)nondisclosure
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
30
A(n)____________________ stipulates that each organization is obligated to provide the necessary facilities,resources,and services until the receiving organization is able to recover from the disaster.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
31
The ____ section of the business continuity policy provides an overview of the information storage and retrieval plans of the organization.

A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
32
Match each statement with an item below.

-A duplicate facility that only needs the latest data backups and the personnel to function.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
33
Match each statement with an item below.

-Involves online activities on a systems level.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
34
In the ____ phase of the BC plan,the organization specifies what type of relocation services are desired and what type of data management strategies are deployed to support relocation.

A)preparation for BC actions
B)training requirements
C)roles and responsibilities
D)special considerations
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
35
____________________ duplicate computing resources,peripherals,phone systems,applications,and workstations.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
36
The ____ is the group responsible for initiating the occupation of the alternate facility.

A)advance party
B)disaster recovery team
C)applications development team
D)forensic team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
37
A(n)____________________ site is an empty room with standard heating,air conditioning,and electrical service.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
38
Match each statement with an item below.

-Focuses on resuming operations at the primary site.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
39
Match each statement with an item below.

-Works closely with the hardware,apps,and data teams to establish system functions during relocation.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
40
Match each statement with an item below.

-Must be renegotiated periodically.

A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
41
What is the purpose of the business continuity program at the organization?
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
42
What are the disadvantages of a time-share?
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
43
What is the difference between the recovery time objective and the recovery point objective?
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
44
Discuss five tips for effective BC planning.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
45
Why should the should BC and DR teams contain different individuals?
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
46
What are the responsibilities of the business continuity management team,the operations team,and the computer setup (hardware)team?
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
47
What are the responsibilities of the applications recovery team,the data management team,and the logistics team?
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
48
What is the seven-step process used to develop and maintain a viable contingency planning program?
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
49
Briefly describe the following two operations that must be specified in the BC plan to support return to the primary site: scheduling of employee move and vanguard clearing responsibilities.
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
50
How does remote journaling differ from electronic vaulting?
Unlock Deck
Unlock for access to all 50 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 50 flashcards in this deck.