Question
Sometimes when two software products are integrated, the vendors will only allow specially qualified IT personnel to make changes to them such as installing an upgrade.
Use Space or
up arrow
down arrow
to flip the card.
Question
An employee or client may be an end-user of an ERP system.
Question
When functionality is missing from an ERP package, sometimes it can be provided by using a third party product.
Question
Reliable multi-user DBMSs are also required when implementing an ERP system.
Question
Because they are such strong competitors, SAP ERP software will not run on Oracle's DBMS.
Question
The change management team determines the gaps between the ERP functionality and the business process requirements.
Question
Integration is the sharing of data and data elements directly with the ERP system.
Question
Integrating other systems is a major problem for ERP systems.
Question
One of the good things about ERP systems is that they don't require much in the way of hardware to run them.
Question
To run ERP software, high-end multi-processor servers are usually needed.
Question
A database administrator is an example of an IT specialist who might be a member of the ERP implementation team.
Question
Project management software is required for an ERP implementation.
Question
The current generation of ERP systems uses thick clients to access the software.
Question
In general, interfaces should be two-way.
Question
Vendors will often give their software partners an early release of any new products or upgrades so the partner has a chance to change their product to work with the new release.
Question
Because they are self-contained and have embedded processes, EP systems do not require extra long-term storage devices.
Question
Security software is not necessary in ERP systems.
Question
ERP systems work on all operating systems except Linux.
Question
Most ERP systems today can work with a variety of DBMSs.
Question
The QA team customizes the ERP system functionality.
Question
The problem with relational databases is that they are hard to connect to ERP systems.
Question
A single ERP system cycle is easier to maintain and support.
Question
One key to a successful ERP implementation is to have a well-defined and proven methodology.
Question
The Change Management team is typically a part of the larger project team.
Question
If a company chooses a "vanilla" ERP implementation, they will have to change their own business practices to fit the software.
Question
In an ERP system implementation, staff should outline and define committees and workgroups that are responsible for different components of the implementation.
Question
The decision to modify or not modify an ERP system is critical and should be done ________ of the implementation.

A) at the beginning
B) throughout
C) in the design phase
D) in the maintenance phase
Question
When an ERP system is upgraded, often bugs and problems are associated with the:

A) applications.
B) databases.
C) modules.
D) modified code.
Question
The person who is ultimately responsible for the success of the ERP implementation is the consultant.
Question
In order to execute transactions, the ERP system must retrieve and summarize large amounts of data.
Question
________ is not typically a reason for implementing an ERP system.

A) Replacing legacy systems
B) Improving services
C) Increasing costs
D) Increasing profit margins
Question
Most database packages can be used to support large ERP system implementations.
Question
Processing transactions and generating reports do not work well with a single database instance.
Question
The Project software oversees all project activities and makes sure that the project stays within its scope.
Question
Governance helps define the processes and underlying accountabilities that guide the management of the ERP project.
Question
A project methodology should address all the components of the project from project startup through system planning.
Question
ERP implementations with a lot of customization may require extensive maintenance when the system is upgraded.
Question
ERP project management is considered to be a component of ERP governance.
Question
In terms of governance, senior management are the owners of the ERP project.
Question
It is crucial that the governance structure be bypassed by all involved before the ERP project begins.
Question
________ are add-on software components to either make the system operational or add missing functionality not offered by the ERP system.

A) Applications
B) Web sites
C) E-business components
D) Third party products
Question
Most new ERP systems are ________ which provides flexible access to the applications.

A) single instances
B) web-based
C) scalable
D) network-based
Question
A(n) ________ is a process by which data or data tables are copied or updated to and/or from the ERP system.

A) methodology
B) protocol
C) interface
D) integration
E) data migration
Question
The downside of using an interface for integration is that the data will not be as ________ as it would be if it were integrated more directly.

A) accurate
B) timely
C) economical
D) valuable
Question
The ________ team determines the gaps between the ERP functionality and the business process requirements.

A) functional
B) change management
C) development
D) data migration
Question
Database administrators and IT operations support personnel are examples of:

A) end-users.
B) design team members.
C) IT executives.
D) IT specialists.
Question
The hardware resources needed for an ERP system include servers, clients, and:

A) peripherals.
B) memory.
C) software.
D) browsers.
E) wireless routers.
Question
An ERP system needs a powerful set of ________ for development, testing and its production environments.

A) protocols
B) consultants
C) servers
D) vendors
Question
The infrastructure behind an ERP system must be planned with the idea that it will probably have to be ________ as the system matures.

A) decommissioned
B) archived
C) expanded
D) processed
E) integrated
Question
The key software resources for ERP systems include ________, database management systems, and applications.

A) maintenance software
B) project management software
C) system software
D) browsers
Question
The ________ has to put together a good project team and work with top management to get support and resources for the project.

A) Steering Committee
B) project manager
C) IT executive
D) IT specialist
Question
The ________ team works with end-user training, communications and support activities.

A) functional
B) change management
C) development
D) data migration
Question
Application software is the programs or ________ that help in the development, monitoring, and integration of ERP software.

A) legacy systems
B) utility software
C) databases
D) system software
Question
For their ERP implementations, some businesses ________ the server and the database environment.

A) develop
B) outsource
C) use
D) offshore
Question
The success or failure of an ERP implementation is ultimately in the hands of the:

A) end-users.
B) design team members.
C) IT executives.
D) IT specialists.
Question
Hurricane Katrina made it clear how important disaster ________ is today for every ERP implementation.

A) problem-solving
B) infrastructure
C) planning
D) management
Question
In order to ensure that their desktop PCs are secure, businesses often develop ________ PC configurations for users.

A) advanced
B) in-house
C) embedded
D) standard
Question
The ________ team customizes the systems functionality.

A) functional
B) change management
C) development
D) data migration
Question
When planning for disasters, it is important to first identify those systems that are:

A) outsourced.
B) legacy systems.
C) highly technical.
D) mission critical.
Question
Security ________ is critical to any systems reliability and integrity.

A) designing
B) purchasing
C) managing
D) awareness
E) configuration
Question
Without the necessary people, ERP projects could not be successful. What are some of the roles played in an ERP implementation?
Question
No ERP system is totally ________ and meets all the user requirements.

A) paid for
B) finished
C) bug-free
D) free
E) none of the above
Question
The ________ meets to resolve all cross-module issues.

A) project team
B) cross-functional team
C) steering committee
D) change management team
E) none of the above
Question
The recent development of ________ is an attempt to solve the interfacing and integration problems associated with ERP systems.

A) operating systems
B) bolt-ons
C) project management tools
D) middleware
E) AI tools
Question
The ________ Committee will oversee the project's efforts and ensure appropriate leadership.

A) Executive
B) Steering
C) Governance
D) ERP
E) none of the above
Question
Businesses that are not skilled at building or changing systems should consider a(n) ________ ERP implementation.

A) massive
B) comprehensive
C) vanilla
D) chocolate
E) none of the above
Question
Project team members provide direction and ERP application knowledge with respect to business ________ design and configuration.

A) hardware
B) software
C) process
D) data
E) none of the above
Question
Faster servers and increases in storage capacities made the single ________ feasible for ERP systems.

A) database instance
B) user interface
C) access point
D) governance
E) none of the above
Question
An ERP project is said to be a "vanilla" implementation when ________ are not allowed.

A) users
B) modifications
C) managers
D) chocolates
E) none of the above
Question
________ play an important role in the rapid implementation of ERP systems.

A) Consultants
B) Data
C) Software
D) Hardware
E) none of the above
Question
ERP systems are initially set up to support ________ as opposed to supporting the reporting component.

A) decision-making
B) planning
C) transactional components
D) marketing
E) project management
Question
The ________ is/are responsible for resolving functional issues raised to the Steering Committee.

A) application steward
B) project manager
C) project executives
D) steering committee
E) none of the above
Question
What are some of the different sub-teams that will work with the overall implementation team?
Question
Having a well-defined project methodology is very helpful in managing the inherent ________ of the ERP project.

A) hardware
B) software
C) costs
D) risks
E) none of the above
Question
What are the main hardware components of an ERP system?
Question
External consultants may be valuable implementation partners because they have the ________ and experience of implementing many successful projects.

A) time
B) money
C) knowledge base
D) hardware
E) none of the above
Question
The ________ is/are in charge of managing the day-to-day aspects of the ERP project.

A) application steward
B) project manager
C) project executives
D) steering committee
E) none of the above
Question
Change management activities should ________ the entire ERP project.

A) occur throughout
B) occur in the beginning of
C) occur at the end of
D) never occur in
E) none of the above
Question
Describe the different software components used in an ERP system.
Question
What are third party products and why are they needed?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/84
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 5: Implementation Strategies
1
Sometimes when two software products are integrated, the vendors will only allow specially qualified IT personnel to make changes to them such as installing an upgrade.
True
2
An employee or client may be an end-user of an ERP system.
True
3
When functionality is missing from an ERP package, sometimes it can be provided by using a third party product.
True
4
Reliable multi-user DBMSs are also required when implementing an ERP system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
5
Because they are such strong competitors, SAP ERP software will not run on Oracle's DBMS.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
6
The change management team determines the gaps between the ERP functionality and the business process requirements.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
7
Integration is the sharing of data and data elements directly with the ERP system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
8
Integrating other systems is a major problem for ERP systems.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
9
One of the good things about ERP systems is that they don't require much in the way of hardware to run them.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
10
To run ERP software, high-end multi-processor servers are usually needed.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
11
A database administrator is an example of an IT specialist who might be a member of the ERP implementation team.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
12
Project management software is required for an ERP implementation.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
13
The current generation of ERP systems uses thick clients to access the software.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
14
In general, interfaces should be two-way.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
15
Vendors will often give their software partners an early release of any new products or upgrades so the partner has a chance to change their product to work with the new release.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
16
Because they are self-contained and have embedded processes, EP systems do not require extra long-term storage devices.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
17
Security software is not necessary in ERP systems.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
18
ERP systems work on all operating systems except Linux.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
19
Most ERP systems today can work with a variety of DBMSs.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
20
The QA team customizes the ERP system functionality.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
21
The problem with relational databases is that they are hard to connect to ERP systems.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
22
A single ERP system cycle is easier to maintain and support.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
23
One key to a successful ERP implementation is to have a well-defined and proven methodology.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
24
The Change Management team is typically a part of the larger project team.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
25
If a company chooses a "vanilla" ERP implementation, they will have to change their own business practices to fit the software.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
26
In an ERP system implementation, staff should outline and define committees and workgroups that are responsible for different components of the implementation.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
27
The decision to modify or not modify an ERP system is critical and should be done ________ of the implementation.

A) at the beginning
B) throughout
C) in the design phase
D) in the maintenance phase
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
28
When an ERP system is upgraded, often bugs and problems are associated with the:

A) applications.
B) databases.
C) modules.
D) modified code.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
29
The person who is ultimately responsible for the success of the ERP implementation is the consultant.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
30
In order to execute transactions, the ERP system must retrieve and summarize large amounts of data.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
31
________ is not typically a reason for implementing an ERP system.

A) Replacing legacy systems
B) Improving services
C) Increasing costs
D) Increasing profit margins
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
32
Most database packages can be used to support large ERP system implementations.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
33
Processing transactions and generating reports do not work well with a single database instance.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
34
The Project software oversees all project activities and makes sure that the project stays within its scope.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
35
Governance helps define the processes and underlying accountabilities that guide the management of the ERP project.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
36
A project methodology should address all the components of the project from project startup through system planning.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
37
ERP implementations with a lot of customization may require extensive maintenance when the system is upgraded.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
38
ERP project management is considered to be a component of ERP governance.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
39
In terms of governance, senior management are the owners of the ERP project.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
40
It is crucial that the governance structure be bypassed by all involved before the ERP project begins.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
41
________ are add-on software components to either make the system operational or add missing functionality not offered by the ERP system.

A) Applications
B) Web sites
C) E-business components
D) Third party products
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
42
Most new ERP systems are ________ which provides flexible access to the applications.

A) single instances
B) web-based
C) scalable
D) network-based
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
43
A(n) ________ is a process by which data or data tables are copied or updated to and/or from the ERP system.

A) methodology
B) protocol
C) interface
D) integration
E) data migration
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
44
The downside of using an interface for integration is that the data will not be as ________ as it would be if it were integrated more directly.

A) accurate
B) timely
C) economical
D) valuable
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
45
The ________ team determines the gaps between the ERP functionality and the business process requirements.

A) functional
B) change management
C) development
D) data migration
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
46
Database administrators and IT operations support personnel are examples of:

A) end-users.
B) design team members.
C) IT executives.
D) IT specialists.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
47
The hardware resources needed for an ERP system include servers, clients, and:

A) peripherals.
B) memory.
C) software.
D) browsers.
E) wireless routers.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
48
An ERP system needs a powerful set of ________ for development, testing and its production environments.

A) protocols
B) consultants
C) servers
D) vendors
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
49
The infrastructure behind an ERP system must be planned with the idea that it will probably have to be ________ as the system matures.

A) decommissioned
B) archived
C) expanded
D) processed
E) integrated
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
50
The key software resources for ERP systems include ________, database management systems, and applications.

A) maintenance software
B) project management software
C) system software
D) browsers
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
51
The ________ has to put together a good project team and work with top management to get support and resources for the project.

A) Steering Committee
B) project manager
C) IT executive
D) IT specialist
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
52
The ________ team works with end-user training, communications and support activities.

A) functional
B) change management
C) development
D) data migration
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
53
Application software is the programs or ________ that help in the development, monitoring, and integration of ERP software.

A) legacy systems
B) utility software
C) databases
D) system software
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
54
For their ERP implementations, some businesses ________ the server and the database environment.

A) develop
B) outsource
C) use
D) offshore
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
55
The success or failure of an ERP implementation is ultimately in the hands of the:

A) end-users.
B) design team members.
C) IT executives.
D) IT specialists.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
56
Hurricane Katrina made it clear how important disaster ________ is today for every ERP implementation.

A) problem-solving
B) infrastructure
C) planning
D) management
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
57
In order to ensure that their desktop PCs are secure, businesses often develop ________ PC configurations for users.

A) advanced
B) in-house
C) embedded
D) standard
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
58
The ________ team customizes the systems functionality.

A) functional
B) change management
C) development
D) data migration
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
59
When planning for disasters, it is important to first identify those systems that are:

A) outsourced.
B) legacy systems.
C) highly technical.
D) mission critical.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
60
Security ________ is critical to any systems reliability and integrity.

A) designing
B) purchasing
C) managing
D) awareness
E) configuration
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
61
Without the necessary people, ERP projects could not be successful. What are some of the roles played in an ERP implementation?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
62
No ERP system is totally ________ and meets all the user requirements.

A) paid for
B) finished
C) bug-free
D) free
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
63
The ________ meets to resolve all cross-module issues.

A) project team
B) cross-functional team
C) steering committee
D) change management team
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
64
The recent development of ________ is an attempt to solve the interfacing and integration problems associated with ERP systems.

A) operating systems
B) bolt-ons
C) project management tools
D) middleware
E) AI tools
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
65
The ________ Committee will oversee the project's efforts and ensure appropriate leadership.

A) Executive
B) Steering
C) Governance
D) ERP
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
66
Businesses that are not skilled at building or changing systems should consider a(n) ________ ERP implementation.

A) massive
B) comprehensive
C) vanilla
D) chocolate
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
67
Project team members provide direction and ERP application knowledge with respect to business ________ design and configuration.

A) hardware
B) software
C) process
D) data
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
68
Faster servers and increases in storage capacities made the single ________ feasible for ERP systems.

A) database instance
B) user interface
C) access point
D) governance
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
69
An ERP project is said to be a "vanilla" implementation when ________ are not allowed.

A) users
B) modifications
C) managers
D) chocolates
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
70
________ play an important role in the rapid implementation of ERP systems.

A) Consultants
B) Data
C) Software
D) Hardware
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
71
ERP systems are initially set up to support ________ as opposed to supporting the reporting component.

A) decision-making
B) planning
C) transactional components
D) marketing
E) project management
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
72
The ________ is/are responsible for resolving functional issues raised to the Steering Committee.

A) application steward
B) project manager
C) project executives
D) steering committee
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
73
What are some of the different sub-teams that will work with the overall implementation team?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
74
Having a well-defined project methodology is very helpful in managing the inherent ________ of the ERP project.

A) hardware
B) software
C) costs
D) risks
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
75
What are the main hardware components of an ERP system?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
76
External consultants may be valuable implementation partners because they have the ________ and experience of implementing many successful projects.

A) time
B) money
C) knowledge base
D) hardware
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
77
The ________ is/are in charge of managing the day-to-day aspects of the ERP project.

A) application steward
B) project manager
C) project executives
D) steering committee
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
78
Change management activities should ________ the entire ERP project.

A) occur throughout
B) occur in the beginning of
C) occur at the end of
D) never occur in
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
79
Describe the different software components used in an ERP system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
80
What are third party products and why are they needed?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 84 flashcards in this deck.