Deck 4: Construction and Software Development Project Management
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
Play
Full screen (f)
Deck 4: Construction and Software Development Project Management
1
The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is
A)4.76 m3
B)10.32 m3
C)8.43 m3
D)6.51 m3
A)4.76 m3
B)10.32 m3
C)8.43 m3
D)6.51 m3
6.51 m3
2
The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is___________
A)18.24 m3
B)15.23 m3
C)24.87 m3
D)32.45 m3
A)18.24 m3
B)15.23 m3
C)24.87 m3
D)32.45 m3
18.24 m3
3
The unit of payment of cement concrete in lintels is_____________
A)per sqm
B)per cum
C)quintal
D)kilograms
A)per sqm
B)per cum
C)quintal
D)kilograms
per cum
4
Which of the following are parameters involved in computing the total cost of a software development project?
A)hardware and software costs
B)effort costs
C)travel and training costs
D)all of the mentioned
A)hardware and software costs
B)effort costs
C)travel and training costs
D)all of the mentioned
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following costs is not part of the total effort cost?
A)costs of networking and communications
B)costs of providing heating and lighting office space
C)costs of lunch time food
D)costs of support staff
A)costs of networking and communications
B)costs of providing heating and lighting office space
C)costs of lunch time food
D)costs of support staff
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
What is related to the overall functionality of the delivered software?
A)function-related metrics
B)product-related metrics
C)size-related metrics
D)none of the mentioned
A)function-related metrics
B)product-related metrics
C)size-related metrics
D)none of the mentioned
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
It is often difficult to estimate size at an early stage in a project when only a specification is available
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
For First class building drawing room and dining room floors shall be of _____________
A)concrete
B)tiles
C)mosaic
D)wooden
A)concrete
B)tiles
C)mosaic
D)wooden
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
For 2nd class building rain water pipes shall be of _____________finished painted.
A)cast iron
B)bog iron
C)brown ore
D)pyrite
A)cast iron
B)bog iron
C)brown ore
D)pyrite
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
Specification does not specify or describes the nature and the class off the work, materials to be used in the work, workmanship, etc.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
The specifications are written in a language so that they indicate what the work should be and words "shall be" or "should be" are used.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
General specification gives the nature and the class of the work and the materials in general terms.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
For first class building the foundation and plinth shall be of 1st class brickwork in lime mortar or 1:2 cement mortar over lime concrete or 1:6:7 cement concrete.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
For third class building flooring shall be of brick-on-edge floor over well rammed earth.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
For fourth class building the doors and windows shall be of_____________wood or country wood.
A)sal
B)neem
C)teak
D)mango
A)sal
B)neem
C)teak
D)mango
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
The water proof mud- plaster consists of
A)soil
B)janta emulsion
C)cowdung
D)soil, janta emulsion and cowdung
A)soil
B)janta emulsion
C)cowdung
D)soil, janta emulsion and cowdung
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
The brick work is not measured in cu m in case of _____________
A)one or more than one brick wall
B)brick work in arches
C)reinforced brick work
D)half brick wall
A)one or more than one brick wall
B)brick work in arches
C)reinforced brick work
D)half brick wall
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
The excavation exceeding 1.5 m in width and 10 sq. m in plan area with a depth not exceeding 30 cm, is termed as _____________
A)excavation
B)surface dressing
C)surface excavation
D)cutting
A)excavation
B)surface dressing
C)surface excavation
D)cutting
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
The roofing cannot be made with slate.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck