Question
Mixing of grease formulations may cause a breakdown of lubricating properties.
Use Space or
up arrow
down arrow
to flip the card.
Question
Visual inspection items for a generator may include: mounting hardware, bearing discoloration, and ___________.

A) rotor slip ring condition
B) lubricant texture and color
C) paint color
D) All answers are correct
Question
Component alignment activities during a maintenance cycle may include correction of ______.

A) soft foot
B) axial misalignment
C) parallel misalignment
D) All answers are correct
Question
Insulation resistance testing of stator windings is a good predictive maintenance practice to track generator condition.
Question
Dimension "B" input for the LASER alignment control unit is the distance between fasteners mounting the generator feet.
Question
The LASER stationary head should be mounted on the generator shaft for an alignment activity.
Question
Never look directly at the LASER transmitter light because it can cause eye damage.
Question
Visual indications a generator may be operating above the rated temperature specification include: discoloration or darkening of painted surfaces and melted informational decals.
Question
Generator misalignment may be seen during a visual inspection as damage to the shaft coupling or bearings.
Question
Generic alignment steps include mounting the LASER heads and ______.

A) reviewing MSDS for lubricant
B) painting the gearbox
C) measure distance between LASER heads
D) All answers are correct
Question
An approved LOTO procedure should be completed before inspecting power cable terminals in generator junction boxes.
Question
Wind turbine generators are classified as either permanent magnet or electromagnet designs.
Question
Electrical maintenance activities for a generator may include checking wire connections and ____________.

A) changing slip ring brushes
B) checking ground connections
C) testing winding insulation
D) All answers are correct
Question
All wind trubine manufaturers use forced air cooling systems for their generators.
Question
Documentation on PM checklists typically include part number and __________.

A) quantity of consumables
B) service truck color
C) age of the technician
D) All answers are correct
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 13: Generator
1
Mixing of grease formulations may cause a breakdown of lubricating properties.
True
2
Visual inspection items for a generator may include: mounting hardware, bearing discoloration, and ___________.

A) rotor slip ring condition
B) lubricant texture and color
C) paint color
D) All answers are correct
D
3
Component alignment activities during a maintenance cycle may include correction of ______.

A) soft foot
B) axial misalignment
C) parallel misalignment
D) All answers are correct
D
4
Insulation resistance testing of stator windings is a good predictive maintenance practice to track generator condition.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
Dimension "B" input for the LASER alignment control unit is the distance between fasteners mounting the generator feet.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
The LASER stationary head should be mounted on the generator shaft for an alignment activity.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
Never look directly at the LASER transmitter light because it can cause eye damage.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
Visual indications a generator may be operating above the rated temperature specification include: discoloration or darkening of painted surfaces and melted informational decals.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Generator misalignment may be seen during a visual inspection as damage to the shaft coupling or bearings.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
Generic alignment steps include mounting the LASER heads and ______.

A) reviewing MSDS for lubricant
B) painting the gearbox
C) measure distance between LASER heads
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
An approved LOTO procedure should be completed before inspecting power cable terminals in generator junction boxes.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
Wind turbine generators are classified as either permanent magnet or electromagnet designs.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
Electrical maintenance activities for a generator may include checking wire connections and ____________.

A) changing slip ring brushes
B) checking ground connections
C) testing winding insulation
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
All wind trubine manufaturers use forced air cooling systems for their generators.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
Documentation on PM checklists typically include part number and __________.

A) quantity of consumables
B) service truck color
C) age of the technician
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 15 flashcards in this deck.