Deck 4: Prioritizing Systems and Functions for Recovery

Full screen (f)
exit full mode
Question
Every two out of 10 organizations say they have business continuity coverage.
Use Space or
up arrow
down arrow
to flip the card.
Question
Each disagreeing party should be allowed about 20 minutes to make its case when a consensus cannot be reached.
Question
The IT system and support analysis sheet, describes specific IT systems and the business processes they support.
Question
If the planning team cannot reach a consensus after independently ranking the possible recovery priorities, then the coordinator needs to make the decision.
Question
25 % of organizations said they believed their company insurance would cover potential losses.
Question
There are no absolute definitions for critical, essential, necessary, and desirable systems and functions.
Question
Flooding was the most frequent type of U.S.disaster during the 1990s.
Question
If consensus building is necessary, the disaster recovery planning coordinator should start with the most difficult process.
Question
The support departments should perform detailed studies of the systems or support functions required to meet disaster recovery priorities.
Question
When a disaster occurs, organizations try to maintain a full level of functionality and achieve their key goals.
Question
In a presentation, the introduction item's purpose is to ensure that all planning team members understand exactly what the department group is discussing.
Question
California was the number one ranking location for disasters from 1972 to 2000 with a total of 51.
Question
The Northridge earthquake in California occurred in 1992 .
Question
Hurricane Andrew occurred in 1992 .
Question
The planning coordinator should make a comprehensive list of all the business processes and facilities described in the inventory risk assessment reports.
Question
The planing team should develop a chart of issuance to show which facilities, departments, and staff must participate in developing recovery procedures.
Question
Palau was the lowest ranking territory for disasters from 1972 to 2000 with a total of one.
Question
If a department does not have direct responsibility for recovery of a facility or business process, it should still be involved in developing recovery procedures.
Question
Minority opinions and dissenters need to be minimized as much as possible to reduce the possibility of impacting other members.
Question
The summary statement of the department position during a business priority discussion helps to solidify its stance and provide a platform for further discussion.
Question
One of the possible consequences of noncompliance with social expectations is ____.

A)class action lawsuits
B)civil litigation
C)damaged reputation
D)all of the above
Question
One of the possible consequences of noncompliance with financial pressures is ____.

A)loss of license
B)penalties for late delivery
C)loss of market share
D)walkouts
Question
Which of the following spaces are common to all of the disaster recovery charts of responsibility?

A)Facility number
B)Department name
C)Contact information
D)Number of employees
Question
Which systems support analysis sheet should list all of the software needed to support the processes?

A)IT
B)Computer network
C)Facilities management
D)Telecommunications
Question
Which of the following systems and functions contribute to smooth operations and comfortable working conditions for employees?

A)Critical
B)Essential
C)Necessary
D)Desirable
Question
Which of the following systems and functions must be in place to support day-to-day operations?

A)Critical
B)Essential
C)Desirable
D)Necessary
Question
Which systems support analysis sheet could be numbered FMSS01?

A)Faculty management
B)Facilities management
C)Focus management
D)Focus module
Question
One of the possible consequences of noncompliance with financial pressures is ____.

A)class action lawsuits
B)government investigations
C)required borrowing of funds
D)loss of market share
Question
Which disaster recovery chart of responsibilities has spaces for the facility number, the number of buildings and employees at the facility, and contact information for responders?

A)Business process
B)Facility
C)Department
D)Both a and b
E)a, b, and c
Question
Which of the following systems and functions absolutely must be in place for any business process to continue at all?

A)Desirable
B)Necessary
C)Critical
D)Essential
Question
One of the possible consequences of noncompliance with regulatory requirements is ____.

A)labor disputes
B)loss of major customers
C)criminal charges
D)civil litigation
E)none of the above
Question
<strong>   style=vertical-align: 0px; width=432px height=310px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)CSSS01 B)HRSS01 C)CNSS01 D)HRSS01 <div style=padding-top: 35px> " style="vertical-align: 0px;" width="432px" height="310px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)CSSS01
B)HRSS01
C)CNSS01
D)HRSS01
Question
How many organizations out of 10, did not have business continuity coverage?

A)1
B)2
C)3
D)5
Question
<strong>   style=vertical-align: 0px; width=432px height=286px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)CSSS01 B)SRSS01 C)CNSS01 D)ITSS01 <div style=padding-top: 35px> " style="vertical-align: 0px;" width="432px" height="286px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)CSSS01
B)SRSS01
C)CNSS01
D)ITSS01
Question
Which of the following systems and functions improve working conditions and help to enhance the organization's performance?

A)Critical
B)Desirable
C)Necessary
D)Essential
Question
Which systems support analysis sheet should list any software or communications connectivity needed for network access?

A)IT
B)Computer network
C)Corporate security
D)Telecommunications
Question
<strong>   style=vertical-align: 0px; width=432px height=307px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)SRSS01 B)HRSS01 C)FMSS01 D)ITSS01 <div style=padding-top: 35px> " style="vertical-align: 0px;" width="432px" height="307px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)SRSS01
B)HRSS01
C)FMSS01
D)ITSS01
Question
One of the possible consequences of noncompliance with contractual requirements is ____.

A)criminal charges
B)loss of business
C)civil litigation
D)termination of managers
E)all of the above
Question
One of the possible consequences of noncompliance with management mandates is ____.

A)termination of managers
B)a shift in cash positions
C)civil litigation
D)fines
E)none of the above
Question
One of the possible consequences of noncompliance with social expectations is ____.

A)loss of license or permits
B)loss of business
C)shift in cash positions
D)damaged reputation
Question
Almost ____ of FEMA funding was required by the 1994 Northbridge earthquake.

A)$5 billion
B)$7 billion
C)$9 billion
D)$11 billion
Question
How many declarations for disasters and emergencies were issued by FEMA in 1999?

A)15
B)18
C)19
D)21
Question
What questions does the insurance review subcommittee need to ask after evaluating the terms and conditions of the insurance coverage?
Question
Which of the following were the most costly weather related disasters in the 1990s?

A)Tornados
B)Typhoons
C)Hurricanes
D)Earthquakes
E)Both b and c
Question
What is the total number of disasters declared in the U.S from 1972 to 2000 in 50 states, the District of Columbia, and 9 U.S. territories?

A)1007
B)1027
C)1037
D)1047
Question
What three disaster recovery charts of responsibilities should be developed?
Question
Which disaster recovery chart of responsibilities has spaces for the department name, facility number, and building number(s)?

A)Department
B)Business process
C)Facility
D)Both a and b
E)Both a and c
Question
What was the most frequent type of U.S. disaster during the 1990s?

A)Fires
B)Flooding
C)Tornados
D)Hurricanes
Question
What are the four classifications of systems or functions for recovery?
Question
What has happened with business continuity insurance as a result of major hurricanes, tornadoes, floods, earthquakes, and terrorist attacks during the last decade?
Question
What four things need to happen once the disaster recovery planning team has compiled exposure inventories, risk inventories, and risk assessment reports?
Question
What does the most senior manager need to do to resolve a dispute if a consensus cannot be reached?
Question
Match between columns
Tropical storm Allison (FL, LA, MS, PA, TX)
1997
Tropical storm Allison (FL, LA, MS, PA, TX)
1989
Tropical storm Allison (FL, LA, MS, PA, TX)
1999
Tropical storm Allison (FL, LA, MS, PA, TX)
1992
Tropical storm Allison (FL, LA, MS, PA, TX)
2001
Tropical storm Allison (FL, LA, MS, PA, TX)
1994
Tropical storm Allison (FL, LA, MS, PA, TX)
1996
Tropical storm Allison (FL, LA, MS, PA, TX)
1998
Tropical storm Allison (FL, LA, MS, PA, TX)
1993
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1997
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1989
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1999
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1992
Hurricane Georges (AL, FL, LA, MS, PR, VI)
2001
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1994
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1996
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1998
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1993
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1997
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1989
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1999
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1992
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
2001
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1994
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1996
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1998
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1993
Northridge earthquake (CA)
1997
Northridge earthquake (CA)
1989
Northridge earthquake (CA)
1999
Northridge earthquake (CA)
1992
Northridge earthquake (CA)
2001
Northridge earthquake (CA)
1994
Northridge earthquake (CA)
1996
Northridge earthquake (CA)
1998
Northridge earthquake (CA)
1993
Hurricane Fran (MD, NC, PA, VA, WV)
1997
Hurricane Fran (MD, NC, PA, VA, WV)
1989
Hurricane Fran (MD, NC, PA, VA, WV)
1999
Hurricane Fran (MD, NC, PA, VA, WV)
1992
Hurricane Fran (MD, NC, PA, VA, WV)
2001
Hurricane Fran (MD, NC, PA, VA, WV)
1994
Hurricane Fran (MD, NC, PA, VA, WV)
1996
Hurricane Fran (MD, NC, PA, VA, WV)
1998
Hurricane Fran (MD, NC, PA, VA, WV)
1993
Loma Prieta earthquake (CA)
1997
Loma Prieta earthquake (CA)
1989
Loma Prieta earthquake (CA)
1999
Loma Prieta earthquake (CA)
1992
Loma Prieta earthquake (CA)
2001
Loma Prieta earthquake (CA)
1994
Loma Prieta earthquake (CA)
1996
Loma Prieta earthquake (CA)
1998
Loma Prieta earthquake (CA)
1993
Hurricane Andrew (FL, LA)
1997
Hurricane Andrew (FL, LA)
1989
Hurricane Andrew (FL, LA)
1999
Hurricane Andrew (FL, LA)
1992
Hurricane Andrew (FL, LA)
2001
Hurricane Andrew (FL, LA)
1994
Hurricane Andrew (FL, LA)
1996
Hurricane Andrew (FL, LA)
1998
Hurricane Andrew (FL, LA)
1993
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1997
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1989
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1999
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1992
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
2001
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1994
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1996
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1998
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1993
Red River Valley floods (MN, ND, SD)
1997
Red River Valley floods (MN, ND, SD)
1989
Red River Valley floods (MN, ND, SD)
1999
Red River Valley floods (MN, ND, SD)
1992
Red River Valley floods (MN, ND, SD)
2001
Red River Valley floods (MN, ND, SD)
1994
Red River Valley floods (MN, ND, SD)
1996
Red River Valley floods (MN, ND, SD)
1998
Red River Valley floods (MN, ND, SD)
1993
Question
Which checklist is a helpful review tool to evaluate progress before the disaster recovery planning team moves on to develop recovery procedures?

A)Risk assessment
B)Disaster recovery planning
C)Disaster review
D)Disaster priority review
Question
What are three possible consequences of noncompliance with competitive pressures?
Question
What should the analysis of the requirements for supporting the business process, which the planning team conducted during the risk assessment show?
Question
In addition to examining terms and conditions of coverage, which areas does the insurance review subcommittee need to evaluate insurance coverage and needs?
Question
What purposes does analyzing high-priority systems or functions serve?
Question
Which disaster recovery chart of responsibilities has spaces for the business entity name, the department name, facility number, building number(s), and process number?

A)Facility
B)Department
C)Business process
D)None of the above
Question
From ____ to ____ FEMA spent more than $25.4 billion for disasters and emergencies.

A)1980, 1989
B)1990, 1999
C)1990, 2002
D)1985, 1995
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/60
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Prioritizing Systems and Functions for Recovery
1
Every two out of 10 organizations say they have business continuity coverage.
True
2
Each disagreeing party should be allowed about 20 minutes to make its case when a consensus cannot be reached.
False
3
The IT system and support analysis sheet, describes specific IT systems and the business processes they support.
True
4
If the planning team cannot reach a consensus after independently ranking the possible recovery priorities, then the coordinator needs to make the decision.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
5
25 % of organizations said they believed their company insurance would cover potential losses.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
6
There are no absolute definitions for critical, essential, necessary, and desirable systems and functions.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
7
Flooding was the most frequent type of U.S.disaster during the 1990s.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
8
If consensus building is necessary, the disaster recovery planning coordinator should start with the most difficult process.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
9
The support departments should perform detailed studies of the systems or support functions required to meet disaster recovery priorities.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
10
When a disaster occurs, organizations try to maintain a full level of functionality and achieve their key goals.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
11
In a presentation, the introduction item's purpose is to ensure that all planning team members understand exactly what the department group is discussing.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
12
California was the number one ranking location for disasters from 1972 to 2000 with a total of 51.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
13
The Northridge earthquake in California occurred in 1992 .
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
14
Hurricane Andrew occurred in 1992 .
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
15
The planning coordinator should make a comprehensive list of all the business processes and facilities described in the inventory risk assessment reports.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
16
The planing team should develop a chart of issuance to show which facilities, departments, and staff must participate in developing recovery procedures.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
17
Palau was the lowest ranking territory for disasters from 1972 to 2000 with a total of one.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
18
If a department does not have direct responsibility for recovery of a facility or business process, it should still be involved in developing recovery procedures.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
19
Minority opinions and dissenters need to be minimized as much as possible to reduce the possibility of impacting other members.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
20
The summary statement of the department position during a business priority discussion helps to solidify its stance and provide a platform for further discussion.
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
21
One of the possible consequences of noncompliance with social expectations is ____.

A)class action lawsuits
B)civil litigation
C)damaged reputation
D)all of the above
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
22
One of the possible consequences of noncompliance with financial pressures is ____.

A)loss of license
B)penalties for late delivery
C)loss of market share
D)walkouts
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following spaces are common to all of the disaster recovery charts of responsibility?

A)Facility number
B)Department name
C)Contact information
D)Number of employees
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
24
Which systems support analysis sheet should list all of the software needed to support the processes?

A)IT
B)Computer network
C)Facilities management
D)Telecommunications
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following systems and functions contribute to smooth operations and comfortable working conditions for employees?

A)Critical
B)Essential
C)Necessary
D)Desirable
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following systems and functions must be in place to support day-to-day operations?

A)Critical
B)Essential
C)Desirable
D)Necessary
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
27
Which systems support analysis sheet could be numbered FMSS01?

A)Faculty management
B)Facilities management
C)Focus management
D)Focus module
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
28
One of the possible consequences of noncompliance with financial pressures is ____.

A)class action lawsuits
B)government investigations
C)required borrowing of funds
D)loss of market share
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
29
Which disaster recovery chart of responsibilities has spaces for the facility number, the number of buildings and employees at the facility, and contact information for responders?

A)Business process
B)Facility
C)Department
D)Both a and b
E)a, b, and c
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following systems and functions absolutely must be in place for any business process to continue at all?

A)Desirable
B)Necessary
C)Critical
D)Essential
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
31
One of the possible consequences of noncompliance with regulatory requirements is ____.

A)labor disputes
B)loss of major customers
C)criminal charges
D)civil litigation
E)none of the above
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
32
<strong>   style=vertical-align: 0px; width=432px height=310px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)CSSS01 B)HRSS01 C)CNSS01 D)HRSS01 " style="vertical-align: 0px;" width="432px" height="310px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)CSSS01
B)HRSS01
C)CNSS01
D)HRSS01
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
33
How many organizations out of 10, did not have business continuity coverage?

A)1
B)2
C)3
D)5
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
34
<strong>   style=vertical-align: 0px; width=432px height=286px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)CSSS01 B)SRSS01 C)CNSS01 D)ITSS01 " style="vertical-align: 0px;" width="432px" height="286px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)CSSS01
B)SRSS01
C)CNSS01
D)ITSS01
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following systems and functions improve working conditions and help to enhance the organization's performance?

A)Critical
B)Desirable
C)Necessary
D)Essential
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
36
Which systems support analysis sheet should list any software or communications connectivity needed for network access?

A)IT
B)Computer network
C)Corporate security
D)Telecommunications
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
37
<strong>   style=vertical-align: 0px; width=432px height=307px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?</strong> A)SRSS01 B)HRSS01 C)FMSS01 D)ITSS01 " style="vertical-align: 0px;" width="432px" height="307px What should the numbering scheme be for the systems support analysis sheet displayed in the table above?

A)SRSS01
B)HRSS01
C)FMSS01
D)ITSS01
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
38
One of the possible consequences of noncompliance with contractual requirements is ____.

A)criminal charges
B)loss of business
C)civil litigation
D)termination of managers
E)all of the above
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
39
One of the possible consequences of noncompliance with management mandates is ____.

A)termination of managers
B)a shift in cash positions
C)civil litigation
D)fines
E)none of the above
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
40
One of the possible consequences of noncompliance with social expectations is ____.

A)loss of license or permits
B)loss of business
C)shift in cash positions
D)damaged reputation
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
41
Almost ____ of FEMA funding was required by the 1994 Northbridge earthquake.

A)$5 billion
B)$7 billion
C)$9 billion
D)$11 billion
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
42
How many declarations for disasters and emergencies were issued by FEMA in 1999?

A)15
B)18
C)19
D)21
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
43
What questions does the insurance review subcommittee need to ask after evaluating the terms and conditions of the insurance coverage?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following were the most costly weather related disasters in the 1990s?

A)Tornados
B)Typhoons
C)Hurricanes
D)Earthquakes
E)Both b and c
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
45
What is the total number of disasters declared in the U.S from 1972 to 2000 in 50 states, the District of Columbia, and 9 U.S. territories?

A)1007
B)1027
C)1037
D)1047
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
46
What three disaster recovery charts of responsibilities should be developed?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
47
Which disaster recovery chart of responsibilities has spaces for the department name, facility number, and building number(s)?

A)Department
B)Business process
C)Facility
D)Both a and b
E)Both a and c
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
48
What was the most frequent type of U.S. disaster during the 1990s?

A)Fires
B)Flooding
C)Tornados
D)Hurricanes
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
49
What are the four classifications of systems or functions for recovery?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
50
What has happened with business continuity insurance as a result of major hurricanes, tornadoes, floods, earthquakes, and terrorist attacks during the last decade?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
51
What four things need to happen once the disaster recovery planning team has compiled exposure inventories, risk inventories, and risk assessment reports?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
52
What does the most senior manager need to do to resolve a dispute if a consensus cannot be reached?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
53
Match between columns
Tropical storm Allison (FL, LA, MS, PA, TX)
1997
Tropical storm Allison (FL, LA, MS, PA, TX)
1989
Tropical storm Allison (FL, LA, MS, PA, TX)
1999
Tropical storm Allison (FL, LA, MS, PA, TX)
1992
Tropical storm Allison (FL, LA, MS, PA, TX)
2001
Tropical storm Allison (FL, LA, MS, PA, TX)
1994
Tropical storm Allison (FL, LA, MS, PA, TX)
1996
Tropical storm Allison (FL, LA, MS, PA, TX)
1998
Tropical storm Allison (FL, LA, MS, PA, TX)
1993
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1997
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1989
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1999
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1992
Hurricane Georges (AL, FL, LA, MS, PR, VI)
2001
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1994
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1996
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1998
Hurricane Georges (AL, FL, LA, MS, PR, VI)
1993
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1997
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1989
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1999
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1992
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
2001
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1994
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1996
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1998
Hurricane Floyd(CT, DE, FL, ME, MD, NH, NJ, NY, NC, PA, SC, VT, VA)
1993
Northridge earthquake (CA)
1997
Northridge earthquake (CA)
1989
Northridge earthquake (CA)
1999
Northridge earthquake (CA)
1992
Northridge earthquake (CA)
2001
Northridge earthquake (CA)
1994
Northridge earthquake (CA)
1996
Northridge earthquake (CA)
1998
Northridge earthquake (CA)
1993
Hurricane Fran (MD, NC, PA, VA, WV)
1997
Hurricane Fran (MD, NC, PA, VA, WV)
1989
Hurricane Fran (MD, NC, PA, VA, WV)
1999
Hurricane Fran (MD, NC, PA, VA, WV)
1992
Hurricane Fran (MD, NC, PA, VA, WV)
2001
Hurricane Fran (MD, NC, PA, VA, WV)
1994
Hurricane Fran (MD, NC, PA, VA, WV)
1996
Hurricane Fran (MD, NC, PA, VA, WV)
1998
Hurricane Fran (MD, NC, PA, VA, WV)
1993
Loma Prieta earthquake (CA)
1997
Loma Prieta earthquake (CA)
1989
Loma Prieta earthquake (CA)
1999
Loma Prieta earthquake (CA)
1992
Loma Prieta earthquake (CA)
2001
Loma Prieta earthquake (CA)
1994
Loma Prieta earthquake (CA)
1996
Loma Prieta earthquake (CA)
1998
Loma Prieta earthquake (CA)
1993
Hurricane Andrew (FL, LA)
1997
Hurricane Andrew (FL, LA)
1989
Hurricane Andrew (FL, LA)
1999
Hurricane Andrew (FL, LA)
1992
Hurricane Andrew (FL, LA)
2001
Hurricane Andrew (FL, LA)
1994
Hurricane Andrew (FL, LA)
1996
Hurricane Andrew (FL, LA)
1998
Hurricane Andrew (FL, LA)
1993
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1997
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1989
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1999
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1992
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
2001
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1994
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1996
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1998
Midwest floods (IL, IA, KS, MN, MO, NE, ND, SD, WI)
1993
Red River Valley floods (MN, ND, SD)
1997
Red River Valley floods (MN, ND, SD)
1989
Red River Valley floods (MN, ND, SD)
1999
Red River Valley floods (MN, ND, SD)
1992
Red River Valley floods (MN, ND, SD)
2001
Red River Valley floods (MN, ND, SD)
1994
Red River Valley floods (MN, ND, SD)
1996
Red River Valley floods (MN, ND, SD)
1998
Red River Valley floods (MN, ND, SD)
1993
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
54
Which checklist is a helpful review tool to evaluate progress before the disaster recovery planning team moves on to develop recovery procedures?

A)Risk assessment
B)Disaster recovery planning
C)Disaster review
D)Disaster priority review
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
55
What are three possible consequences of noncompliance with competitive pressures?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
56
What should the analysis of the requirements for supporting the business process, which the planning team conducted during the risk assessment show?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
57
In addition to examining terms and conditions of coverage, which areas does the insurance review subcommittee need to evaluate insurance coverage and needs?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
58
What purposes does analyzing high-priority systems or functions serve?
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
59
Which disaster recovery chart of responsibilities has spaces for the business entity name, the department name, facility number, building number(s), and process number?

A)Facility
B)Department
C)Business process
D)None of the above
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
60
From ____ to ____ FEMA spent more than $25.4 billion for disasters and emergencies.

A)1980, 1989
B)1990, 1999
C)1990, 2002
D)1985, 1995
Unlock Deck
Unlock for access to all 60 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 60 flashcards in this deck.