In production scheduling the process of determining which job to start first on some machine or in some work center is known as sequencing or priority sequencing.
Use Space or
up arrow
down arrow
to flip the card.
Question
The objective of Johnson's rule for job sequencing is to minimize flow time from the beginning of the first job until the completion of the last job.
Question
The textbook underscores the importance of scheduling with the phrase "workflow equals cash flow, and scheduling lies at the heart of the process."
Question
The FCFS priority rule used in sequencing production jobs will always result in a better solution than the
LCFS rule.
Question
A backward schedule tells when an order must be started in order to be done by a specific date.
Question
A shop-floor control system is a system that uses data from the shop floor as well as data processing files to maintain and communicate status information on shop orders and work centers.
Question
Using the random order or "whim" priority rule to sequence production jobs means that supervisors or operators select whichever job they feel like running.
Question
Priority rules are the rules used to obtain a job sequence in production scheduling.
Question
Shop-floor control (or production activity control) can involve expediting late and critical orders.
Question
Theoretically, all schedules are feasible when finite loading is used.
Question
A system that "backward schedules" is designed to determine and report the earliest date an order can be completed.
Question
In infinite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.
Question
The assignment method of job sequencing is a special case of the transportation method of linear programming.
Question
Shop-floor control (or production activity control) can involve reviewing the status and controlling the progress of orders as they are being worked on.
Question
The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.
Question
A work center is a physical area of the business in which productive resources are organized and work is completed.
Question
Under the STR/OP sequencing priority rule, orders with the jobs with the longest STR/OP are run first.
Question
Johnson's rule, a priority rule used in sequencing production jobs, is used only in production situations where we are dealing with one machine or one stage of production activity.
Question
In finite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.
Question
Initiating performance of scheduled work is commonly termed "dispatching" of orders.
Question
MES and SES are acronyms for "Manufacturing Environment Scheduler" and "Service Environment
Scheduler" systems, respectively.
Question
For a high-volume type of manufacturing which of the following is the typical production scheduling approach?

A)Finite backward scheduling
B)Finite forward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Assignment method
Question
One of the principles of work center scheduling is to match work center input information to what the worker can actually do.
Question
For a low-volume job shop type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite backward scheduling
D)Infinite forward scheduling
E)Soonest due date
Question
For a continuous process type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Shortest due date
Question
One of the principles of work center scheduling is that once started, a job should not be interrupted.
Question
When work is scheduled in detail using the setup and run time required for each order, then theoretically all schedules will be feasible.
Question
Scheduling hourly work times using the "first hour principle" insures that no excess labor will be used during the work shift.
Question
When work has been scheduled in a shop that does not have sufficient resources to complete the schedule on time, the system that generated the schedule is called which of the following?

A)Infinite loading
B)Machine-limited
C)Finite loading
D)Labor-limited
E)Constrained
Question
When work is assigned to a work center based on what is needed over time it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
Question
Which of the following is not an objective of work center scheduling?

A)Meeting due dates
B)Providing time for quality at the source
C)Minimizing setup time or cost
D)Minimizing work-in-process inventory
E)Minimizing lead time
Question
One of the principles of work center scheduling is that the effectiveness of any shop should be measured by speed of flow through the shop.
Question
The objectives of work center scheduling include which of the following?

A)Minimizing worker alienation
B)Provide variety to workforce
C)Following all the priority rules
D)Avoiding tradeoffs
E)Minimizing set-up costs
Question
For a mid-volume type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Precision forward scheduling
Question
One of the principles of work center scheduling is that, while certainty of standards, routings, and so forth is not entirely possible in a shop, certainty should always be an objective to work towards.
Question
A material requirements planning system is an example of which of the following scheduling systems?

A)Infinite loading, backward scheduling
B)Finite loading, backward scheduling
C)Infinite loading, forward scheduling
D)Finite loading, forward scheduling
E)None of the above
Question
Which of the following is not a standard measure of schedule performance which can be used to evaluate priority rules?

A)The schedule quality index
B)Minimizing the time a job spends in the process
C)Minimizing work-in-process inventory
D)Minimizing idle time of machines or workers
E)Meeting due dates of customers
Question
Which of the following is not a function performed in scheduling and controlling an operation?

A)Allocating orders and equipment
B)Setting priorities and sequencing jobs
C)Allocating personnel to work centers
D)Expediting late orders
E)Reporting bottleneck operations
Question
Which of the following is not a way in which a work center can be organized?

A)According to function in a work center configuration
B)According to function in an assembly line
C)By product in assembly line
D)As a group technology-cell (GT-cell)
E)By product in a flow operation
Question
When work is scheduled in detail using the setup and run time required for each order it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
Question
Which of the following is not one of the major functions of shop-floor control?

A)Measure efficiency, utilization, and productivity of manpower and machines
B)Assign a priority to each shop order
C)Load machine hours into work stations
D)Track WIP quantity by location by shop order to accounting
E)Convey shop order status information to the office
Question
Assume you are sequencing jobs using Johnson's rule.A particular job requires 3 hours to assemble and then is followed by 2 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence
B)As late as possible in the unfilled job sequence
C)The schedule would depend on the due date
D)Does not matter
E)Johnson's rule does not apply
Question
Which of the following is one of the major functions of shop-floor control?

A)Observing the priorities set for each shop order
B)Keeping work-in-process inventory out of the way
C)Conveying shop-order status information to the office
D)Controlling cost and materials waste
E)Keeping the workforce fully utilized
Question
Assume there are five jobs (i.e., A, B, C, D and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days.Which job should be scheduled last if using the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
Question
Which of the following is a tool of shop-floor control?

A)The hours worked per employee report
B)The anticipated delay report
C)The permanent work-in-process report
D)Time and motion studies
E)Product and process control report
Question
Which of the following is a priority rule used to schedule the sequence of jobs in a production operation?

A)Last come first served
B)Last complaint first
C)First on hand first
D)Longest slack time first
E)Parts on hand first
Question
A job has 5 days of processing time left to do before completion and today is the 10th day of the month.If the job is due on the 14th day of the month, what is its critical ratio?

A)5
B)2
C)0.8
D)0.5
E)0.1
Question
Assume you are sequencing jobs using Johnson's rule.A particular job requires 7 hours to assemble and then is followed by 8 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence
B)As late as possible in the unfilled job sequence
C)The schedule would depend on the due date
D)Does not matter
E)Johnson's Rule does not apply
Question
The assignment method is useful in solving scheduling problems that have which of the following characteristics?

A)There are "n" jobs to be distributed to "n" machines or workers
B)Each job can only be done on one particular machine
C)Speed and efficiency are important
D)The objective is to minimize cost and lateness of delivery
E)The jobs have to go through more than one process
Question
Assume there are five jobs (i.e., A, B, C, D and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 4 days (i.e., job A will take 4 more days to complete), B will take 7 days, C will take 8 days, D will take 2 days, and E will take 5 days, which job should be scheduled first if you use the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
Question
Which of the following is not a priority rule used to schedule the sequence of jobs in a production operation?

A)First-come-first served
B)Shortest operating time
C)Last-in-first-out
D)Critical ratio
E)Slack-time-remaining per operation
Question
Which of the following is a principle of work center scheduling?

A)Once started a job can and should be finished even if unavoidably interrupted
B)Reschedule every day
C)Achieve certainty in standards and routings
D)Give work centers less to do then their maximum
E)Assign the first worker to all of the days that require staffing
Question
Which of the following priority rules used in scheduling the sequence of production is calculated as the slack time remaining in the schedule divided by the number of remaining operations, with the smallest value being run first?

A)STR
B)Johnson's
C)STR/OP
D)LCFS
E)FCFS
Question
Assume there are five jobs (i.e., A, B, C, D and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days.In what order will these jobs be scheduled if using the SOT priority rule for job sequencing?

A)A-B-D-E-C
B)A-D-C-E-B
C)D-C-A-B-E
D)B-E-C-D-A
E)E-D-A-B-C
Question
Which of the following priority rules used in scheduling the sequence of production is calculated as the time remaining before the due date minus the remaining processing time, with the smallest value being run first?

A)STR
B)CR
C)SOT
D)LCFS
E)EDD
Question
Which of the following might be a status and exception report used in shop-floor control?

A)Absentee report
B)Quality failure report
C)Shortage lists
D)Expediting report
E)Union activity report
Question
A job has 10 days of processing time left to do before completion and today is the 5th day of the month.If the job is due on the 15th day of the month, what is its critical ratio?

A)3
B)2
C)1
D)0.8
E)- 0.8
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/57
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 19: Scheduling
1
In production scheduling the process of determining which job to start first on some machine or in some work center is known as sequencing or priority sequencing.
True
2
The objective of Johnson's rule for job sequencing is to minimize flow time from the beginning of the first job until the completion of the last job.
True
3
The textbook underscores the importance of scheduling with the phrase "workflow equals cash flow, and scheduling lies at the heart of the process."
True
4
The FCFS priority rule used in sequencing production jobs will always result in a better solution than the
LCFS rule.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
5
A backward schedule tells when an order must be started in order to be done by a specific date.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
6
A shop-floor control system is a system that uses data from the shop floor as well as data processing files to maintain and communicate status information on shop orders and work centers.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
7
Using the random order or "whim" priority rule to sequence production jobs means that supervisors or operators select whichever job they feel like running.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
8
Priority rules are the rules used to obtain a job sequence in production scheduling.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
9
Shop-floor control (or production activity control) can involve expediting late and critical orders.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
10
Theoretically, all schedules are feasible when finite loading is used.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
11
A system that "backward schedules" is designed to determine and report the earliest date an order can be completed.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
12
In infinite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
13
The assignment method of job sequencing is a special case of the transportation method of linear programming.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
14
Shop-floor control (or production activity control) can involve reviewing the status and controlling the progress of orders as they are being worked on.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
15
The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
16
A work center is a physical area of the business in which productive resources are organized and work is completed.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
17
Under the STR/OP sequencing priority rule, orders with the jobs with the longest STR/OP are run first.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
18
Johnson's rule, a priority rule used in sequencing production jobs, is used only in production situations where we are dealing with one machine or one stage of production activity.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
19
In finite loading no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
20
Initiating performance of scheduled work is commonly termed "dispatching" of orders.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
21
MES and SES are acronyms for "Manufacturing Environment Scheduler" and "Service Environment
Scheduler" systems, respectively.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
22
For a high-volume type of manufacturing which of the following is the typical production scheduling approach?

A)Finite backward scheduling
B)Finite forward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Assignment method
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
23
One of the principles of work center scheduling is to match work center input information to what the worker can actually do.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
24
For a low-volume job shop type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite backward scheduling
D)Infinite forward scheduling
E)Soonest due date
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
25
For a continuous process type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Shortest due date
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
26
One of the principles of work center scheduling is that once started, a job should not be interrupted.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
27
When work is scheduled in detail using the setup and run time required for each order, then theoretically all schedules will be feasible.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
28
Scheduling hourly work times using the "first hour principle" insures that no excess labor will be used during the work shift.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
29
When work has been scheduled in a shop that does not have sufficient resources to complete the schedule on time, the system that generated the schedule is called which of the following?

A)Infinite loading
B)Machine-limited
C)Finite loading
D)Labor-limited
E)Constrained
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
30
When work is assigned to a work center based on what is needed over time it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is not an objective of work center scheduling?

A)Meeting due dates
B)Providing time for quality at the source
C)Minimizing setup time or cost
D)Minimizing work-in-process inventory
E)Minimizing lead time
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
32
One of the principles of work center scheduling is that the effectiveness of any shop should be measured by speed of flow through the shop.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
33
The objectives of work center scheduling include which of the following?

A)Minimizing worker alienation
B)Provide variety to workforce
C)Following all the priority rules
D)Avoiding tradeoffs
E)Minimizing set-up costs
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
34
For a mid-volume type of manufacturing which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Precision forward scheduling
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
35
One of the principles of work center scheduling is that, while certainty of standards, routings, and so forth is not entirely possible in a shop, certainty should always be an objective to work towards.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
36
A material requirements planning system is an example of which of the following scheduling systems?

A)Infinite loading, backward scheduling
B)Finite loading, backward scheduling
C)Infinite loading, forward scheduling
D)Finite loading, forward scheduling
E)None of the above
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following is not a standard measure of schedule performance which can be used to evaluate priority rules?

A)The schedule quality index
B)Minimizing the time a job spends in the process
C)Minimizing work-in-process inventory
D)Minimizing idle time of machines or workers
E)Meeting due dates of customers
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following is not a function performed in scheduling and controlling an operation?

A)Allocating orders and equipment
B)Setting priorities and sequencing jobs
C)Allocating personnel to work centers
D)Expediting late orders
E)Reporting bottleneck operations
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
39
Which of the following is not a way in which a work center can be organized?

A)According to function in a work center configuration
B)According to function in an assembly line
C)By product in assembly line
D)As a group technology-cell (GT-cell)
E)By product in a flow operation
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
40
When work is scheduled in detail using the setup and run time required for each order it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following is not one of the major functions of shop-floor control?

A)Measure efficiency, utilization, and productivity of manpower and machines
B)Assign a priority to each shop order
C)Load machine hours into work stations
D)Track WIP quantity by location by shop order to accounting
E)Convey shop order status information to the office
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
42
Assume you are sequencing jobs using Johnson's rule.A particular job requires 3 hours to assemble and then is followed by 2 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence
B)As late as possible in the unfilled job sequence
C)The schedule would depend on the due date
D)Does not matter
E)Johnson's rule does not apply
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following is one of the major functions of shop-floor control?

A)Observing the priorities set for each shop order
B)Keeping work-in-process inventory out of the way
C)Conveying shop-order status information to the office
D)Controlling cost and materials waste
E)Keeping the workforce fully utilized
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
44
Assume there are five jobs (i.e., A, B, C, D and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days.Which job should be scheduled last if using the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following is a tool of shop-floor control?

A)The hours worked per employee report
B)The anticipated delay report
C)The permanent work-in-process report
D)Time and motion studies
E)Product and process control report
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following is a priority rule used to schedule the sequence of jobs in a production operation?

A)Last come first served
B)Last complaint first
C)First on hand first
D)Longest slack time first
E)Parts on hand first
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
47
A job has 5 days of processing time left to do before completion and today is the 10th day of the month.If the job is due on the 14th day of the month, what is its critical ratio?

A)5
B)2
C)0.8
D)0.5
E)0.1
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
48
Assume you are sequencing jobs using Johnson's rule.A particular job requires 7 hours to assemble and then is followed by 8 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence
B)As late as possible in the unfilled job sequence
C)The schedule would depend on the due date
D)Does not matter
E)Johnson's Rule does not apply
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
49
The assignment method is useful in solving scheduling problems that have which of the following characteristics?

A)There are "n" jobs to be distributed to "n" machines or workers
B)Each job can only be done on one particular machine
C)Speed and efficiency are important
D)The objective is to minimize cost and lateness of delivery
E)The jobs have to go through more than one process
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
50
Assume there are five jobs (i.e., A, B, C, D and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 4 days (i.e., job A will take 4 more days to complete), B will take 7 days, C will take 8 days, D will take 2 days, and E will take 5 days, which job should be scheduled first if you use the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following is not a priority rule used to schedule the sequence of jobs in a production operation?

A)First-come-first served
B)Shortest operating time
C)Last-in-first-out
D)Critical ratio
E)Slack-time-remaining per operation
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following is a principle of work center scheduling?

A)Once started a job can and should be finished even if unavoidably interrupted
B)Reschedule every day
C)Achieve certainty in standards and routings
D)Give work centers less to do then their maximum
E)Assign the first worker to all of the days that require staffing
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
53
Which of the following priority rules used in scheduling the sequence of production is calculated as the slack time remaining in the schedule divided by the number of remaining operations, with the smallest value being run first?

A)STR
B)Johnson's
C)STR/OP
D)LCFS
E)FCFS
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
54
Assume there are five jobs (i.e., A, B, C, D and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days.In what order will these jobs be scheduled if using the SOT priority rule for job sequencing?

A)A-B-D-E-C
B)A-D-C-E-B
C)D-C-A-B-E
D)B-E-C-D-A
E)E-D-A-B-C
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
55
Which of the following priority rules used in scheduling the sequence of production is calculated as the time remaining before the due date minus the remaining processing time, with the smallest value being run first?

A)STR
B)CR
C)SOT
D)LCFS
E)EDD
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following might be a status and exception report used in shop-floor control?

A)Absentee report
B)Quality failure report
C)Shortage lists
D)Expediting report
E)Union activity report
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
57
A job has 10 days of processing time left to do before completion and today is the 5th day of the month.If the job is due on the 15th day of the month, what is its critical ratio?

A)3
B)2
C)1
D)0.8
E)- 0.8
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 57 flashcards in this deck.