Deck 10: Reporting and Analyzing Liabilities

Full screen (f)
exit full mode
Question
The master budget is not used in the budgetary control process.
Use Space or
up arrow
down arrow
to flip the card.
Question
Flexible budgeting relies on the assumption that unit variable costs will remain constant within the relevant range of activity.
Question
Budget reports comparing actual results with planned objectives should be prepared only once a year.
Question
Policies regarding when a difference between actual and planned results should be investigated are generally more restrictive for noncontrollable items than for controllable items.
Question
Certain budget reports are prepared monthly, whereas others are prepared more frequently depending on the activities being monitored.
Question
A static budget is one that is geared to one level of activity.
Question
A master budget is most useful in evaluating a manager's performance in controlling costs.
Question
A flexible budget report will show both actual and budget cost based on the actual activity level achieved.
Question
A flexible budget is a series of static budgets at different levels of activities.
Question
A flexible budget is prepared before the master budget.
Question
A formula used in developing a flexible budget is: Total budgeted cost = fixed cost + (total variable cost per unit × activity level).
Question
If actual results are different from planned results, the difference must always be investigated by management to achieve effective budgetary control.
Question
A static budget is most useful for evaluating a manager's performance in controlling variable costs.
Question
Total budgeted fixed costs appearing on a flexible budget will be the same amount as total fixed costs on the master budget.
Question
Flexible budgets are widely used in production and service departments.
Question
A flexible budget can be prepared for each of the types of budgets included in the master budget.
Question
The activity index used in preparing a flexible budget should not influence the variable costs that are being budgeted.
Question
A static budget is changed only when actual activity is different from the level of activity expected.
Question
Management by exception means that management will investigate areas where actual results differ from planned results if the items are material and controllable.
Question
A distinction should be made between controllable and noncontrollable costs when reporting information under responsibility accounting.
Question
Budget reports should be prepared

A)daily.
B)monthly.
C)weekly.
D)as frequently as needed.
Question
A static budget is an effective means to evaluate a manager's ability to control costs, regardless of the actual activity level.
Question
In a responsibility accounting reporting system, as one moves up each level of responsibility in an organization, the responsibility reports become more summarized and show less detailed information.
Question
Most direct fixed costs are not controllable by the profit center manager.
Question
Cost centers, profit centers, and investment centers can all be classified as responsibility centers.
Question
The terms controllable costs and noncontrollable costs are synonymous with variable costs and fixed costs, respectively.
Question
The denominator in the formula for calculating the return on investment includes operating and nonoperating assets.
Question
The formula for computing return on investment is controllable margin divided by average operating assets.
Question
Controllable margin is subtracted from controllable fixed costs to get net income for a profit center.
Question
Budget reports provide the feedback needed by management to see whether actual operations are on course.
Question
On the basis of the budget reports,

A)management analyzes differences between actual and planned results.
B)management may take corrective action.
C)management may modify the future plans.
D)All of these.
Question
The flexible budget report evaluates a manager's performance in two areas: (1) production and (2) costs.
Question
What is budgetary control?

A)Another name for a flexible budget
B)The degree to which the CFO controls the budget
C)The use of budgets in controlling operations
D)The process of providing information on budget differences to lower level managers
Question
A major element in budgetary control is

A)the preparation of long-term plans.
B)the comparison of actual results with planned objectives.
C)the valuation of inventories.
D)approval of the budget by the stockholders.
Question
A cost center incurs costs and generates revenues and cost center managers are evaluated on the profitability of their centers.
Question
The purpose of the sales budget report is to

A)control selling expenses.
B)determine whether income objectives are being met.
C)determine whether sales goals are being met.
D)control sales commissions.
Question
The terms "direct fixed costs" and "indirect fixed costs" are synonymous with "traceable costs" and "common costs," respectively.
Question
The purpose of the departmental overhead cost report is to

A)control indirect labor costs.
B)control selling expense.
C)determine the efficient use of materials.
D)control overhead costs.
Question
The manager of an investment center can improve ROI by reducing average operating assets.
Question
More costs become controllable as one moves down to each lower level of managerial responsibility.
Question
The flexible budget

A)is prepared before the master budget.
B)is relevant both within and outside the relevant range.
C)eliminates the need for a master budget.
D)is a series of static budgets at different levels of activity.
Question
A department has budgeted monthly manufacturing overhead cost of $540,000 plus $3 per direct labor hour.If a flexible budget report reflects $1,044,000 for total budgeted manufacturing cost for the month, the actual level of activity achieved during the month was

A)528,000 direct labor hours.
B)168,000 direct labor hours.
C)348,000 direct labor hours.
D)Cannot be determined from the information provided.
Question
A flexible budget

A)is prepared when management cannot agree on objectives for the company.
B)projects budget data for various levels of activity.
C)is only useful in controlling fixed costs.
D)cannot be used for evaluation purposes because budgeted data are adjusted to reflect actual results.
Question
The comparison of differences between actual and planned results

A)is done by the external auditors.
B)appears on the company's external financial statements.
C)is usually done orally in departmental meetings.
D)appears on periodic budget reports.
Question
Another name for the static budget is

A)master budget.
B)overhead budget.
C)permanent budget.
D)flexible budget.
Question
Which one of the following would be the same total amount on a flexible budget and a static budget if the activity level is different for the two types of budgets?

A)Direct materials cost
B)Direct labor cost
C)Variable manufacturing overhead
D)Fixed manufacturing overhead
Question
If costs are not responsive to changes in activity level, then these costs can be best described as

A)mixed.
B)flexible.
C)variable.
D)fixed.
Question
A static budget

A)should not be prepared in a company.
B)is useful in evaluating a manager's performance by comparing actual variable costs and planned variable costs.
C)shows planned results at the original budgeted activity level.
D)is changed only if the actual level of activity is different than originally budgeted.
Question
When budgeted and actual results are not the same amount, there is a budget

A)error.
B)difference.
C)anomaly.
D)by-product.
Question
Top management's reaction to a difference between budgeted and actual sales often depends on

A)whether the difference is favorable or unfavorable.
B)whether management anticipated the difference.
C)the materiality of the difference.
D)the personality of the top managers.
Question
What is the primary difference between a static budget and a flexible budget?

A)The static budget contains only fixed costs, while the flexible budget contains only variable costs.
B)The static budget is prepared for a single level of activity, while a flexible budget is adjusted for different activity levels.
C)The static budget is constructed using input from only upper level management, while a flexible budget obtains input from all levels of management.
D)The static budget is prepared only for units produced, while a flexible budget reflects the number of units sold.
Question
In developing a flexible budget within a relevant range of activity,

A)only fixed costs are included.
B)it is necessary to relate variable cost data to the activity index chosen.
C)it is necessary to prepare a budget at 1,000 unit increments.
D)variable and fixed costs are combined and are reported as a total cost.
Question
The master budget of Windy Co.shows that the planned activity level for next year is expected to be 50,000 machine hours.At this level of activity, the following manufacturing overhead costs are expected:  Indirect labor $720,000 Machine supplies 180,000 Indirect materials 210,000 Depreciation on factory building 150,000 Total manufacturing overhead $1260,000\begin{array} { l r } \text { Indirect labor } & \$ 720,000 \\\text { Machine supplies } & 180,000 \\\text { Indirect materials } & 210,000 \\\text { Depreciation on factory building } & 150,000 \\\text { Total manufacturing overhead } & \$ 1260,000\end{array} A flexible budget for a level of activity of 60,000 machine hours would show total manufacturing overhead costs of

A)$1,482,000.
B)$1,260,000.
C)$1,512,000.
D)$1,362,000.
Question
A static budget is appropriate for

A)variable overhead costs.
B)direct materials costs.
C)fixed overhead costs.
D)None of these.
Question
Assume that actual sales results exceed the planned results for the second quarter.This favorable difference is greater than the unfavorable difference reported for the first quarter sales.Which of the following statements about the sales budget report on June 30 is true?

A)The year-to-date results will show a favorable difference.
B)The year-to-date results will show an unfavorable difference.
C)The difference for the first quarter can be ignored.
D)The sales report is not useful if it shows a favorable and unfavorable difference for the two quarters.
Question
A flexible budget can be prepared for which of the following budgets comprising the master budget?

A)Sales
B)Overhead
C)Direct materials
D)All of these.
Question
A static budget report

A)shows costs at only 2 or 3 different levels of activity.
B)is appropriate in evaluating a manager's effectiveness in controlling variable costs.
C)should be used when the actual level of activity is materially different from the master budget activity level.
D)may be appropriate in evaluating a manager's effectiveness in controlling costs when the behavior of the costs in response to changes in activity is fixed.
Question
What budgeted amounts appear on the flexible budget?

A)Original budgeted amounts at the static budget activity level
B)Actual costs for the budgeted activity level
C)Budgeted amounts for the actual activity level achieved
D)Actual costs for the estimated activity level
Question
A static budget is appropriate in evaluating a manager's performance if

A)actual activity closely approximates the master budget activity.
B)actual activity is less than the master budget activity.
C)the company prepares reports on an annual basis.
D)the company is a not-for-profit organization.
Question
Boland Manufacturing prepared a 2013 budget for 120,000 units of product.Actual production in 2013 was 130,000 units.To be most useful, what amounts should a performance report for this company compare?

A)The actual results for 130,000 units with the original budget for 120,000 units.
B)The actual results for 130,000 units with a new budget for 130,000 units.
C)The actual results for 130,000 units with last year's actual results for 134,000 units.
D)It doesn't matter.All of these choices are equally useful.
Question
If a company plans to sell 48,000 units of product but sells 60,000, the most appropriate comparison of the cost data associated with the sales will be by a budget based on

A)the original planned level of activity.
B)54,000 units of activity.
C)60,000 units of activity.
D)48,000 units of activity.
Question
The selection of levels of activity to depict a flexible budget
1. will be within the relevant range.
2. is largely a matter of expediency.
3. is governed by generally accepted accounting principles.

A)1
B)2
C)3
D)1 and 2
Question
Under management by exception, which differences between planned and actual results should be investigated?

A)Material and noncontrollable
B)Controllable and noncontrollable
C)Material and controllable
D)All differences should be investigated
Question
Sales results that are evaluated by a static budget might show
1. favorable differences that are not justified.
2. unfavorable differences that are not justified.

A)1
B)2
C)both 1 and 2.
D)neither 1 nor 2.
Question
Within the relevant range of activity, the behavior of total costs is assumed to be

A)linear and upward sloping.
B)linear and downward sloping.
C)curvilinear and upward sloping.
D)linear to a point and then level off.
Question
In the Goblette Manufacturing Company, indirect labor is budgeted for $108,000 and factory supervision is budgeted for $36,000 at normal capacity of 160,000 direct labor hours.If 180,000 direct labor hours are worked, flexible budget total for these costs is:

A)$144,000.
B)$162,000.
C)$157,500.
D)$148,500.
Question
A flexible budget depicted graphically

A)is identical to a CVP graph.
B)differs from a CVP graph in the way that fixed costs are shown.
C)differs from a CVP graph in the way that variable costs are shown.
D)differs from a CVP graph in that sales revenue is not shown.
Question
The activity index used in preparing the flexible budget

A)is prescribed by generally accepted accounting principles.
B)is only applicable to fixed manufacturing costs.
C)is the same for all departments.
D)should significantly influence the costs that are being budgeted.
Question
Stone Industries uses flexible budgets.At normal capacity of 16,000 units, budgeted manufacturing overhead is: $48,000 variable and $270,000 fixed.If Stone had actual overhead costs of $321,000 for 18,000 units produced, what is the difference between actual and budgeted costs?

A)$3,000 unfavorable
B)$3,000 favorable
C)$9,000 unfavorable
D)$12,000 favorable
Question
Smart Manufacturing budgeted costs for 50,000 linear feet of block are: Fixed manufacturing costs  $24,000 per month Variable manufacturing costs $16.00 per linear foot \begin{array}{ll}\text {Fixed manufacturing costs }&\text { \( \$ 24,000 \) per month }\\\text {Variable manufacturing costs }&\text {\( \$ 16.00 \) per linear foot }\\\end{array}
Smart installed 40,000 linear feet of block during March.How much is budgeted total manufacturing costs in March?

A)$640,000
B)$824,000
C)$800,000
D)$664,000
Question
A company's planned activity level for next year is expected to be 100,000 machine hours.At this level of activity, the company budgeted the following manufacturing overhead costs:  Variable  Fixed  Indirect materials $120,000 Depreciation $50,000 Indirect labor 160,000 Taxes 10,000 Factory supplies 20,000 Supervision 40,000\begin{array}{lrlr}\text { Variable }&&\text { Fixed }\\\hline \text { Indirect materials } & \$ 120,000 & \text { Depreciation } & \$ 50,000 \\\text { Indirect labor } & 160,000 & \text { Taxes } & 10,000 \\\text { Factory supplies } & 20,000 & \text { Supervision } & 40,000\end{array} A flexible budget prepared at the 90,000 machine hours level of activity would show total manufacturing overhead costs of

A)$270,000.
B)$360,000.
C)$370,000.
D)$300,000.
Question
A static budget is not appropriate in evaluating a manager's effectiveness if a company has

A)substantial fixed costs.
B)substantial variable costs.
C)planned activity levels that match actual activity levels.
D)no variable costs.
Question
Shane Industries prepared a fixed budget of 60,000 direct labor hours, with estimated overhead costs of $300,000 for variable overhead and $90,000 for fixed overhead.Shane then prepared a flexible budget at 57,000 labor hours.How much is total overhead costs at this level of activity?

A)$285,000
B)$375,000
C)$370,500
D)$390,000
Question
Best Shingle's budgeted manufacturing costs for 50,000 squares of shingles are: Fixed manufacturing costs $12,000manufacturing costs  $16.00 per square\begin{array}{ll}\text {Fixed manufacturing costs }&\$12,000 \\\text {manufacturing costs }&\text { \( \$ 16.00 \) per square} \\\end{array}
Best produced 40,000 squares of shingles during March.How much are budgeted total manufacturing costs in March?

A)$640,000
B)$812,000
C)$800,000
D)$652,000
Question
A company's planned activity level for next year is expected to be 100,000 machine hours.At this level of activity, the company budgeted the following manufacturing overhead costs:  Variable  Fixed  Indirect materials $140,000 Depreciation $60,000 Indirect labor 200,000 Taxes 10,000 Factory supplies 20,000 Supervision 50,000\begin{array}{lrlr}\text { Variable }&&\text { Fixed }\\\hline \text { Indirect materials } & \$ 140,000 & \text { Depreciation } & \$ 60,000 \\\text { Indirect labor } & 200,000 & \text { Taxes } & 10,000 \\\text { Factory supplies } & 20,000 & \text { Supervision } & 50,000\end{array} A flexible budget prepared at the 80,000 machine hours level of activity would show total manufacturing overhead costs of

A)$288,000.
B)$360,000.
C)$384,000.
D)$408,000.
Question
Management by exception

A)causes managers to be buried under voluminous paperwork.
B)means that all differences will be investigated.
C)means that only unfavorable differences will be investigated.
D)means that material differences will be investigated.
Question
Chambers, Inc.uses flexible budgets.At normal capacity of 16,000 units, budgeted manufacturing overhead is: $64,000 variable and $180,000 fixed.If Chambers had actual overhead costs of $250,000 for 18,000 units produced, what is the difference between actual and budgeted costs?

A)$2,000 unfavorable.
B)$2,000 favorable.
C)$6,000 unfavorable.
D)$8,000 favorable.
Question
For June, Gold Corp.estimated sales revenue at $600,000.It pays sales commissions that are 4% of sales.The sales manager's salary is $285,000, estimated shipping expenses total 1% of sales, and miscellaneous selling expenses are $15,000.How much are budgeted selling expenses for the month of July if sales are expected to be $540,000?

A)$42,000
B)$327,000
C)$27,000
D)$330,000
Question
Nikoto Steel Co.budgeted manufacturing costs for 50,000 tons of steel are: Fixed manufacturing costs $50,000 per month  Variable manufacturing costs $12.00 per ton of steel\begin{array}{ll}\text {Fixed manufacturing costs }&\text {\( \$ 50,000 \) per month }\\\text { Variable manufacturing costs}&\text { \( \$ 12.00 \) per ton of steel}\\\end{array}
Nikoto produced 40,000 tons of steel during March.How much is the flexible budget for total manufacturing costs for March?

A)$520,000
B)$650,000
C)$480,000
D)$530,000
Question
In the Dichter Co., indirect labor is budgeted for $72,000 and factory supervision is budgeted for $24,000 at normal capacity of 160,000 direct labor hours.If 180,000 direct labor hours are worked, flexible budget total for these costs is

A)$96,000.
B)$108,000.
C)$105,000.
D)$99,000.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/156
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Reporting and Analyzing Liabilities
1
The master budget is not used in the budgetary control process.
False
2
Flexible budgeting relies on the assumption that unit variable costs will remain constant within the relevant range of activity.
True
3
Budget reports comparing actual results with planned objectives should be prepared only once a year.
False
4
Policies regarding when a difference between actual and planned results should be investigated are generally more restrictive for noncontrollable items than for controllable items.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
5
Certain budget reports are prepared monthly, whereas others are prepared more frequently depending on the activities being monitored.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
6
A static budget is one that is geared to one level of activity.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
7
A master budget is most useful in evaluating a manager's performance in controlling costs.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
8
A flexible budget report will show both actual and budget cost based on the actual activity level achieved.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
9
A flexible budget is a series of static budgets at different levels of activities.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
10
A flexible budget is prepared before the master budget.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
11
A formula used in developing a flexible budget is: Total budgeted cost = fixed cost + (total variable cost per unit × activity level).
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
12
If actual results are different from planned results, the difference must always be investigated by management to achieve effective budgetary control.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
13
A static budget is most useful for evaluating a manager's performance in controlling variable costs.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
14
Total budgeted fixed costs appearing on a flexible budget will be the same amount as total fixed costs on the master budget.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
15
Flexible budgets are widely used in production and service departments.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
16
A flexible budget can be prepared for each of the types of budgets included in the master budget.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
17
The activity index used in preparing a flexible budget should not influence the variable costs that are being budgeted.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
18
A static budget is changed only when actual activity is different from the level of activity expected.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
19
Management by exception means that management will investigate areas where actual results differ from planned results if the items are material and controllable.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
20
A distinction should be made between controllable and noncontrollable costs when reporting information under responsibility accounting.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
21
Budget reports should be prepared

A)daily.
B)monthly.
C)weekly.
D)as frequently as needed.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
22
A static budget is an effective means to evaluate a manager's ability to control costs, regardless of the actual activity level.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
23
In a responsibility accounting reporting system, as one moves up each level of responsibility in an organization, the responsibility reports become more summarized and show less detailed information.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
24
Most direct fixed costs are not controllable by the profit center manager.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
25
Cost centers, profit centers, and investment centers can all be classified as responsibility centers.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
26
The terms controllable costs and noncontrollable costs are synonymous with variable costs and fixed costs, respectively.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
27
The denominator in the formula for calculating the return on investment includes operating and nonoperating assets.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
28
The formula for computing return on investment is controllable margin divided by average operating assets.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
29
Controllable margin is subtracted from controllable fixed costs to get net income for a profit center.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
30
Budget reports provide the feedback needed by management to see whether actual operations are on course.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
31
On the basis of the budget reports,

A)management analyzes differences between actual and planned results.
B)management may take corrective action.
C)management may modify the future plans.
D)All of these.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
32
The flexible budget report evaluates a manager's performance in two areas: (1) production and (2) costs.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
33
What is budgetary control?

A)Another name for a flexible budget
B)The degree to which the CFO controls the budget
C)The use of budgets in controlling operations
D)The process of providing information on budget differences to lower level managers
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
34
A major element in budgetary control is

A)the preparation of long-term plans.
B)the comparison of actual results with planned objectives.
C)the valuation of inventories.
D)approval of the budget by the stockholders.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
35
A cost center incurs costs and generates revenues and cost center managers are evaluated on the profitability of their centers.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
36
The purpose of the sales budget report is to

A)control selling expenses.
B)determine whether income objectives are being met.
C)determine whether sales goals are being met.
D)control sales commissions.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
37
The terms "direct fixed costs" and "indirect fixed costs" are synonymous with "traceable costs" and "common costs," respectively.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
38
The purpose of the departmental overhead cost report is to

A)control indirect labor costs.
B)control selling expense.
C)determine the efficient use of materials.
D)control overhead costs.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
39
The manager of an investment center can improve ROI by reducing average operating assets.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
40
More costs become controllable as one moves down to each lower level of managerial responsibility.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
41
The flexible budget

A)is prepared before the master budget.
B)is relevant both within and outside the relevant range.
C)eliminates the need for a master budget.
D)is a series of static budgets at different levels of activity.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
42
A department has budgeted monthly manufacturing overhead cost of $540,000 plus $3 per direct labor hour.If a flexible budget report reflects $1,044,000 for total budgeted manufacturing cost for the month, the actual level of activity achieved during the month was

A)528,000 direct labor hours.
B)168,000 direct labor hours.
C)348,000 direct labor hours.
D)Cannot be determined from the information provided.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
43
A flexible budget

A)is prepared when management cannot agree on objectives for the company.
B)projects budget data for various levels of activity.
C)is only useful in controlling fixed costs.
D)cannot be used for evaluation purposes because budgeted data are adjusted to reflect actual results.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
44
The comparison of differences between actual and planned results

A)is done by the external auditors.
B)appears on the company's external financial statements.
C)is usually done orally in departmental meetings.
D)appears on periodic budget reports.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
45
Another name for the static budget is

A)master budget.
B)overhead budget.
C)permanent budget.
D)flexible budget.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
46
Which one of the following would be the same total amount on a flexible budget and a static budget if the activity level is different for the two types of budgets?

A)Direct materials cost
B)Direct labor cost
C)Variable manufacturing overhead
D)Fixed manufacturing overhead
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
47
If costs are not responsive to changes in activity level, then these costs can be best described as

A)mixed.
B)flexible.
C)variable.
D)fixed.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
48
A static budget

A)should not be prepared in a company.
B)is useful in evaluating a manager's performance by comparing actual variable costs and planned variable costs.
C)shows planned results at the original budgeted activity level.
D)is changed only if the actual level of activity is different than originally budgeted.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
49
When budgeted and actual results are not the same amount, there is a budget

A)error.
B)difference.
C)anomaly.
D)by-product.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
50
Top management's reaction to a difference between budgeted and actual sales often depends on

A)whether the difference is favorable or unfavorable.
B)whether management anticipated the difference.
C)the materiality of the difference.
D)the personality of the top managers.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
51
What is the primary difference between a static budget and a flexible budget?

A)The static budget contains only fixed costs, while the flexible budget contains only variable costs.
B)The static budget is prepared for a single level of activity, while a flexible budget is adjusted for different activity levels.
C)The static budget is constructed using input from only upper level management, while a flexible budget obtains input from all levels of management.
D)The static budget is prepared only for units produced, while a flexible budget reflects the number of units sold.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
52
In developing a flexible budget within a relevant range of activity,

A)only fixed costs are included.
B)it is necessary to relate variable cost data to the activity index chosen.
C)it is necessary to prepare a budget at 1,000 unit increments.
D)variable and fixed costs are combined and are reported as a total cost.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
53
The master budget of Windy Co.shows that the planned activity level for next year is expected to be 50,000 machine hours.At this level of activity, the following manufacturing overhead costs are expected:  Indirect labor $720,000 Machine supplies 180,000 Indirect materials 210,000 Depreciation on factory building 150,000 Total manufacturing overhead $1260,000\begin{array} { l r } \text { Indirect labor } & \$ 720,000 \\\text { Machine supplies } & 180,000 \\\text { Indirect materials } & 210,000 \\\text { Depreciation on factory building } & 150,000 \\\text { Total manufacturing overhead } & \$ 1260,000\end{array} A flexible budget for a level of activity of 60,000 machine hours would show total manufacturing overhead costs of

A)$1,482,000.
B)$1,260,000.
C)$1,512,000.
D)$1,362,000.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
54
A static budget is appropriate for

A)variable overhead costs.
B)direct materials costs.
C)fixed overhead costs.
D)None of these.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
55
Assume that actual sales results exceed the planned results for the second quarter.This favorable difference is greater than the unfavorable difference reported for the first quarter sales.Which of the following statements about the sales budget report on June 30 is true?

A)The year-to-date results will show a favorable difference.
B)The year-to-date results will show an unfavorable difference.
C)The difference for the first quarter can be ignored.
D)The sales report is not useful if it shows a favorable and unfavorable difference for the two quarters.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
56
A flexible budget can be prepared for which of the following budgets comprising the master budget?

A)Sales
B)Overhead
C)Direct materials
D)All of these.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
57
A static budget report

A)shows costs at only 2 or 3 different levels of activity.
B)is appropriate in evaluating a manager's effectiveness in controlling variable costs.
C)should be used when the actual level of activity is materially different from the master budget activity level.
D)may be appropriate in evaluating a manager's effectiveness in controlling costs when the behavior of the costs in response to changes in activity is fixed.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
58
What budgeted amounts appear on the flexible budget?

A)Original budgeted amounts at the static budget activity level
B)Actual costs for the budgeted activity level
C)Budgeted amounts for the actual activity level achieved
D)Actual costs for the estimated activity level
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
59
A static budget is appropriate in evaluating a manager's performance if

A)actual activity closely approximates the master budget activity.
B)actual activity is less than the master budget activity.
C)the company prepares reports on an annual basis.
D)the company is a not-for-profit organization.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
60
Boland Manufacturing prepared a 2013 budget for 120,000 units of product.Actual production in 2013 was 130,000 units.To be most useful, what amounts should a performance report for this company compare?

A)The actual results for 130,000 units with the original budget for 120,000 units.
B)The actual results for 130,000 units with a new budget for 130,000 units.
C)The actual results for 130,000 units with last year's actual results for 134,000 units.
D)It doesn't matter.All of these choices are equally useful.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
61
If a company plans to sell 48,000 units of product but sells 60,000, the most appropriate comparison of the cost data associated with the sales will be by a budget based on

A)the original planned level of activity.
B)54,000 units of activity.
C)60,000 units of activity.
D)48,000 units of activity.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
62
The selection of levels of activity to depict a flexible budget
1. will be within the relevant range.
2. is largely a matter of expediency.
3. is governed by generally accepted accounting principles.

A)1
B)2
C)3
D)1 and 2
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
63
Under management by exception, which differences between planned and actual results should be investigated?

A)Material and noncontrollable
B)Controllable and noncontrollable
C)Material and controllable
D)All differences should be investigated
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
64
Sales results that are evaluated by a static budget might show
1. favorable differences that are not justified.
2. unfavorable differences that are not justified.

A)1
B)2
C)both 1 and 2.
D)neither 1 nor 2.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
65
Within the relevant range of activity, the behavior of total costs is assumed to be

A)linear and upward sloping.
B)linear and downward sloping.
C)curvilinear and upward sloping.
D)linear to a point and then level off.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
66
In the Goblette Manufacturing Company, indirect labor is budgeted for $108,000 and factory supervision is budgeted for $36,000 at normal capacity of 160,000 direct labor hours.If 180,000 direct labor hours are worked, flexible budget total for these costs is:

A)$144,000.
B)$162,000.
C)$157,500.
D)$148,500.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
67
A flexible budget depicted graphically

A)is identical to a CVP graph.
B)differs from a CVP graph in the way that fixed costs are shown.
C)differs from a CVP graph in the way that variable costs are shown.
D)differs from a CVP graph in that sales revenue is not shown.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
68
The activity index used in preparing the flexible budget

A)is prescribed by generally accepted accounting principles.
B)is only applicable to fixed manufacturing costs.
C)is the same for all departments.
D)should significantly influence the costs that are being budgeted.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
69
Stone Industries uses flexible budgets.At normal capacity of 16,000 units, budgeted manufacturing overhead is: $48,000 variable and $270,000 fixed.If Stone had actual overhead costs of $321,000 for 18,000 units produced, what is the difference between actual and budgeted costs?

A)$3,000 unfavorable
B)$3,000 favorable
C)$9,000 unfavorable
D)$12,000 favorable
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
70
Smart Manufacturing budgeted costs for 50,000 linear feet of block are: Fixed manufacturing costs  $24,000 per month Variable manufacturing costs $16.00 per linear foot \begin{array}{ll}\text {Fixed manufacturing costs }&\text { \( \$ 24,000 \) per month }\\\text {Variable manufacturing costs }&\text {\( \$ 16.00 \) per linear foot }\\\end{array}
Smart installed 40,000 linear feet of block during March.How much is budgeted total manufacturing costs in March?

A)$640,000
B)$824,000
C)$800,000
D)$664,000
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
71
A company's planned activity level for next year is expected to be 100,000 machine hours.At this level of activity, the company budgeted the following manufacturing overhead costs:  Variable  Fixed  Indirect materials $120,000 Depreciation $50,000 Indirect labor 160,000 Taxes 10,000 Factory supplies 20,000 Supervision 40,000\begin{array}{lrlr}\text { Variable }&&\text { Fixed }\\\hline \text { Indirect materials } & \$ 120,000 & \text { Depreciation } & \$ 50,000 \\\text { Indirect labor } & 160,000 & \text { Taxes } & 10,000 \\\text { Factory supplies } & 20,000 & \text { Supervision } & 40,000\end{array} A flexible budget prepared at the 90,000 machine hours level of activity would show total manufacturing overhead costs of

A)$270,000.
B)$360,000.
C)$370,000.
D)$300,000.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
72
A static budget is not appropriate in evaluating a manager's effectiveness if a company has

A)substantial fixed costs.
B)substantial variable costs.
C)planned activity levels that match actual activity levels.
D)no variable costs.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
73
Shane Industries prepared a fixed budget of 60,000 direct labor hours, with estimated overhead costs of $300,000 for variable overhead and $90,000 for fixed overhead.Shane then prepared a flexible budget at 57,000 labor hours.How much is total overhead costs at this level of activity?

A)$285,000
B)$375,000
C)$370,500
D)$390,000
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
74
Best Shingle's budgeted manufacturing costs for 50,000 squares of shingles are: Fixed manufacturing costs $12,000manufacturing costs  $16.00 per square\begin{array}{ll}\text {Fixed manufacturing costs }&\$12,000 \\\text {manufacturing costs }&\text { \( \$ 16.00 \) per square} \\\end{array}
Best produced 40,000 squares of shingles during March.How much are budgeted total manufacturing costs in March?

A)$640,000
B)$812,000
C)$800,000
D)$652,000
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
75
A company's planned activity level for next year is expected to be 100,000 machine hours.At this level of activity, the company budgeted the following manufacturing overhead costs:  Variable  Fixed  Indirect materials $140,000 Depreciation $60,000 Indirect labor 200,000 Taxes 10,000 Factory supplies 20,000 Supervision 50,000\begin{array}{lrlr}\text { Variable }&&\text { Fixed }\\\hline \text { Indirect materials } & \$ 140,000 & \text { Depreciation } & \$ 60,000 \\\text { Indirect labor } & 200,000 & \text { Taxes } & 10,000 \\\text { Factory supplies } & 20,000 & \text { Supervision } & 50,000\end{array} A flexible budget prepared at the 80,000 machine hours level of activity would show total manufacturing overhead costs of

A)$288,000.
B)$360,000.
C)$384,000.
D)$408,000.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
76
Management by exception

A)causes managers to be buried under voluminous paperwork.
B)means that all differences will be investigated.
C)means that only unfavorable differences will be investigated.
D)means that material differences will be investigated.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
77
Chambers, Inc.uses flexible budgets.At normal capacity of 16,000 units, budgeted manufacturing overhead is: $64,000 variable and $180,000 fixed.If Chambers had actual overhead costs of $250,000 for 18,000 units produced, what is the difference between actual and budgeted costs?

A)$2,000 unfavorable.
B)$2,000 favorable.
C)$6,000 unfavorable.
D)$8,000 favorable.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
78
For June, Gold Corp.estimated sales revenue at $600,000.It pays sales commissions that are 4% of sales.The sales manager's salary is $285,000, estimated shipping expenses total 1% of sales, and miscellaneous selling expenses are $15,000.How much are budgeted selling expenses for the month of July if sales are expected to be $540,000?

A)$42,000
B)$327,000
C)$27,000
D)$330,000
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
79
Nikoto Steel Co.budgeted manufacturing costs for 50,000 tons of steel are: Fixed manufacturing costs $50,000 per month  Variable manufacturing costs $12.00 per ton of steel\begin{array}{ll}\text {Fixed manufacturing costs }&\text {\( \$ 50,000 \) per month }\\\text { Variable manufacturing costs}&\text { \( \$ 12.00 \) per ton of steel}\\\end{array}
Nikoto produced 40,000 tons of steel during March.How much is the flexible budget for total manufacturing costs for March?

A)$520,000
B)$650,000
C)$480,000
D)$530,000
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
80
In the Dichter Co., indirect labor is budgeted for $72,000 and factory supervision is budgeted for $24,000 at normal capacity of 160,000 direct labor hours.If 180,000 direct labor hours are worked, flexible budget total for these costs is

A)$96,000.
B)$108,000.
C)$105,000.
D)$99,000.
Unlock Deck
Unlock for access to all 156 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 156 flashcards in this deck.