Deck 8: Flexible Budgets and Variance Analysis

Full screen (f)
exit full mode
Question
The static budget variance is the variance of actual results from the static budget.
Use Space or
up arrow
down arrow
to flip the card.
Question
Efficiency is the degree to which a goal, objective, or target is met.
Question
If actual expenses are less than expected expenses, the expense variance in the performance report will be unfavorable.
Question
The reasons that actual results differ from the master budget are independent of one another.
Question
By using a flexible budget, changes in activity level cannot cause any variances between the flexible budget and actual results.
Question
A favorable expense variance is when budgeted expenses are less than actual expenses.
Question
A flexible budget adjusts for changes in sales volume and other cost-driver activities.
Question
A static budget has multiple levels of activity.
Question
A static budget is prepared for a fixed level of activity.
Question
A flexible budget is different from a variable budget.
Question
Standard cost systems value products according to actual costs.
Question
The unfavorable variances resulting from ideal standards are intended to constantly remind personnel of the continuous need for improvement.
Question
Total static-budget variances = activity-level variances + flexible-budget variances.
Question
By using a static budget, changes in activity level cannot cause any variances between the flexible budget and actual results.
Question
As the terms are used in the budgeting process, it is possible for a company to be efficient at the same time it is ineffective.
Question
Currently attainable standards are levels of performance that can be achieved, although their achievement is unlikely.
Question
Performance report is a generic term that usually means a comparison of actual results with some budget.
Question
If the total sales-activity variance and the static-budget variance are equal to each other, there is no flexible-budget variance.
Question
The flexible budget is identical to the master budget in format.
Question
An activity-based budget is based on budgeted costs for every activity and related cost driver.
Question
Ideal standards have an adverse effect on employee motivation.
Question
A favorable direct-labor quantity variance may lead to an unfavorable direct-labor price variance.
Question
The quantity and efficiency variances are different.
Question
Perfection standards and ideal standards are different.
Question
Materials price variance = actual price - standard price) x standard quantity allowed.
Question
Sales-activity variances measure how efficient managers have been in meeting the planned sales objective.
Question
An expected cost is the cost that is least likely to be attained.
Question
A favorable materials price variance may lead to an unfavorable materials usage variance.
Question
Currently attainable standards do not make allowances for spoilage and waste.
Question
Ideal standards make no provisions for waste, spoilage, and machine breakdowns.
Question
Direct-labor quantity variance = actual quantity used - standard quantity allowed) x actual price.
Question
One cause of a flexible?budget variance might be a difference between expected and actual hourly wages for factory workers.
Question
The total flexible?budget variance can be broken down into a price variance and an effectiveness variance.
Question
A quantity variance measures actual deviations from the quantity of inputs that should have been used to achieve the actual output quantity.
Question
Favorable variances do not require investigation.
Question
Using standard costs is popular with companies in the United States.
Question
One of the first questions a manager should consider when explaining a large variance is whether expectations were valid.
Question
Variances are signals that actual operations are different from what was anticipated.
Question
In most companies, variances are investigated only if they exceed a minimum dollar or percentage deviation from budgeted amounts.
Question
Favorable flexible-budget variances are good.
Question
The variable-overhead spending variance is the difference between the actual variable overhead and the amount of variable overhead budgeted for the actual level of cost-driver activity.
Question
Flat Company currently produces cardboard boxes in an automated process.Expected produc?tion per month is 40,000 units.The required direct materials cost $0.30 per unit.Manufacturing fixed overhead costs are $24,000 per month.Manufacturing overhead is allocated based on units of production.____ is the flexible budget for 40,000 and 20,000 units, respectively.

A)$26,000 and $20,000
B)$36,000 and $30,000
C)$40,000 and $34,000
D)$44,000 and $38,000
Question
John Company's master budget sales were $225,000.Actual sales were $220,000. Sales in the prior year were $219,000.The static-budget variance for sales was _____.

A)$5,000 favorable
B)$5,000 unfavorable
C)$6,000 favorable
D)$6,000 unfavorable
Question
A budget that is often changed at the end of a reporting period is called a _____budget.

A)balanced
B)cost
C)flexible
D)trial balance
Question
A variance is the difference between _____.

A)a budgeted amount and a benchmark amount
B)the required number of inputs for the number of outputs
C)an actual result and a budgeted amount
D)a budgeted amount and a stan?dard amount
Question
An example of a favorable variance is _____.

A)actual revenues are less than expected
B)actual expenses are less than expected
C)material prices are greater than expected
D)expected labor costs are less than actual costs
Question
Farm Bureau Insurance Company had a static budgeted operating income of $8.6 million; however, actual income was $6.4 million._____ is the static-budget variance of operating income.

A)$6.4 million favorable
B)$8.6 million unfavorable
C)$2.2 million favorable
D)$2.2 million unfavorable
Question
Most organizations believe that it is not worthwhile to monitor individual overhead to the same extent as labor and material variances.
Question
The labor flexible-budget variance equals the labor price variance plus the labor quantity variance.
Question
_____ compares actual results with budget.

A)Performance report
B)Variance
C)Sensitivity analysis
D)Dynamic analysis
Question
The Foot Company currently produces sandals in an automated process.Expected produc?tion per month is 20,000 units.The required direct materials cost $1.50 per unit.Manufacturing fixed overhead costs are $45,000 per month.Manufacturing overhead is allocated based on units of production._____ is the budgeted manufacturing fixed overhead rate.

A)$.50 per unit
B)$1.50 per unit
C)$2.25 per unit
D)None of these answers is correct
Question
Differences between the static budget and the flexible budget are due to _____.

A)problems of cost control
B)poor usage of material and labor
C)a combination of price and material variances
D)actual activity differing from expected activity levels
Question
A static budget is another name for the _____budget.

A)financial
B)operating
C)strategic
D)master
Question
Price variances reflect the organization's efficiency at actual levels of activity.
Question
_____ probably would not be used as a measure of activity in a flexible budget.

A)Sales volume
B)Number of direct labor hours worked
C)Number of machine hours used
D)Number of hours worked by salespeople
Question
The overhead efficiency variance indicates to management how much overhead cost it may waste by not controlling the use of cost-driver activity.
Question
The type of budget that serves as the original benchmark for evaluating performance is called a _____ budget.

A)balanced
B)cost
C)flexible
D)static
Question
Which of the following statements is false?

A)Flexible budgets help provide a basis for management by exception.
B)Flexible budgets are not based on the same revenue and cost behavior assumptions as the static budget.
C)Flexible budgets are prepared for a range of activity.
D)Flexible budgets are automatically matched to changes in activity levels.
Question
If the actual level of sales significantly exceeds the sales in the static budget, the variances associated with the variable costs will probably be _____.

A)favorable
B)unfavorable
C)zero
D)undeterminable
Question
Flat Company currently produces cardboard boxes in an automated process.Expected produc?tion per month is 50,000 units.The required direct materials cost is $0.30 per unit.Manufacturing fixed overhead costs are $25,000 per month.Manufacturing overhead is allocated based on units of production._____ is the budgeted manufacturing fixed overhead rate.

A)$2.08 per unit
B)$0.30 per unit
C)$0.50 per unit
D)None of these answers is correct
Question
Actual results might differ from the static budget because _____.

A)sales and other cost-driver activities were not the same as originally forecasted
B)revenues or variable costs per unit of activity were not as expected
C)fixed costs per period were not as expected
D)all of these answers are correct
Question
Bond Company's depreciation cost is $63,000 when production is 21,000 units. _____ are the total depreciation expenses for 15,000 and 20,000 units, respectively.

A)$45,000 and $60,000
B)$60,000 and $45,000
C)$63,000 and $63,000
D)None of these answers is correct
Question
White Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $12 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the static budget amount for processing.

A)$207,000
B)$213,500
C)$222,000
D)$225,000
Question
Hut Company's variable selling and administrative cost is $48,000 when production is 6,000 units._____ are the variable selling and administrative expenses for 7,000 and 8,000 units, respectively.

A)$48,000 and $48,000
B)$56,000 and $64,000
C)$64,000 and $56,000
D)None of these answers is correct
Question
Loopy Company had the following information: At a manufacturing level of 5,000 units, variable and fixed manufacturing costs are $30 and $10 per unit, respectively.Selling price is $60 per unit._____ is the total manufacturing cost for 15,000 units.

A)$450,000
B)$500,000
C)$570,000
D)$900,000
Question
Pink Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 21,000 machine hours.Actual processing cost was $222,000._____ is the flexible budget amount for processing.

A)$188,000
B)$213,500
C)$222,000
D)$235,500
Question
Activity-level variances plus flexible-budget variances equals _____.

A)total static-budget variances
B)total standard variances
C)total actual variances
D)none of these answers is correct
Question
Roger Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the activity-level variance for processing.

A)$39,000 favorable
B)$39,000 unfavorable
C)$42,000 favorable
D)$42,000 unfavorable
Question
Ben Company planned to produce 12,000 units.This level of activities required 20 set-ups at a cost of $18,000 plus $500 per set-up.Actual sales were 10,000 units, requiring 15 set-ups and 12,000 machine hours.Actual set-up cost was $26,000._____ is the static budget-variance for set-ups.

A)$2,500 favorable
B)$2,500 unfavorable
C)$2,000 favorable
D)$2,000 unfavorable
Question
Purple Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the flexible-budget variance for processing.

A)$3,000 favorable
B)$39,000 unfavorable
C)$3,000 unfavorable
D)None of these answers is correct
Question
Peppy Company planned to produce 12,000 units.This level of activities required 20 set-ups at a cost of $22,000 plus $500 per set-up.Actual sales were 10,000 units, requiring 15 set-ups and 12,000 machine hours.Actual set-up cost was $26,000._____ is the flexible budget amount for set-ups.

A)$26,000
B)$22,000
C)$29,500
D)$7,500
Question
The Foot Company currently produces sandals in an automated process. Expected produc?tion per month is 20,000 units.The required direct materials cost is $1.50 per unit.Manufacturing fixed overhead costs are $30,000 per month.Manufac?turing overhead is allocated based on units of production._____ is the flexible budget for 15,000 and 20,000 units, respectively.

A)$22,500 and $30,000
B)$52,500 and $60,000
C)$45,000 and $60,000
D)$88,000 and $76,000
Question
Effectiveness is indicated by _____.

A)sales-activity variances
B)static-budget variances
C)flexible-budget variances
D)all of these answers are correct
Question
Black Company planned to produce and sell 900 units at a total cost of $180,000.Actual production was 900 units at a cost of $170,000, Black Company was _____.

A)efficient
B)inefficient
C)effective
D)ineffective
Question
Efficiency is indicated by _____.

A)sales-activity variances
B)static-budget variances
C)flexible-budget variances
D)all of these answers are correct
Question
Blue Company planned to sell 35,000 units.Actual sales were 30,000 units. Based on this information, Blue Company was _____.

A)efficient
B)inefficient
C)effective
D)ineffective
Question
Pizza Company planned to produce 12,000 units.This level of activities required 40 set-ups at a cost of $18,000 plus $500 per set-up.Actual sales were 10,000 units, requiring 15 set-ups and 12,000 machine hours.Actual set-up cost was $26,000._____ is the static budget amount for set-ups.

A)$26,000
B)$38,000
C)$21,000
D)$25,500
Question
Loopy Company had the following information: At a manufacturing level of 5,000 units, variable and fixed manufacturing costs are $32 and $20 per unit, respectively.Selling price is $70 per unit._____ is the total manufacturing cost for 10,000 units.

A)$250,000
B)$700,000
C)$420,000
D)None of these answers is correct
Question
Green Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the static-budget variance for processing.

A)$39,000 favorable
B)$39,000 unfavorable
C)$42,000 favorable
D)$42,000 unfavorable
Question
Seinfeld Company planned to produce 12,000 units.This level of activities required 20 set-ups at a cost of $18,000 plus $500 per set-up.Actual sales were 10,000 units, requiring 15 set-ups and 12,000 machine hours.Actual set-up cost was $26,000._____ is the flexible-budget variance for set-ups.

A)$2,000 favorable
B)$2,000 unfavorable
C)$500 favorable
D)$500 unfavorable
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/153
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Flexible Budgets and Variance Analysis
1
The static budget variance is the variance of actual results from the static budget.
True
2
Efficiency is the degree to which a goal, objective, or target is met.
False
3
If actual expenses are less than expected expenses, the expense variance in the performance report will be unfavorable.
False
4
The reasons that actual results differ from the master budget are independent of one another.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
5
By using a flexible budget, changes in activity level cannot cause any variances between the flexible budget and actual results.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
6
A favorable expense variance is when budgeted expenses are less than actual expenses.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
7
A flexible budget adjusts for changes in sales volume and other cost-driver activities.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
8
A static budget has multiple levels of activity.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
9
A static budget is prepared for a fixed level of activity.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
10
A flexible budget is different from a variable budget.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
11
Standard cost systems value products according to actual costs.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
12
The unfavorable variances resulting from ideal standards are intended to constantly remind personnel of the continuous need for improvement.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
13
Total static-budget variances = activity-level variances + flexible-budget variances.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
14
By using a static budget, changes in activity level cannot cause any variances between the flexible budget and actual results.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
15
As the terms are used in the budgeting process, it is possible for a company to be efficient at the same time it is ineffective.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
16
Currently attainable standards are levels of performance that can be achieved, although their achievement is unlikely.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
17
Performance report is a generic term that usually means a comparison of actual results with some budget.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
18
If the total sales-activity variance and the static-budget variance are equal to each other, there is no flexible-budget variance.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
19
The flexible budget is identical to the master budget in format.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
20
An activity-based budget is based on budgeted costs for every activity and related cost driver.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
21
Ideal standards have an adverse effect on employee motivation.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
22
A favorable direct-labor quantity variance may lead to an unfavorable direct-labor price variance.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
23
The quantity and efficiency variances are different.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
24
Perfection standards and ideal standards are different.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
25
Materials price variance = actual price - standard price) x standard quantity allowed.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
26
Sales-activity variances measure how efficient managers have been in meeting the planned sales objective.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
27
An expected cost is the cost that is least likely to be attained.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
28
A favorable materials price variance may lead to an unfavorable materials usage variance.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
29
Currently attainable standards do not make allowances for spoilage and waste.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
30
Ideal standards make no provisions for waste, spoilage, and machine breakdowns.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
31
Direct-labor quantity variance = actual quantity used - standard quantity allowed) x actual price.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
32
One cause of a flexible?budget variance might be a difference between expected and actual hourly wages for factory workers.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
33
The total flexible?budget variance can be broken down into a price variance and an effectiveness variance.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
34
A quantity variance measures actual deviations from the quantity of inputs that should have been used to achieve the actual output quantity.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
35
Favorable variances do not require investigation.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
36
Using standard costs is popular with companies in the United States.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
37
One of the first questions a manager should consider when explaining a large variance is whether expectations were valid.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
38
Variances are signals that actual operations are different from what was anticipated.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
39
In most companies, variances are investigated only if they exceed a minimum dollar or percentage deviation from budgeted amounts.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
40
Favorable flexible-budget variances are good.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
41
The variable-overhead spending variance is the difference between the actual variable overhead and the amount of variable overhead budgeted for the actual level of cost-driver activity.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
42
Flat Company currently produces cardboard boxes in an automated process.Expected produc?tion per month is 40,000 units.The required direct materials cost $0.30 per unit.Manufacturing fixed overhead costs are $24,000 per month.Manufacturing overhead is allocated based on units of production.____ is the flexible budget for 40,000 and 20,000 units, respectively.

A)$26,000 and $20,000
B)$36,000 and $30,000
C)$40,000 and $34,000
D)$44,000 and $38,000
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
43
John Company's master budget sales were $225,000.Actual sales were $220,000. Sales in the prior year were $219,000.The static-budget variance for sales was _____.

A)$5,000 favorable
B)$5,000 unfavorable
C)$6,000 favorable
D)$6,000 unfavorable
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
44
A budget that is often changed at the end of a reporting period is called a _____budget.

A)balanced
B)cost
C)flexible
D)trial balance
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
45
A variance is the difference between _____.

A)a budgeted amount and a benchmark amount
B)the required number of inputs for the number of outputs
C)an actual result and a budgeted amount
D)a budgeted amount and a stan?dard amount
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
46
An example of a favorable variance is _____.

A)actual revenues are less than expected
B)actual expenses are less than expected
C)material prices are greater than expected
D)expected labor costs are less than actual costs
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
47
Farm Bureau Insurance Company had a static budgeted operating income of $8.6 million; however, actual income was $6.4 million._____ is the static-budget variance of operating income.

A)$6.4 million favorable
B)$8.6 million unfavorable
C)$2.2 million favorable
D)$2.2 million unfavorable
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
48
Most organizations believe that it is not worthwhile to monitor individual overhead to the same extent as labor and material variances.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
49
The labor flexible-budget variance equals the labor price variance plus the labor quantity variance.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
50
_____ compares actual results with budget.

A)Performance report
B)Variance
C)Sensitivity analysis
D)Dynamic analysis
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
51
The Foot Company currently produces sandals in an automated process.Expected produc?tion per month is 20,000 units.The required direct materials cost $1.50 per unit.Manufacturing fixed overhead costs are $45,000 per month.Manufacturing overhead is allocated based on units of production._____ is the budgeted manufacturing fixed overhead rate.

A)$.50 per unit
B)$1.50 per unit
C)$2.25 per unit
D)None of these answers is correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
52
Differences between the static budget and the flexible budget are due to _____.

A)problems of cost control
B)poor usage of material and labor
C)a combination of price and material variances
D)actual activity differing from expected activity levels
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
53
A static budget is another name for the _____budget.

A)financial
B)operating
C)strategic
D)master
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
54
Price variances reflect the organization's efficiency at actual levels of activity.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
55
_____ probably would not be used as a measure of activity in a flexible budget.

A)Sales volume
B)Number of direct labor hours worked
C)Number of machine hours used
D)Number of hours worked by salespeople
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
56
The overhead efficiency variance indicates to management how much overhead cost it may waste by not controlling the use of cost-driver activity.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
57
The type of budget that serves as the original benchmark for evaluating performance is called a _____ budget.

A)balanced
B)cost
C)flexible
D)static
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following statements is false?

A)Flexible budgets help provide a basis for management by exception.
B)Flexible budgets are not based on the same revenue and cost behavior assumptions as the static budget.
C)Flexible budgets are prepared for a range of activity.
D)Flexible budgets are automatically matched to changes in activity levels.
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
59
If the actual level of sales significantly exceeds the sales in the static budget, the variances associated with the variable costs will probably be _____.

A)favorable
B)unfavorable
C)zero
D)undeterminable
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
60
Flat Company currently produces cardboard boxes in an automated process.Expected produc?tion per month is 50,000 units.The required direct materials cost is $0.30 per unit.Manufacturing fixed overhead costs are $25,000 per month.Manufacturing overhead is allocated based on units of production._____ is the budgeted manufacturing fixed overhead rate.

A)$2.08 per unit
B)$0.30 per unit
C)$0.50 per unit
D)None of these answers is correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
61
Actual results might differ from the static budget because _____.

A)sales and other cost-driver activities were not the same as originally forecasted
B)revenues or variable costs per unit of activity were not as expected
C)fixed costs per period were not as expected
D)all of these answers are correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
62
Bond Company's depreciation cost is $63,000 when production is 21,000 units. _____ are the total depreciation expenses for 15,000 and 20,000 units, respectively.

A)$45,000 and $60,000
B)$60,000 and $45,000
C)$63,000 and $63,000
D)None of these answers is correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
63
White Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $12 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the static budget amount for processing.

A)$207,000
B)$213,500
C)$222,000
D)$225,000
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
64
Hut Company's variable selling and administrative cost is $48,000 when production is 6,000 units._____ are the variable selling and administrative expenses for 7,000 and 8,000 units, respectively.

A)$48,000 and $48,000
B)$56,000 and $64,000
C)$64,000 and $56,000
D)None of these answers is correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
65
Loopy Company had the following information: At a manufacturing level of 5,000 units, variable and fixed manufacturing costs are $30 and $10 per unit, respectively.Selling price is $60 per unit._____ is the total manufacturing cost for 15,000 units.

A)$450,000
B)$500,000
C)$570,000
D)$900,000
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
66
Pink Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 21,000 machine hours.Actual processing cost was $222,000._____ is the flexible budget amount for processing.

A)$188,000
B)$213,500
C)$222,000
D)$235,500
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
67
Activity-level variances plus flexible-budget variances equals _____.

A)total static-budget variances
B)total standard variances
C)total actual variances
D)none of these answers is correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
68
Roger Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the activity-level variance for processing.

A)$39,000 favorable
B)$39,000 unfavorable
C)$42,000 favorable
D)$42,000 unfavorable
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
69
Ben Company planned to produce 12,000 units.This level of activities required 20 set-ups at a cost of $18,000 plus $500 per set-up.Actual sales were 10,000 units, requiring 15 set-ups and 12,000 machine hours.Actual set-up cost was $26,000._____ is the static budget-variance for set-ups.

A)$2,500 favorable
B)$2,500 unfavorable
C)$2,000 favorable
D)$2,000 unfavorable
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
70
Purple Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the flexible-budget variance for processing.

A)$3,000 favorable
B)$39,000 unfavorable
C)$3,000 unfavorable
D)None of these answers is correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
71
Peppy Company planned to produce 12,000 units.This level of activities required 20 set-ups at a cost of $22,000 plus $500 per set-up.Actual sales were 10,000 units, requiring 15 set-ups and 12,000 machine hours.Actual set-up cost was $26,000._____ is the flexible budget amount for set-ups.

A)$26,000
B)$22,000
C)$29,500
D)$7,500
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
72
The Foot Company currently produces sandals in an automated process. Expected produc?tion per month is 20,000 units.The required direct materials cost is $1.50 per unit.Manufacturing fixed overhead costs are $30,000 per month.Manufac?turing overhead is allocated based on units of production._____ is the flexible budget for 15,000 and 20,000 units, respectively.

A)$22,500 and $30,000
B)$52,500 and $60,000
C)$45,000 and $60,000
D)$88,000 and $76,000
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
73
Effectiveness is indicated by _____.

A)sales-activity variances
B)static-budget variances
C)flexible-budget variances
D)all of these answers are correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
74
Black Company planned to produce and sell 900 units at a total cost of $180,000.Actual production was 900 units at a cost of $170,000, Black Company was _____.

A)efficient
B)inefficient
C)effective
D)ineffective
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
75
Efficiency is indicated by _____.

A)sales-activity variances
B)static-budget variances
C)flexible-budget variances
D)all of these answers are correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
76
Blue Company planned to sell 35,000 units.Actual sales were 30,000 units. Based on this information, Blue Company was _____.

A)efficient
B)inefficient
C)effective
D)ineffective
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
77
Pizza Company planned to produce 12,000 units.This level of activities required 40 set-ups at a cost of $18,000 plus $500 per set-up.Actual sales were 10,000 units, requiring 15 set-ups and 12,000 machine hours.Actual set-up cost was $26,000._____ is the static budget amount for set-ups.

A)$26,000
B)$38,000
C)$21,000
D)$25,500
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
78
Loopy Company had the following information: At a manufacturing level of 5,000 units, variable and fixed manufacturing costs are $32 and $20 per unit, respectively.Selling price is $70 per unit._____ is the total manufacturing cost for 10,000 units.

A)$250,000
B)$700,000
C)$420,000
D)None of these answers is correct
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
79
Green Company planned to produce 12,000 units.Processing required 16,000 machine hours at a cost of $15,000 + $10.50 per machine hour.Actual sales were 14,000 units requiring 20,000 machine hours.Actual processing cost was $222,000._____ is the static-budget variance for processing.

A)$39,000 favorable
B)$39,000 unfavorable
C)$42,000 favorable
D)$42,000 unfavorable
Unlock Deck
Unlock for access to all 153 flashcards in this deck.
Unlock Deck
k this deck
80
Seinfeld Company planned to produce 12,000 units.This level of activities required 20 set-ups at a cost of $18,000 plus $500 per set-up.Actual sales were 10,000 units, requiring 15 set-ups and 12,000 machine hours.Actual set-up cost was $26,000._____ is the flexible-budget variance for set-ups.

A)$2,000 favorable
B)$2,000 unfavorable
C)$500 favorable
D)$500 unfavorable