Exercise 5
From past experience Toshihiro has found that the initial assembly-line design supplied by the engineers often needs to be tweaked. Consider the following questions that Toshihiro is considering:
Can the assembly line produce 300 units per day without using overtime?
Explanation
Verified
like image
like image

No. Assembly cannot produce 300 units pe...